RECOR Preliminary Stormwater Management Report - 20220198
Figure 3.2 – DRAINS Pre-development catchment
Figure 3.3 – DRAINS Post-development catchments
Figure 3.4 – DRAINS Split Post-development catchments
The results of the modelling against the range of design storms for the development under the existing and
proposed development conditions are shown in Table 3.1 Existing and proposed unmitigated site peak discharge
rates.
Project number 20220198
File RECOR Preliminary Stormwater Management Report - 20220198, 2022-08-19 Page 8 of 15
Revision 1