Council archive · source document
7 avocet pde · OPW19/0077
Attached to the e-mail Operational Works Application OPW 19/0077 - DA Form 1 - Plans - 7 Avocet Pde, Peregian Beach.
Very large file (16.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Urban Certifiers Level 1 — 104 Currie St, Nambour Qld 4560 PO Box 227 BIiBli Qld 4560 Phone: (07) 5441 1777 Email: [email protected] ABN: 56 611 507 012 DECISION NOTICE Planning Act 2016 s63(2) Permit Number: 8140 Site Address: 7 Avocet Parade, PEREGIAN BEACH QLD 4573 Real Property Description: Lot 322 on P93113 Applicant: Mike & Jan Bolton Owner: Mike & Jan Bolton Builder: Foundation Homes QLD Pty Ltd Local Authority: Noosa Shire Council Date of Decision: 11 February 2019 Decision: The application is approved with conditions. Type of Approval: Development permit building work (assessable under the Building Act 1975) Type of Building Work: New Patio Demolition of existing Swimming Pool Construction of new Swimming Pool Building Classification: Class 10a — Patio Class 10b — Swimming Pool & Fence Conditions of Approval: The conditions of this approval are set out in Attachment 1. Assessment Benchmarks: The building assessment provisions (refer to s30 of the Building Act 1975) including: e National Construction Code 2016 — Volume 2 (NCC) Codes for Accepted Development: Noosa Plan — Detached House Code Approved Documents: In accordance with s86(2) of the Building Act 1975, the approved documents for this development permit have been marked with a red stamp bearing the permit number and date of approval. Further Development Permits | Nil Required: Referral Agencies: Nil Currency Period of Approval: In accordance with s85 of the Planning Act 2016, this development approval will lapse if the building work does not substantially start within 12 months from the date of approval (refer also to condition 3 in relation to completion times). Appeal Rights: Rights of Appeal relating to this decision are outlined in Attachment 4. Assessment Manager This development permit is issued by Urban Certifiers Pty Ltd, acting as Assessment Manager under the Planning Act 2016. Signature: Ei Building Certifier: Accreditation No.: Brett England A704375 7 AVOCET PARADE, PEREGIAN BEACH PERMIT NO 8140 PAGE 1 OF 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 43 pages
Page 2
ATTACHMENT 1 — CONDITIONS OF APPROVAL (Applied by the Assessment Manager) ADMINISTRATIVE CONDITIONS 1. This development permit for building works relates only to the works described in the decision notice. It does not include approval for any other building or structure that may be shown on the approved plans. Any building work shown on the plans that is accepted development does not form part of this approval (building work that is accepted development does not require an approval). 2. The conditions of approval overrules in any difference arising between it and the details shown on the approved plans 3. In accordance with s94 of the Building Act 1975, this development approval will lapse if the building work has not been completed and had a final certificate issued within 2 years from the date of approval (this is known as the condition time). 4. In accordance with s73 of the Building Act 1975, the applicant must ensure a legible set of the approved drawings for the building work is available on site while the building work is being carried out. 5. The building is not to be occupied until a final inspection has been carried out. MANDATORY INSPECTIONS 6. The builder must ensure that Urban Certifiers is given a notice of inspection advising when the building work has reached a stage that is ready for inspection. This notice must be given at least 48 hours prior to the inspection being required, and by telephoning Urban Certifiers on (07) 5441 1777 or 0400 889 253, or by emailing [email protected] notice is to be provided for the following stages: (a) For the pool barrier — prior to filling the pool with water (b) For the final stage — at completion of all aspects of the building work The builder must not start the next stage of the work until they have been given a certificate of inspection for the relevant stage, confirming that the stage complies with the building development approval. If the builder does not give the required notice of inspection, Urban Certifiers is obliged by s29 of the Building Regulation to advise the QBCC that the notice was not provided. CERTIFICATES TO BE PROVIDED 7. Prior to a Final Inspection Certificate (Form 21) being issued for the building, a number of contractor and/or consultant certificates are to be provided. These certificates must be from an approved competent person or a QBCC licensee. The aspects requiring certification will be confirmed at the final inspection; however certificates that are expected to be required are outlined in Attachment 2. SPECIAL CONDITIONS 8. Unless approved by Council, any wall or fence must not exceed a height of 2m above natural ground level (refer to notes on approved plans). 9. Unless approved by Council, the gatehouse must be setback 6m from the front boundary (refer to notes on the approved plans). 10. Any works in the road reserve (on the nature strip) are not part of this approval and must be authorised by the Noosa Council (i.e. the alterations to the driveway crossover, the landscaping and lighting). STANDARD CONDITIONS SITE PREPARATIONS 11. Any excavation or filling must be undertaken in a way that suitably prevents soil movement, generally by the construction of retaining walls or suitable batter protection measures. Adequate support must be provided to adjoining properties and buildings at all times during excavations and construction work. 12. Retaining walls or other types of soil retaining methods must be installed where the slope ratio for cut and or fill is greater than that specified in Table 3.1.1.1 the BCA. Embankments that are to be left exposed at the end of the construction works must be stabilised by landscaping to prevent soil erosion. 13. Retaining walls that exceed 1m in height require a building permit and must be designed by a registered engineer. 7 AVOCET PARADE, PEREGIAN BEACH PERMIT NO 8140 PAGE 2 OF 6
Page 3
14. Where retaining walls, fences, buildings or other barriers cause a damming effect or result in a concentrated flow of stormwater, an adequate drainage system must be installed. 15. | Excavation work for drains adjacent to buildings must be within the area shown in Fig 3.1.2.1 of the NCC. 16. Roof water is to be conveyed to the kerb and channel or the existing drainage system in accordance with AS/NZ3500.3-2015. 17. Surface water must be diverted away from Class 1 buildings. The external finished surface surrounding the slab must be drained to move surface water away from the building and graded at a minimum slope of 50mm over the first metre from the building. 18. Drainage must be carried out in a way that protects land, buildings and structures in the neighbourhood of the building or land. 19. The minimum soil cover to be provided to Class 6 UPVC stormwater drains is 100mm. This may be reduced to 50mm under paved or concrete areas. In areas subject to light vehicular traffic the minimum required cover is 75mm under reinforced concrete or 100mm under paving. 20. Atermite management system must be installed to deter termites from gaining entry to the building via a concealed route. The termite management system must be selected appropriate to BCA Qld Table 3.1.3.1 and comply with AS3660.1-2010, or have passed the test results required by Section 5 of AS3660.3-2010. A durable notice must be permanently fixed to the building in a prominent location, such as the meter box or kitchen cupboard. FRAMING 21. Pursuant to Section 70 of the Building Act 1975 work must not start on the frame stage until the following details have been submitted to Urban Certifiers with a Form 15 Design Certificate: e Vergola Roof System — manufacturer's roof system design and layout. 22. Any steel framing must be constructed in accordance with NCC Part 3.4.2 and 3.4.4. 