NOOSA COUNCIL IDAS Development Application Decision Notice 6 of 10
36. Council’s Water & Sewerage Inspector shall be given (7) days notice of intention to commence works. A
pre-start meeting shall be arranged prior to commencement of works by contacting Council’s Water &
Sewerage Inspector, Mr Trevor Mourilyan, Ph. 0417 780 830. Inspector is only available for pre-start
meetings, inspections and testing etc. between the hours of 6:30am to 4:00pm, Monday to Friday.
Inspector will not be available outside these hours unless prior approval is obtained from the Water &
Sewerage Capital Works Manager with any costs incurred by Council outside the hours nominated above,
met by the Contractor/Developer. These costs will be in addition to normal inspection fees.
37. Notwithstanding that Council has checked the plans with due care, where it is found during construction
that variations exist with Council's standards, Council standards shall apply.
38. It is the responsibility of the applicant to ensure that its consultants and contractors take all reasonable
care during the construction of the engineering works to ensure that Council property or facilities (such as
underground drainage, water supply and sewerage) are protected against any damage or interference
whatsoever.
If any Council property or facilities should be damaged by the applicant or any of its consultants or
contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the engineering
works, the applicant and/or its contractors shall forthwith notify the Assessment Manager and shall forthwith
rectify the damage to that property or facility at its cost to the satisfaction of the Assessment Manager prior to
the sealing of the survey plan and/or acceptance of the works on-maintenance. Alternatively, the applicant
may request the Council to carry out the rectification work at the applicant's cost, such cost being paid by the
applicant to the Council prior to the sealing of the survey plan and/or acceptance of the works 'on
maintenance' provided that in the case of emergency, the Council shall be entitled to rectify such damage at
the cost of the applicant such cost being paid prior to the sealing of the survey plan and/or acceptance of the
work 'on maintenance'.
39. The Contractor shall make all necessary arrangements for supply of water required for construction works.
The use of hydrant standpipes on Council mains will NOT be permitted. Contractors should contact
Council’s Water Section on phone 5449 5254 to obtain an application form for issue of a key to access
Council’s water tanker filling stations. Conditions of access and location of filling stations are detailed on
the application form.
40. All signage, including that for safety during construction shall be in accordance with the Manual of Uniform
Traffic Control Devices and Main Roads Department Roadworks Signing Guide.
41. As Constructed drawings in both hardcopy and digital format (ADAC) produced in GDA94 Zone 56
coordinate value to the standards and requirements of the Assessment Manager are required for Council
records. Such 'as constructed' drawings will be required prior to works being accepted "on maintenance",
where applicable. Requirements for "as constructed" information are detailed in the current version of
Council's Engineering Design Standards (Water & Sewerage) Manual.
Release of plans of survey and/or acceptance of the works on-maintenance will not be considered until
lodgement of satisfactory 'as constructed' records.
Please note that bonding of outstanding works will not be considered by Council.
42. The Consulting Engineers for the project are responsible for arranging all inspections and ensuring that all
relevant details required by Council are supplied. The attached Water and Sewerage Inspection Report
form is to be kept by you and presented to Council's Inspector at each stage of the development requiring
a meeting or inspection. The Inspector will sign the form at each stage when conditions have been
satisfied. The works will be accepted 'on maintenance' when this form, signed by the Inspector for each
stage, is returned with a letter requesting that it go 'on maintenance'.
43. It is Council policy that a maintenance bond be imposed on construction works during the maintenance
period. The maintenance bond shall be 5% of the agreed value of the development obligations, or $1,500
whichever is the greater amount. This bond must be lodged by (and shall only be accepted from) the
Developer for the works.
44. Construction work and other associated activities are permitted only during the hours of 7:00am and
6:00pm Monday to Saturday. No work is permitted on Sundays or public holidays, except where extended
hours are approved by the Assessment Manager or his nominee.
45. Cut-ins to existing live sewer are to be performed by Approved Contractor. Noosa Council Works
Inspector shall be present during any work on live sewer undertaken by contractor.
MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@9801a144\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2007.00001670.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 40 KB (small file)
- File type
No other editions are linked here.