Appendix 8 - Waste management plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnDetails of waste management – demolition phase
Materials on-site Destination
Reuse and recycling Disposal
Type of materials Est. Vol. Est. Wt. (t) ON-SITE OFF-SITE Specify contractor and landfill site
3
(m ) Specify proposed reuse or on-site Specify contractor and recycling
recycling methods outlet
Excavated Materials 250 375 Fill on-site Contractor TBC
Garden Organics 10 1 TBC
Bricks 40 80 TBC
Tiles 0.5 1 TBC
Concrete 160 400 TBC
Timber – please specify 40 30 TBC
Plasterboard 10 3 TBC
Metals 3 10 TBC
Asbestos TBC TBC TBC
Other waste e.g. ceramic tiles, 10 5 TBC
paints, PVC tubing, cardboard,
Details of waste management –construction phase
Materials on-site Destination
Reuse and recycling Disposal
Type of materials Est. Vol. Est. Wt. (t) ON-SITE OFF-SITE Specify contractor and landfill site
3
(m ) Specify proposed reuse or on-site Specify contractor and recycling
recycling methods outlet
Excavated Materials 20 35 Fill off-site Contractor TBC
Garden Organics N/A
Bricks 0.5 1 Landfill / crushed for recycling
if possible
Tiles 0.1 0.2 Landfill / crushed for recycling
if possible
Concrete 1 2.5 Landfill / crushed for recycling
if possible
Timber – please specify 1 1.8 Landfill / recycle off site if
possible
Plasterboard 1 1.8 Landfill
Metals 1 Steel recycler
Asbestos N/A
Other waste e.g. ceramic tiles, 10 5 Landfill or correct disposal as
paints, PVC tubing, cardboard, applicable