23. All timber framing must be constructed in accordance with NCC Part 3.4.3 and AS1684.2-2010. ROOF & WALL CLADING 24. Gutters and downpipes must be provided in accordance with NCC Part 3.5.2. Gutters must be installed with a minimum fall of 1:500, be suitable supported by brackets at 1.2m centres and have suitable overflow measures. Downpipes must serve no more than 12m of gutter length and be located as close as possible to valley gutters. GLAZING 25. All new glazing is to be supplied and installed in accordance with the requirements of BCA Part 3.6, and relevant parts of AS1288-2006 and/or AS2047-2014. SAFE MOVEMENT & ACCESS 26. All stairs are to be constructed in accordance with NCC Part 3.9.1. Stairs are to have a maximum of 18 rises. Stepped quarter landings must not have more than three winders. Riser openings must not allow a 125 mm sphere to pass through between the treads. The minimum allowed tread dimension is 240 mm, the maximum riser dimension is 190 mm, and the slop relationship (2R&G) is to be between 550-770 mm. All dimensions within the stair flight must be constant throughout. 27. Abalustrade is required to be provided along the side of any stair or floor if its level above the surface beneath is more than 1m. Any required balustrade must be constructed in accordance with NCC Part 3.9.2, so it has a minimum height of 1m and a maximum gap of 125mm. 28. Stairs, ramps and landings must be provided with a suitable slip resistant surface as required by Part 3.9.1.4 of the BCA. Where timber or tiles are used as the finished surface, a certificate of compliance is to be provided. SWIMMING POOL 29. The pool builder must arrange for an inspection of the pool and the pool fence. After a satisfactory inspection, a Form 17 will be issued (or Form 16 for a temporary fence). The pool must not be filled with water until the relevant Form 16 or 17 has been issued. Inspections should be arranged by providing at least 48 hours’ notice and by telephoning (07) 5441 1777 or emailing [email protected]: The pool builder or owner may wish to have the reinforcement of the pool shell inspected by a registered engineer, however this is not a mandatory inspection. 30. Where an aluminium or glass pool fencing is used, a certificate from the manufacturer (or pool fence contractor) confirming the fencing panels comply with the appropriate Australian Standard must be provided prior to the final certificate being issued. The certification should be provided as a Form 15 Design Certificate. 7 AVOCET PARADE, PEREGIAN BEACH PERMIT NO 8140 PAGE 3 OF 6
Page 4
31. 32. 33. 34. 35. 36. 37. 38. 39. 40. 41. 42. 43. 44, 45. Any windows opening into the pool enclosure must be protected in accordance with clause 2.7 of AS1926.1. Direct access via doorways is prohibited. Direct access to the pool enclosure from a patio, balcony or the like is only permitted if one of the sides is permanently open (not fitted with blinds, insect screening, shade cloth or the like). Where the swimming pool is constructed closer than 1.5m to the property boundary a solid fence must be constructed to prevent water entry onto adjoining lots. The fence must be at least 1.8m high above finished ground level (but not greater than 2m above natural ground level), erected between the swimming pool and the boundary of the lot; and the top of the wall/fence must be at least 1.0m above the top of the coping of the pool. All building work must be carried out in accordance with the Building Act 1975, the Building Regulation 2006, the Queensland Development Code, and the National Construction Code and relevant Australian Standards. All building work is to be carried out within the boundaries of the property. Where work is proposed in close proximity to the boundaries, it may be necessary to have a cadastral surveyor identify the boundary alignment. The pool fence and gates must be designed and constructed in accordance with the provisions of Chapter 8 of the Qld Building Act 1975, Part 4 of the Building Regulation 2006, the Queensland Development Code Part MP3.4 and the appropriate parts of Australian Standards AS 1926.1-2007 & 1926.2-2007. A warning sign must be displayed in accordance with Section 14 Building Regulation 2006. The sign must warn members of the public that a swimming pool is under construction on the property and there is a potential danger to young children accessing the land (e.g. Danger. Swimming pool under construction. Keep children out). The sign must be displayed on the land before the construction of the swimming pool starts, and until a final certificate has been issued. A resuscitation sign must be installed in accordance with Section 13A of the Building Regulation 2006. It must be attached to the barrier for the pool, or displayed near the pool, so that the sign is conspicuous and easily visible to a person near the pool. Prior to commencing work, the builder must locate all infrastructure services (i.e. sewer & stormwater mains) and easements on the property, and ensure the required setback clearances will be provided. For swimming pools located in sewered areas or near stormwater mains, the outer part of the pool must be located no closer than 1.2m to the pipe, and be founded below the zone of influence. Where it is necessary to alter the existing house drainage (domestic sewer), a licensed Plumbing & Drainer must undertake the work and obtain the relevant approvals. Building work over or adjacent to existing sanitary drainage must comply with AS/NZS 3500.2.2-1996 (National Plumbing and Drainage), Part 2.2 (Sanitary Plumbing and Drainage — Acceptable Solutions). Drainage around the pool must be in accordance with the requirements of the design engineer. Surface water drainage must not be directed towards other buildings or onto neighbouring allotments. The water recirculation system of the swimming pool must comply with AS1926.3-2010. If the filter installed produces backwash, the backwash must be discharged to the sewer. 7 AVOCET PARADE, PEREGIAN BEACH PERMIT NO 8140 PAGE 4 OF 6
Page 5
ATTACHMENT 2 — CERTIFICATES FOR PERMIT No. 8140 The following tables provide a list of the certificates that are likely to be required before a Final Inspection Certificate (Form 21) can be issued for the building work. This list is subject to confirmation by Urban Certifiers after carrying out a final inspection, and additional certificates may be required. Certificates must be from an approved competent person or a QBCC licensee. Certificates are required to be in the approved form (Form 15 or 16 as appropriate). In some cases it will be necessary for these certificates to be supported by evidence of suitability. STAGE CERTIFICATES No! Stage Notes a) | Pool Barrier This certificate can only be issued by a building certifier. b) | Final Stage This certificate can only be issued by a building certifier. ASPECT CERTIFICATES No! Type Description a) | Structural aspects Form 16 from the builder confirming the structural aspects have been constructed in accordance with the approved plans and AS1684.2 and AS2870.1. Altematively, the structural aspects can be inspected and certified by a registered engineer (RPEQ) or a building certifier. b) | Vergola Roof Form 15 from the manufacturer of the vergola roof system confirming compliance with relevant Australian Standards (must be certified by a registered engineer RPEQ). A copy of the relevant plans should also be provided. c) | Termite management (if applicable) Form 16 from a QBCC licensed termite protection contractor, confirming the building has been provided with a termite management system in accordance with BCA Part 3.1.3 and AS3660.1-2014. A copy of the treatment plan/diagram should also be provided. d) | Pool Fence Where an aluminium or glass pool fencing is used, a certificate from the manufacturer (or pool fence contractor) confirming the fencing panels comply with AS1926.1-2007 and/or AS1288-2006 and/or AS2208-1996. 7 AVOCET PARADE, PEREGIAN BEACH PERMIT NO 8140 PAGE 5 OF 6
Page 6
