Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

RECOR Preliminary Stormwater Management Report - 20220198

of 28

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                            Figure 3.2 – DRAINS Pre-development catchment




                                           Figure 3.3 – DRAINS Post-development catchments




                                        Figure 3.4 – DRAINS Split Post-development catchments


The results of the modelling against the range of design storms for the development under the existing and
proposed development conditions are shown in Table 3.1 Existing and proposed unmitigated site peak discharge
rates.



Project number 20220198
File RECOR Preliminary Stormwater Management Report - 20220198, 2022-08-19                                    Page 8 of 15
Revision 1


P +61 7 5211 1003                          A 75 Noosa Dr, Noosa Heads Qld 4567   E [email protected]    recorconsulting.com
Log in to download the original file

RECOR Preliminary Stormwater Management Report - 20220198.pdf · 4.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.