Original source · versioned page text
Appendix 8 - Waste management plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnDetails of waste management – use of premises phase
Materials Volume Proposed on-site storage or treatment Destination
Type of waste Expected (e.g. waste storage, compaction & (Compost, recycle or landfill) Specify contractor
expected to be quantities per recycling, composting)
Recyclables
Paper 100L Waste storage for collection Collection by waste collection contractor and transfer to
Cardboard 1000L and recycling Council recycling facility.
Glass 100L
Aluminum cans 100L
Plastic bottles 200L
Other;
Non-Recyclables
Food scraps 100L Waste storage for collection Collection by waste collection contractor and transfer to
Plastic 620L and landfill Council landfill facility
Garden organics 50L Collected directly by landscape Green waste facility
contractor from site
Other
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.