ATTACHMENT 3 — ADVISORY NOTES These advisory notes do not form part of this approval, however are intended as information and guidance only. (a) | This approval relates to development requiring approval under the Planning Act 2076 only. It is the applicant's responsibility to obtain any other necessary approvals, licences or permits required under State and Commonwealth legislation or Council local law, prior to carrying out the development. For information about Council, State and Commonwealth requirements please consult with these agencies directly (b) | Unless the rights of appeal are exercised, this development approval takes effect from the date the decision notice is given. (c) | The inspections nominated in the condition are mandatory inspections under s24 of the Building Regulation 2006. If the builder for the work is licensed builder, and the builder does not provide a notice of inspection at each required stage of the building work, the building certifier must notify the QBCC of the fact. This may result in a monetary penalty to the builder. (d) | Where work is altered from that shown on the approved plans, and it is not deemed by the building certifier to be ‘generally in accordance’ with the approval, an application to change the development approval (a change application) must be submitted in accordance with s 78 & 79 of the Planning Act 2016. The issuing of a Final Certificate cannot be made until the change application has been approved. A change application must be made in the approved form and accompanied by the required fee. (e) The applicant is requested to ensure all works are completed, inspected and finalised prior to the condition time (refer to condition 3). An extension may be applied for (prior to the condition time), but must be made in the approved form and accompanied by the required fee. (f) No excavation or filling is permitted to occur in any easement without the approval of the holders of the registered interests in the easement. (g) | Any new filling and excavation must be within the limits provided in the local planning scheme. (h) For the duration of the construction period and until all disturbed areas are revegetated or paved, adequate erosion and sediment control devices and site management practices are required to prevent soil erosion and contamination of the stormwater drainage system and waterways. (i) Consent from the Local Authority may be required for the removal of vegetation. (j) The removal of any asbestos must be undertaken in accordance with relevant legislation. (k) Advice regarding the disposal of construction and demolition waste should be sought from the local government. ATTACHMENT 4 — APPEAL RIGHTS The rights of an applicant to appeal to a tribunal or the Planning and Environment Court against a decision about a development application are set out in chapter 6, part 1 of the Planning Act 2016. For particular applications, there may also be a right to make an application for a declaration by a tribunal (see chapter 6, part 2 of the Planning Act 2016). Appeal by an applicant An applicant for a development application may appeal to the Planning and Environment Court against the following: e the refusal of all or part of the development application e aprovision of the development approval e the decision to give a preliminary approval when a development permit was applied for e adeemed refusal of the development application. An applicant may also have a right to appeal to the Development tribunal. For more information, see schedule 1 of the Planning Act 2016. Contact details and further information can be found on the following websites: Development Tribunals: http:/Avww.hpw.gld.gov.au/construction/BuildingPlumbing/DisputeResolution/Pages/DevelopmentTribunals.aspx Planning & Environment Court: http:/Awww.courts.gld.gov.au/courts/planning-and-environment-court Timeframes apply for the lodgement of an appeal. 7 AVOCET PARADE, PEREGIAN BEACH PERMIT NO 8140 PAGE 6 OF 6
Page 7
NOTICE OF COVER
QUEENSLAND HOME WARRANTY SCHEME
Subject to the limitations and exclusions expressed in schedule 6 QBCC Regulation 2018
COVER COMMENCEMENT DATE 11 January 2019
NOTIFICATION NUMBER 013873933
THE LAND Address: 7 AVOCET PDE
PEREGIAN BEACH
Real Property Description: Lot 322 On P 93113
THE CONTRACTOR Name Foundation Homes Qld Pty Ltd
Address: 19 Amani Place
Maroochy River QLD 4561
Licence No.: 15095686
Licence Class:
Builder - Low Rise
The Insured Residential Construction Work
Type of Work Description of Work
Reno/Alter/Add/Repair/Extension Swimming Pool
Insurable Value: $338,438.58
Premium Paid: $4,032.75
OPTIONAL ADDITIONAL COVER No
NOTE:
This Notice is issued in respect of Residential Construction Work as described in the Queensland Building and Construction
Commission Act 1991 and confirms for the assessment manager or compliance assessor that the appropriate insurance
premium has been paid as required by section 68E of the Act. These particulars are current at the date of issue but may
change subsequent to that date.
IMPORTANT INFORMATION:
Ensure you obtain and keep the following documents in case you need to make an insurance claim at any time within the 6
year 6 month insurance period:
A complete copy of the contract, signed by all parties
All contract variations, in writing and signed by all parties to the contract
A copy of the building specification and approved building plans
Receipts or other evidence of all payments made to the builder.
NOTE THE FOLLOWING EXCLUSIONS AND LIMITATIONS:
Duplex if the duplex is not completed by the contractor, any claim for completion, including defects in the
incomplete work, is limited to $200,000.
Three or more living units - a person who enters into 1 or more contracts to build 3 or more living units is not entitled
to assistance. Subsequent purchasers of a unit are entitled to assistance.
Construction Management or Cost-Plus contracts where these types of contracts have been used there is no
entitlement to make a claim to complete incomplete works. There is cover for defects.
Page 8
PORTABLE Leave | LONG SERVICE Notification and Payment Confirmation This form is issued in accordance with the Building and Construction Industry (Portable Long Service Leave) Act 1991 s77(2). Form BCI 14vo. BUILDING AND CONSTRUCTION WORK DETAILS QLeave levy number: S182703 Date notified: 22 Jan 2019 Building and construction work description: SWIMMING POOL Lot no.: 322 Plan no.: 93113 Building and construction work address: 7 AVOCET PDE Suburb: PERIGIAN BEACH Postcode: 4573 Total cost of work (GST exclusive): $307,800.00 Total levy paid: $1,462.00 Exempted cost of work (GST exclusive): $0.00 Start date: 04 Feb 2019 Finish date: 31 May 2019 Council: NOOSA SHIRE COUNCIL Certifier: URBAN CERTIFIERS Owner: MIKE BOLTON Principal contractor: THE TRUSTEE FOR THE FOUNDATION HOMES QLD TRUST QLeave has issued this form to confirm that notification and payment has been received. Under s.77 of the Building and Construction Industry (Portable Long Service Leave) Act 1991, all obligations have been met. Your Assessment Manager (Local Government or Private Certifier - Class A) will require a copy of this form prior to the issue of a development/building permit. CONTACT QLEAVE Unit 1 62 Crockford St, Northgate Q 4013 | PO Box 315, Virginia BC Q 4014 Freecall 1800 803 481 | Email [email protected] | Web www.qleave.qld.gov.au BUILDING AND CONSTRUCTION WORK COMPLETED When your building and construction work reaches practical completion, you will be required to submit your final costs and completion date to QLeave. To provide QLeave with these details please complete the building and construction work completed form available at www.qleave.qld.gov.au and send it to [email protected] PAID Receipt number Date paid Amount paid 90574920596 22 Jan 2019 6:02:32 PM $1,462.00 Page 1 of 5
Page 9
CURRENT TITLE SEARCH [OCR of page images] CURRENT TITLE SEARCH NATURAL RESOURCES, MINES AND ENERGY, QUEENSLAND Request No: 30484102 Search Date: 30/01/2019 16:02 Title Reference: 13833124 Date Created: 11/01/1966 REGISTERED OWNER Dealing No: 713671765 19/01/2011 JANET MURIEL BOLTON ESTATE AND LAND Estate in Fee Simple LOT 322 CROWN PLAN P93113 Local Government: NOOSA EASEMENTS, ENCUMBRANCES AND INTERESTS 1. Rights and interests reserved to the Crown by Deed of Grant No. 13833124 (ALLOT 322 SEC 14) 2. MORTGAGE No 713671766 19/01/2011 at 12:10 COMMONWEALTH BANK OF AUSTRALIA A.B.N. 48 123 123 124 ADMINISTRATIVE ADVICES - NIL UNREGISTERED DEALINGS - NIL CERTIFICATE OF TITLE ISSUED - No Caution - Charges do not necessarily appear in order of priority ** End of Current Title Search ** COPYRIGHT THE STATE OF QUEENSLAND (NATURAL RESOURCES, MINES AND ENERGY) [2019] Requested By: D-ENQ CITEC CONFIRM Page 1/1
Page 10
P93113 VO Page 1 of 1 Not To Scale
: esata is Yer Pastel
“lA. 283° oF See.13 | - . - ~
- 3y (4 OFS 2628
SAR MBE IR ABO nt)
+ BGR 18K 75193 (e082)
Bf
9 2225 BB.an1*) For Additional Pian &
Document Notings
Refer 10 CISP
—TDESERIPTION OF COUNTRY —
_Ooen benksia. ‘
Sandy slopes.
AREA OF NEW ROAD tic. narivesry
B40 PRB1 yy oe. 3s. 7 .
toy SSS (a, 2, 22 49,44, 31,38 1,40,
ot + | BSuz | 99, 36,16,78) ; :
et soso wre)
Wt 700.0 fe 1 vy i
af 221 y 8 |
Bea] on fe ye
| see Revie Lootah
[902 futlh 92582030 ql sh BL ign § \
or diate tse wl
Zit 4 Be ra ey |
Br oe, re NES :
a : ay * eer" ee! ;
9 gl Ohokr sesen DLAS S i
2 °| 342 BBS 8 Q :
ry \
S
x , BS Q i
ig
Q is }
v 5 :
8
65 " as
Meh, 2650 . 3 y y le :
al i g
. os. 3 Bes te azz <E
aN Free hoki. T6TY28'7.589F yol
> A t C7258 le f
108 Wl 5
30 :
: |
J i
4
109 i
PDH FB
§ J
8 .
hh Bo
ve a
qe :
x poe E. 4
Q Lor0 & \ ‘ i
oan ‘
3 Hie seg a Sa
§ 89-22 ey" (000,38) (a fue, i
3597 nc
% ee "GAS AE ORR)
PARADE yo
~~ DIAGRAM —
Scale: 30 (ks.“/ tn,
AQGae on RIG AE cat od
122 cate b
Aahed an Meh
PeREGIAN BEACH
CROWN COPYRIGHT RESERVED P OF ut
aa Allols 2OR- 227 238T289 5265 289A S43 |
ae ae
sr recon th ee 1 Dito of tnsteuctias PANATE PORTION « Allots. 320° B41 of See tt.
sampled the senrary represented by thasplanone which cane wrillete } Baits of transmassgan df plamsibe 8.26
heteiringsil lath the tras suoveed bx ed tat the bo (ee emg Ries CE PARISH OF
oe it PO a bg, | [mmm RSet ae 223g PARISH O
latins of the Sucrnie Conceal Drpartauand | Vike Meh eyor | tater’ Paysnanel fee County of
Lf | Hee Me FOP chanted by ALB. BETES. Land bgents\
chen ond. Po . Sales Keyister vol. Fat District of |
Marion Seale# BChains toan uch, Cat.N?
Copyright protects the plan/s being ordered by you. Unauthorised reproduction or amendments are not permitted.
Page 11
79752973
15675471
1/02/2019
Map Tile: 1
1:1000
[OCR of page images]
UNITYWATER DBYD MAP
Sequence Number: 79752973
Job Number: 15675471
Printed On: 1/02/2019
Emergency Situations
Call Unitywater:
1300 086 489
This information on this plan is valid
for 30 days from "Printed On" date.
Legend
_____} Extent of Unitywater Area Sewer Gravity Main
Trunk Main
Reticulation Main
Water Pump Station
Water Service ——— Overflow Main
%& Water Valve === Sewer Pipe (Abandoned)
Sewer Pressure Main
——— Water Pipe (Abandoned)
Pressure Sewer
@ = = Water Hydrant
<== Rising Main
Water Fitting Vacuum Main
Water Main ;
Pressure Sewer Service
Trunk Main
Sewer Service
Reticulation Main
Recycled Water
Sewer ae
[®] Recycled Water Pump Station
(Sewer Pump Station
% Recycled Water Valve
Sewer Manhole
@ = Recycled Water Hydrant
)
% Sewer Valve
a [H_ Recycled Water Fitting
Sewer Fitting
Recycled Water
=== Pipe (Abandoned)
Recycled Water Main
Map Tile: 1
Scale: 1:1000
(If printed at 100%
on A3 size paper)
Unitywater
Dial Before You Dig
Geospatial Information Systems
Ground Floor, 33 King St
Caboolture QLD 4510
Inquiries: 1300 0 Unity (1300 086 489)
Email: [email protected]
Disclaimer
These Maps are supplied under the following conditions:-
Mapping details are supplied from information contained in Unitywater’s
records which may have been furnished to Unitywater by other persons.
Unitywater gives no warranty or guarantee of any kind, expressed,
implied, or statutory, to the correctness or accuracy of the map details
or the degree of compliance with any standards in this matter. Persons
making decisions with financial or legal implications must not rely upon
the map details shown on this plan for the purpose of determining
whether any particular facts or circumstances exist and Unitywater
(and its officers and agents) expressly disclaim responsibility for any
loss or damage suffered as a result of placing reliance upon this information.
38
352 270P93113.
235P93111 34,
272P93113
234P93111
350
oGTP524 \——__
| 32]
ay
32
348 | 32/32
233693111 274P93113
oGTP638
26
2SP120739
OSP116876 |
232P93111
28 28
277P93113
231P93111
230P93111
18
280P93113
20
1GTP103362 279P93113
229P93111 OGTP103362
16,
wy 16
2GTP103362
16% 16
a
3GTP103362
228P93111
12
283P93113.
227P93113
284p93113 10
OSP186021 -
— 8 } —
S 8
\ ac}
| \ M6
_ 0SP192028
292P93112
293P93112
224P93112
AVOCET PARADE
19
[_7- OBUP9123,
| octest| |
WA 19] 19
tS _
i OGTP539
w 15
M15
[28109738
_ M15
OBUP3338
13
325P 93113
11
324P93113
337P93113,
56
54
338P93113.
322P93113
339P93113
1$P270285,
320P93113
290P93112
42
159CP839188
Page 12
Mike and Jan Bolton tc Proposed Pool & External Works - 7 Avocet Parade, Peregian Beach G GARLAND DESIGN “APPROVED WITH CONDITIONS: 0 Jasmin Chandler | 0408 866 692 © [email protected] Permit No. 8140 Date 11 FEB 2019 9 anes Thisis an approved document Refer tothe Decision oO Heo deia and exnaborsappings hwo. Lo JB \ssuED BY URBAN CERTIFIERS PTY LTD
Page 13
GENERAL NOTES TO BE READ IN CONJUNCTION WITH ALL DRAWINGS; REFER TO CONSULTANTS DRAWINGS AND SPECIFICATIONS FOR CO- ORDINATION OF SERVICES AND EXTENT OF WORKS. STRUCTURAL DETAILS REFER TO CONSULTING ENGINEER'S DRAWINGS FOR ALL STRUCTURAL DETAILS. DIMENSIONS. DO NOT SCALE FROM DRAWINGS. GIVEN DIMENSIONS ARE TO HAVE PRIORITY OVER SCALED DIMENSIONS. CONSTRUCTION ALL DESIGN, CONSTRUCTION AND MATERIALS TO BE IN ACCORDANCE WITH: AUSTRALIAN STANDARDS; NATIONAL CONSTRUCTION CODE (NCC); QUEENSLAND DEVELOPMENT CODE (QDC); BUILDING REGULATIONS; MANUFACTURERS SPECIFICATIONS AND INSTALLATION DETAILS FOR MATERIALS USED. ALL DESIGN, CONSTRUCTION AND MATERIALS TO BE IN ACCORDANCE WITH THE NOOSA PLAN SECONDARY DWELLINGS & ANCILLARY DWELLING UNITS CODE AND MUST BE WHEELCHAIR ACCESSIBLE SETOUT CONTRACTORYBUILDER TO CONFIRM ALL DIMENSIONS, LEVELS, BOUNDARY LINES AND PEGS ON SITE PRIOR TO. COMMENCEMENT OF ANY WORK. SHOULD SITE CONDITIONS DIFFER FROM THOSE INDICATED. SEEK INSTRUCTIONS FROM THE DESIGNER. DRAINAGE ADEQUATE SITE DRAINAGE SHOULD BE INSTALLED TO ENSURE THAT NATURAL RUNOFF IS DIRECTED AWAY FROM THE PROPOSED WALLS AND FOOTINGS. SUBSURFACE DRAINAGE MUST BE INSTALLED BEHIND RETAINING WALLS TO PREVENT DEVELOPMENT OF HYDROSTATIC PRESSURE. SURFACE WATER DRAINAGE TO. BE IN ACCORDANCE WITH NCC PART 3.1.2.3. EROSION AND SEDIMENT CONTROL PROVIDE EROSION AND SEDIMENT CONTROL STRUCTURES, TO PERIMETER OF WORK AREA AND MAINTAIN IN A FUNCTIONAL CONDITION AS REQUIRED BY THE LOCAL AUTHORITY, BUILDING PLATFORM PLATFORM IMMEDIATELY SURROUNDING THE BUILDING IS TO. FALL AWAY FROM FROM THE BUILDING AT A MINIMUM SLOPE OF 1 IN 20. CUT AND FILL CUT AND FILL BATTERS NOT TO EXCEED A MAXIMUM SLOPE OF 1IN1 ROOF SHEETING ROOF SHEETING TO BE INSTALLED IN ACCORDANCE WITH AS1562.1 AND THE MANUFACTURERS SPECIFICATION FOR THE RELEVANT WIND CLASSIFICATION APPLICABLE TO THE SITE. STEELWORK ALL STEELWORK FITTINGS AND FIXTURES SHALL BE HOT DIPPED GALVANISED. TIMBER ALL WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH AS1684.2 AND ENGINEER'S DETAILS. STORE TIMBER 150MM MINIMUM CLEAR OF GROUND, EVENLY SUPPORTED, WELL VENTILATED AND PROTECTED. @ GARLAND proceeding ithe vers, 0 Jasmin Chandler | 0408 866 692 [email protected] 5 oy 3 For engin inom, Engen a The BildngDesnes craving and reormendatons salt proceence cr acetal aings The uberis bbe rofed medal, stolen era, dzepnces oot brome apart andro Copy The dein cantntshon cn his caning rena he prope of GarendDasgn ndispridedrly fore uce dest Tiscraving nay be copied rhe eles riod rad chargedin any ayia pr wien ep of ater Das, USE TIMBERS WITH DURABILITY CLASS AND PRESERVATIVE TREATMENT SUITED TO INTENDED APPLICATION AS OUTLINED IN AS 1684.2. MASONRY ALL MASONRY CONSTRUCTION TO IN ACCORDANCE WITH AS3700. GLAZING ALL GLAZING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH AS2047 AND AS1288. MANUFACTURER TO PROVIDE CERTIFICATION ON COMPLETION. SHOWERS. AAA SHOWER ROSES TO BE SUPPLIED IN ACCORDANCE WITH QDC. STORM WATER DRAINAGE STORM WATER DRAINAGE MANAGEMENT SYSTEM TO BE IN ACCORDANCE WITH AS/NZS 3500,3.2. SURFACE DRAINAGE TO DISCHARGE EVENLY WITHIN THE SITE AND WITHOUT NUISANCE TO THE ADJOINING PROPERTIES. LIGHTING ARTIFICIAL LIGHTING MUST BE PROVIDED IN ACCORDANCE WITH AS1680. ENERGY EFFICIENT LIGHTING MUST BE 80% MIN OF THE TOTAL FIXED ARTIFICIAL LIGHTING AS PER QDC. nforson shal tak precedence oer achicha ranings, 7 Avocet Pde, Peregian Beach Mike and Jan Bolton LANDSCAPING NOTES MINIMUM DENSITY REQUIRED: SHRUBS 1.5 METRE CENTRES SMALL SHRUBS / GROUNDCOVERS 0.5 - 1 METRE CENTRES USE MATURE PLANTS WHEREVER POSSIBLE; MINIMUM SIZING REQUIRED: FEATURE TREES 45LT STREET TREES 25LT OTHER TREES 300MM LARGE SHRUBS 200MM GROUNDCOVERS 150MM PREPARATION OF GARDEN BEDS FOR PLANTING: CULTIVATE EXISTING SOIL IN NATURAL GROUND TO A MINIMUM DEPTH OF 150MM. IMPORT CLEAN TOPSOIL (SANDY LOAM) TO A MINIMUM DEPTH OF 300MM, ABOVE ORIGINAL GROUND LEVEL. ORGANIC MATTER, OR GYPSUM ETC, MAY ALSO BE ADDED AS NECESSARY TO IMPROVE THE SOIL FOR THE BEST POSSIBLE GROWTH. TEST THE SOIL USING A 'SOIL TEST KIT’ TO ENSURE IT IS HEALTHY AND AMEND AS NECESSARY. ALL GARDEN BEDS TO BE MOUNDED 300MM MIN AT CENTRE OF BED, ABOVE FINISHED PAVEMENT LEVELS, TO PREVENT ANY PONDING AROUND PLANTS. FERTILIZE USING A SLOW RELEASE FERTILIZER IN ‘PILL’ OR ‘GRANULE’ FORM, AT TIME OF PLANTING, ENSURE THAT FERTILIZER DOES NOT DIRECTLY CONTACT ROOTS: MAINTENANCE: A MAINTENANCE REGIME MUST BE PROGRAMMED TO MAINTAIN MULCH, WATER, FERTILIZER, PRUNING AND THE CARE AND/OR REPLACMENT OF ANY DAMAGED OR DISEASED PLANT. SHORT TERM: FOR THE FIRST FOUR WEEKS ALL PLANTS MUST BE WATERED FOR A MINIMUM OF 20MINS PER DAY REDUCING TO 10MINS PER DAY FOR FOLLOWING 5 MONTHS (ALWAYS WATER IN RELATION TO RAINFALL). IRRIGATION INSTALL AN AUTOMATIC IRRIGATION / DRIP SYSTEM WITH TIMER TO ALL NEW LAWNS & GARDENS. PLACE IRRIGATION LINE AFTER PLANTING AND PRIOR TO MULCHING. USE ONLY SUN 'HARDENED' PLANTS. ENSURE HEALTHY ROOT SYSTEM TO ALL PLANTS TO BE USED. UNDER NO CIRCUMSTANCES ARE ROOT BOUND PLANTS TO BE USED. TREES: ALL 45L TREES AND LARGE SHRUBS WILL NEED TO BE STAKED SECURELY USING 1800MM STAKES X 2 OR 3 AS NECESSARY AND TIED TO STAKES USIND HESIAN WEBBING, (TO PREVENT PLANT DAMAGE UNTIL ESTABLISHED). MULCH ALL GARDENS ARE TO BE MULCHED WITH 'PINE BARK' MULCH TO A MINIMUM DEPTH OF 100MM , TO BE KEPT 50MM FROM STEMS OF PLANTS TO AVOID COLLAR ROT. DRAINAGE: ENSURE ADEQUATE DRAINAGE IS INSTALLED BELOW GARDENS AND PAVED AND CONCRETED AREAS. Date: Rev ort12018 Working Drawings for BA DRAWING LIST SHEET NAME SHEET NUMBER | ISSUE DATE | REVISION cover ——SSCSC~d TC. z0re 1 Site Plan Wi 1 7 018 1 1 Understorey Landscape Plan WI 4 7. 018 1 07.11.2018 [1 Elevs & Section }WD.2.01 17.11.2018 1 1 7 Perspectives 07.11.2018 PLANT LEGEND Bougainvillea Vine Star Jasmine Vine Variegated Star Jasmine Dichondra Silver Falls Anthurium Calathea Prayer Plant Gardenia Grandiflora Star Alternanthera Little Ruby <} nora Prince of Orange & Bromeliad Sugar Plum Magnolia Little Gem Hibiscus DEVELOPMENT PERMIT FOR BUILDING WORKS APPROVED WITH CONDITIONS Permit No. 8140 Date 11 FEB 2019 This isan approved document. Refer to the Decision Notice for detals and conditions applying tothe work. ISSUED BY URBAN CERTIFIERS PTY LTD Title General Scale As indicated Issue Date Notes 07.11.2018 Des Jc Check:JC Project # 18.128 Drawing #: Issue WD.0.02 1 By fa} 2 ey 711112018 10:15:16 PM
Page 14
RL: 13.73
Add LIIOAV
BH Site Plan
7.150
BM: NAIL IN BITUMEN
@
NEW PORTION OF DRIVEWAY
CONCRETE TO MATCH EXISTING.
DRIVEWAY MAY REQUIRE PAINTING,
NOTE: THIS BUILDING PERMIT DOES NOT APPROVE ALTERATIONS TO THE
DRVEWAY CROSSOVER OR ANY WORKS ON THE NATURE STRIP. THE BUILDER
WILL NEED TO LIAISE DIRECTLY WITH NOOSA COUNCIL FOR THESE WORKS.
TRAFFICABLE CONCRETE COVER
z
4 EXISTING DRIVEWAY EXISTING GARAGE
(4770 SETBACK TO OMP,, (340
1 :
50
be
5
7
| PROPOSED
sPA__|
z
Zo
| Lal PROPOSED PROPOSED
POOL LAWN
6
5
Zo
ear =
tt
©
° 3
ELECTRICITY PROPERTY POLE & METERBOX
TO BE RELOCATED AS SHOWN
MAIN CONTRACTOR NOTE:
1. WATER, SEWER, POWER & COMMUNICATION CONNECTIONS
REFER TO SURVEY DRAWINGS & DBYD.
BUILDER TO DETERMINE EXACT LOCATION ON SITE.
2. ALL DIMENSIONS & LEVELS ARE SUBJECT TO SETOUT ON SITE
3. FOR ALL STRUCTURAL FRAMING, FIXING CONNECTIONS,
CONCRETE & REINFORCING DETAILS REFER TO STRUCTURAL
ENGINEERS DRAWINGS
PAINT TO CLIENT SELECTION 'ULTRAPAVE' OR SIMILAR
87° 28' 00"
ROPOSED
"ATIO Al
EXISTING WALLS BELOW
EXISTING sa
a
LOT 322
830.79m’
EXISTING WALLS BELOW,
uns 32.55 m
4, DRIVEWAY TO COMPLY WITH LOCAL BUILDING REGULATIONS
5. FINISHED GROUND LINE TO FALL AWAY FROM BUILDING AS PER
BCA 3,1.2.3
DEVELOPMENT PERMIT FOR BUILDING WORKS
APPROVED WITH CONDITIONS
Permit No. 8140 Date 11 FEB 2019
Thisis an approved document. Refer to the Decision
Notice for detalls and conditions applying tothe work
RP.D
LOT 322 ONIP93113
PARISH OF WEYBA
COUNTY OF MARCH
NOOSA SHIRE COUNCIL
, SITE AREA 830,79m?
LEGEND.
Mark Description
BA Balustrading - 1.2m min
Frameless Glass (Pool Safe)
BBQ Barbeque - Weber Built In
BS Bin Storage Area
F415 1.5m High Hardwood
Horizontal Decking Enclosure
F18 1.8m High Timber Paling
Fence to match existing
/ F2.0 2m High Hardwood Horizontal
& Decking Fence
S FB2.0 2m High 190 Concrete Block
v Wall
[ FW Floor Waste
/ GBP Gas Bottle Position
LB Letterbox
E MB Meterbox (Relocation TBC)
Nx PE Pool Equipment
ss POT Large Feature Pot
RBL Rendered 190 Concrete Block
SHR Outdoor Shower
SK Stainless Steel Sink
4 TAP Garden Tap
oft Tu 900x900 Slip Resistant Tile -
a’ Grey Flow
TL2 900x900 Slip Resistant Tile -
Silver Flow
TL3 Mosaic Tile - Silver Flow
TS Timber Seating
WM Water Meter
WT Water Tank
EXISTING SITE PLAN LEGEND
RETAINING WALL —_e_._ Electrical
LL. VY ——nbn— _ NBN Cable Trench
EXISTING ——s—— Sewer Main
<*,BOREs O'H — Overhang
OMP Outermost Projection
CUT AND FILL SCHEDULE
[p2on? Joaonr [O20 |
Taw Area
Patio Area [797 ap _[1.40mP [34am |
Pool [10.85 m?_]0.00 m* [10.85 m= |
Pool Surround
Spa
je.79 mP_]o.00 me [87am |
\ a 42.13 m* 34.27 m*_ -7.87 m* s
SUED BY URBAN CERTIFIERS PTY LTP | APPROX, CUTIFILL QUANTITIES BASED ON SURVEY COMPLETED AUGUST 2018 &
@ ‘wogusiythnin wis tuinenstiondn tlereninonaincrdonte: FA 7 Avocet Pde, Peregian Beach Date: Rev: Issue: Scale: Title: Date &
1gDesigna’s draings and reocmnendatons shal ake precedence aver rhiachralcranings. The q . : =
uri ote olfedinmedably sould enero, dezepecis orcokibexne pent endpret = AS 07.11.2018 1 Warking Drawings for BA, 1: 150 Site Plan 07.11.2018 o
GARLAND poowedng ithe wor, a 2
besten ‘Copyright: he desig cone stow on is canngremains the propery of Gatland Desh andicproidedony [am | S
1D Jasmin Chandler | 0408 866 692 € ‘for he use described, This drawing may not be copied, altered, have sections omitted, eravad or changed in eny o Mike and Jan Bolton Des JC Project # Drawing #: Issue: g
© [email protected] BEd sn hotte vite el Sed Di, iS Check:JC 18.128 WD.1.01 1 =
Page 15
a
—
PHASE LEGEND
DEMOLISH EXISTING FENCE
Existing
GARDEN BED TO BE DEMOLISHED — — Demolished
PAVERS & STEPS TO BE DEMOLISHED New Construction
~ LOW ROCK WALL TO BE DEMOLISHED L LEGEND.
A
EXISTING SCREENS TO BE DEMOLISHED g x > rXY YY) : Mark Description
LOS Vv SANK ~~ Qo) BA Balustrading - 1.2m min
EXISTING DRIVEWAY: EXISTING GARAGE SS Ze S Ss YS X in Frameless Glass (Pool Safe)
’ 4 ~\
REMOVE EXISTING LAWN ALN Y NOX »~ A“ “ BBQ Barbeque - Weber Built In
TO NATURE STRIP & REPLACE OA x Wy. XX” SS SM BS Bin Storage Area
~
ALL STONE PAVERS ON SITE RR YY eo SSN F1.5 1.5m High Hardwood
TO BE DEMOLISHED. SA x » Horizontal Decking Enclosure
1 N\EX7 ‘ F1.8 4.8m High Timber Paling
Fence to match existing
F2.0 2m High Hardwood Horizontal
Decking Fence
CONCRETE BLOCK WALL FB2.0 anit 190 Concrete Block
aaiieetientientiatien| | na FW Floor Waste
POOL EQUIPMENT TO BE RELOCATED.<” GBP Gas Bottle Position
STEPS TO BE DEMOLISHE! LB Letterbox
Yr
DECK TO BE DEMOLISHED ve oo (Relocation TBC)
| ‘ool Equipment
SEATING TO BE DEMOLISHED ON POT Large Feature Pot
RBL Rendered 190 Concrete Block
2 SHR Outdoor Shower
= SK Stainless Steel Sink
o TAP Garden Tap
= TL1 900x900 Slip Resistant Tile -
2 Grey Flow
= 7 TL2 900x900 Slip Resistant Tile -
ans Silver Flow
- TL3 Mosaic Tile - Silver Flow
TS Timber Seating
WM Water Meter
WT Water Tank
EXISTING RESIDENCE 4
—~
ee PERMIT FOR BUILDING WORKS
APRROVED WITH CONDITIONS
Permit No. 8140 Date 11 FEB 2019
isis an approved document. Refer othe Decision
Note for deals and conditons applying tothe work
| ~ ~ DEMOLISH & REPLACE EXISTING STONE PATHS ISSUED BY URBAN CERTIFIERS PTY LTD
| EXISTING POOL TO BE DEMOLISHED —> & STEPS TO UNDERSTOREY OF HOUSE
\ K— EXISTING FRONT FENCE TO BE DEMOLISHED
| ELECTRICITY PROPERTY POLE & METERBOX *NOTE: ALL EXISTING TREES, PALMS & PLANTS
TO BE RELOCATED AS SHOWN REFER SITE PLAN (NOT SHOWN) TO BE REMOVED* EXISTING
BORE
wal
7 DEMOLISH EXISTING FENCE
+ ARFOARS ~ =
°
@ Fompeatnd a orn id 7 Avocet Pde, Peregian Beach JM Date: Rev: Issue Scale Title Date 5
he Bling Des ravngs nxn shale pedis oe chica ang. Tha 2 . i
aera bbonetinnedaeh oven eno, depres rertnone gpantaprrb Fey 07.11.2018 1 Working Drawings for BA fy 1: 100 Demolition Plan 07.11.2018 &
GARLAND gut be wos E 4 s
pesien ‘Copyright The design content shown on tis caning remains the property of Garland Desig andis provided only z cS &
0 Jasmin chatidlet | 408 866 692 ‘forthe use decribed, This draning may notbe coped, dered, have cecon omled, erased or changed in any Mike and Jan Bolton 2 wa Des JC Project # Drawing #: Issue g
I Lgerienddestgn@gmalcom eyo ep wit prel GatardD Es By check:JC 18.128 WD.1.02 1 =
Page 16
17367
a. = = Z _
2 fs Sipe Lage Sipke Lae Bye Suk Lae Be a Taam | PHASE LEGEND
aNw 7 < K . & Existing
Ze = “= 2 * - - ° Y Demolished
lew Construction
11000 by J Niew Const
| PORTION OF NEW 1.8m HARDWOOD PALING FENCE (POOL SAFE)) / | 4
NEW PORTION OF DRIVEWAY PROVIDE HOT WATER TO SINK ont tata uk) LEGEND.
|. . CONCRETE To MATCH EXISTING i Mark Description
| 1001000 10010001001000100 BA Balustrading - 1.2m min
EXISTING DvewAy EXISTING GARAGE | \ Frameless Glass (Pool Safe)
~’ | TLIO ALL ENTRANCE STEPPERS al x - BBQ Barbeque - Weber Built In
t—t~ MATCHING GROUTED-IN PEBBLES THE GATEHOUSE MUST BE SETBACK 6m FROM g wu BS Bin Storage Area
|. SURROUND STEPPERS p | || THE ROAD BOUNDARY UNLESS APPROVAL |S 3| | 3 caf F1.5 1.5m High Hardwood
| suas fe OBTAINED FROM THE NOOSA COUNCIL. zZ L | 2 AAS col SI Horizontal Decking Enclosure
= oH Ss $ — F18 1.8m High Timber Paling
rim 8] 8 8 PROPOSED
ur EVEN FALLTO MATCH DRIVEWAY | &8 EHOUSE ., | EXISTING FIELD GULLY TO BE © 0.2. 2 | < a PATIO AREA [) [e80 J Fence to match existing
Wg! bet) Tis iTERCOMSIR RELOCATED AS SHOWN "~~ 2 3 CL F2.0 2m High Hardwood Horizontal
“ 2 = Decking Fence
> Rye eet, ab | ™ al [g RL 14.29 m EXISTING mg
8 y z 2 mM DECK FB2.0 2m High 190 Concrete Block
s we rz ee re z | | Wall
m2 FW Floor Waste
RL 14.12 m /|| GBP Gas Bottle Position
LB Letterbox
Ze 5 FEATURE TREE (SHOWN DASHED) ~ MB Meterbox (Relocation TBC)
es fo MATURE EVERGREEN FRANGIPAN! PE Pool Equipment
BS a wa Cy ON up|
ie Ez PROPOSED SPA| W029) L POT Large Feature Pot
es \ [THE SWINIMING POOL BARRIER MUST COMPLY WITH a RBL _ Rendered 190 Concrete Block
eo WETEDGE SPA DN w [THE FENCING STANDARDS PRESCRIBED IN QDC MP3.4 @ SHR Outdoor Shower
3 5
és g [A RESUSCITATION SIGN MUST BE ATTACHED TO THE b sk Stainless Steel Sink
58 & __ Jl [Poot FENCE OR DISPLAYED NEAR THE POOL, SO 2
Se POOL DEPTH @ Biff) [THAT ITs VISABLE TO A PERSON NEAR THE POOL, z= TAP Garden Tap
Be Ze 2 i -
gS ‘200 (mn X— PROVIDE DRAINAGE HOLE 9) [DIRECT ACCESS FROM THE DWELLING INTO THE POOL ENCLOSURE is Tu eos00 Sip Resistant Tile
es Ee &WASTETOFEATUREPOT fy =| |IS PROHIBITED. ACCESS FROM A PATIO IS ONLY PERMITTED IF y
= - O BM THAT PATIO IS PERMANENTLY OPEN ON AT LEAST 1 SIDE (not fitted TL2 900x900 Slip Resistant Tile -
Se e | LH WIM with blinds or screens). ANY WINDOWS OPENING ONTO THE POOL Silver Flow
a> g © x) [ENCLOSURE MUST BE PROTECTED AS REQUIRED BY AS1926.1-2007. +
hres EP 58 TL3 Mosaic Tile - Silver Flow
2S Se MITRE TILE EDGES TO 2a
22 SS reo STAIR NOSINGS. 5 ws TS Timber Seating
baked Bs ratrajn iy WM Water Meter
lew uum i bo 28
2 NEW LAWN & = PROPOSED POOL DN PROPOSED LAWN 28 EXISTING RESIDENCE WT Water Tank
= RL 13.48 m us
ez &
S 300 300 300 5000
5 pe
5 5400 “900 5000
8
: roo AR
& { ea €-— PROVIDE DRAINAGE HOLE
3 POOL DEPTH \ OS a Waste To FEATURE PoT
5S 200
= Oo
8 2 te LINK EDGE ALUMINIUM GARDEN Vv wo
Ee 2. RL 14.12m EDGING WHERE REQUIRED A
2 a3 DETERMINE ON SITE EXISTING BORE,
z 5 - |
33 7 POOLEQUIPMENT! = . “TO BE REPAIRED
B, ie why cena nor Neuen
~~ Be Bei | __ BELOW HOUSE >
g BE > wal hs she, 07, SB, i, > 2.8% 0
q 1 2 STEPPED 190 CONCRETE BLOCK BOUNDARY WALL MAX HEIGHT: 2600 |*"® : 20000 PORTION OF NEW'1.8m HARDWOOD PALING FENCE. me =
@ Tebllynyesdurg evecmossorcdepeicaowecucricarg fy” AVOCetPde, Peregian Beach FW Date Rey sue Scale ous ot 2
SARLAND abet nn elias Se stb apt re sh STE PROVER TIT CONRITIONS: By 12100 Ground Level Landscape Plard7.11.2018
pasion cepa Te aon ° 0. 5 3 2
= eee | pamino sto oe tires | Bl bes: sc project #: orawingtsissue: 8
Sia Usicuieiseuaicon mpnoatpi tered cap Mike and Jan Bolton z eseamysone Sy nasser El checkvc 18.128 wots 1 =
ISSUED BY URBAN CERTIFIERS PTY LTD
Page 17
@
GARLAND
0 Jasmin Chandler | 0408 866 692
[email protected]
FF
EXISTING HOUSE ABOVE
EXISTING
STORAGE
Ow
CONCRETE PATH
#EXISTING HOUSE ABOVE
a
EXISTING STAIRS
<
S
M'1’C.,
uP
CONCRETE SLAB
RL 11.59 m
rod RL12.4m
Pe
Jo Sh
RETAINING WALL.
7
BARK & LOW MAINTENANCE GROUNDCOVERS:
(SHOWN DIAGONAL HATCH)
NZ NYT \
CITRUS TREES
EXISTING BORE,
POOL EQUIPMENT / 2/10 BE REPAIRED
ypCONCRETE UTILITY AREA’ RN “7 (NOT INCLUDED IN
PATH BELOW HOUSE fe SS i, BUILDER'S Score)
ee atta; shila, alia, ahlig, shia, ie 78, 08, B4, BG
3 = = z yy
7 Avocet Pde, Peregian Beach Date: Rev: Issue
ngreains te property of Gand Dein andi prided on
id led hava ekens ote eresadrchargedin ey
Mike and Jan Bolton
o7,
018 = 1 Working Drawings for BA
oC
eee
PHASE LEGEND
——— Biisting
— _ — Demolished
New Construction
LEGEND.
Mark Description
BA Balustrading - 1.2m min
Frameless Glass (Pool Safe)
BBQ Barbeque - Weber Built In
BS Bin Storage Area
F15 1.5m High Hardwood
Horizontal Decking Enclosure
F1.8 1.8m High Timber Paling
Fence to match existing
F2.0 2m High Hardwood Horizontal
Decking Fence
FB2.0 — 2mHigh 190 Concrete Block
Wall
FW Floor Waste
GBP Gas Bottle Position
LB Letterbox
MB Meterbox (Relocation TBC)
PE Pool Equipment
POT Large Feature Pot
RBL Rendered 190 Concrete Block
SHR Outdoor Shower
SK Stainless Steel Sink
TAP Garden Tap
TL1 900x900 Slip Resistant Tile -
Grey Flow
TL2 900x900 Slip Resistant Tile -
Silver Flow
TL3 Mosaic Tile - Silver Flow
Timber Seating
Water Meter
Water Tank
522
DEVELOPMENT PERMIT FOR BUILDING WORKS
APPROVED WITH CONDITIONS
Permit No. 8140 Date 11 FEB 2019
Thisis an approved document. Refer to the Decision
Notice for details and conaitons applying tothe work.
ISSUED BY URBAN CERTIFIERS PTY LTD
Scale Title Date
1: 100 Understorey Landscape Plan 07.11.2018
Des: JC Project #
Check:JC 18.128
Drawing #: Issue
WD.1.04 1
711112018 10:15:23 PM
Page 18
Jou
du — —= 2 Sh
| = TL) 675
1 ) OPTIONAL LIGHTS IN BEAM ABOVE STAIR LIGHTING TO WASH LIGHT
\ ' CONFIRM REQUIREMENT WITH CLIENTS ACROSS TREAD
\ I
EXISTING DRIVEWAY EXISTING GARAGE |
| ==
N = Ou oo ey,
\ i 7
. | / \
\ a, | a / !
y Bhi 168 ! me
\ a) 3 frat
; él ' ie / REFER UNDERSTOREY
, § ||, PRoPosED i 5 I LIGHTING PLAN
Ih, i | i \ patio area! & !
a ———— , &y we /
vo sl lis = 8¢ / EXISTING
/ --- \ BL es / DECK
/ aT 2 \ a /
! y \ \ h /
| f Jot L
\ |
|
/
{ PROPOSED SPA ~ 7
|
\ !
\ \
\ ! STAIR LIGHTING TO WASH LIGHT
i | ACROSS TREAD
; i
; \
ws LEGEND
I NOTE: THIS BUILDING PERMIT DOES NOT APPROVE ANY WORKS ON THE.
! | NATURE STRIP (INCLUDING LANDSCAPING & GARDEN LIGHTS). THE BUILDER 1O WEATHERPROOF DOWNLIGHT
i \ | WILL NEED TO LIAISE DIRECTLY WITH NOOSA COUNCIL FOR THESE WORKS. PU WATERPROOF POOL LIGHT
| !
\ | | | *Ou WEATHERPROOF GARDEN UPLIGHT
\
\ ; PROPOSED POOL | \ PROPOSED LAWN EXISTING RESIDENCE Dsl WEATHERPROOF WALL SURFACE MOUNTED LIGHT
1 \ \ 300 (FITTING HEIGHT ABOVE FLOOR LEVEL)
\ \ \
\ \ &8@ GPO DOUBLE WEATHERPROOF (FITTING HEIGHT)
\ ' ‘ \
| \
\ \ i \ NOTES
\ \ \ \ 1. ALL LIGHTSWITCHES AT 1200 TO BOTTOM
{ ad \ OF COVERPLATE
1 \ 2, ENERGY EFFICIENT LIGHTING TO
} \ COMPLY WITH RELEVANT CODES &
| f REGULATIONS
“6 \ DEVELOPMENT PERMIT FOR BUILDING WORKS, 3. COMBINE ALL SWITCH/POWER PLATES
\ STAIR LIGHTING TO WASH LIGHT APPROVED WITH CONDITIONS NCU ON POSSIBLE
\ ACROSS TREAD
| f Femit No. 8140 Date 11 FEB 2019 4, ENSURE LIGHTING LAYOUT MAINTAINS.
i ' Nasr tear anons apping se on SYMMETRIES & ALIGNMENTS AS INDICATED
os ELECTRICIAN & BUILDER MUST CONFER WITH OWNER'S TO ENSURE ISSUED BY URBAN CERTIFIERS PTY LTD 5. CONFIRM EXTERNAL GPO'S WITH OWNER
f
For engetnglinomalon, gees dang endian shel ake precedence ves achtecha ces,
The BildngDesnes craving and reormendatons salt proceence cr acetal aings The
uberis bbe rofed medal, stolen era, dzepnces oot brome apart andro
prooeedng wih be vos.
Copy The dein cantntshon cn his caning rena he prope of GarendDasgn ndispridedrly
‘erbeuse decibed Tis anng manele cere, led have scons orto eraedor changed ery
ayia pr wien ep of ater Das,
GARLAND
0 Jasmin Chandler | 0408 866 692
[email protected]
Ss
2
a
oy
iS
ag CORRECT POSITION, SELECTION & QUANTITY OF ALL ELECTRICAL FITTINGS
7 Avocet Pde, Peregian Beach
Mike and Jan Bolton
Date: Rev: Issue Scale
07.11.2018 1 Working Drawings for BA ry 1: 100
E
By Des: JC
Ry Check: JC
6. PROVIDE SUFFICIENT POWER TO UTILITY
AREA FOR POOL EQUIPMENT / POOL
CLEANER / PUMPS ETC.
Title Date
Ground Level Lighting Plan 07.11.2018
Project #
18.128
Drawing #: Issue
WD.1.05 1
711112018 10:15:24 PM
Page 19
The BuldngDesnes ravings ere GARLAND prooeedng wih be vos. 0 Jasmin Chandler | 0408 866 692 [email protected] ey wit he pr wien nna of ater Dain, For engetnglinomalon, gees dang endian shel ake precedence ves achtecha ces, mendtons hl eke prececnoe ver achicha ranings. The uberis bbe rofed medal, stolen era, dzepnces oot brome apart andro Copy The dein cantntshon cn his caning rena he prope of GarendDasgn ndispridedrly ‘erbeuse decibed Tis anng manele cere, led have scons orto eraedor changed ery REFER GROUND LEVEL LIGHTING PLAN / 4 Joy u ow Aa (2 ‘= hb EXISTING “3 — STORAGE cE 2 =< Fr EXISTING RESIDENCE ELECTRICIAN & BUILDER MUST CONFER WITH OWNER'S TO ENSURE CORRECT POSITION, SELECTION & QUANTITY OF ALL ELECTRICAL FITTINGS Ss 2 a oy iS 7 Avocet Pde, Peregian Beach Mike and Jan Bolton Date: Rev: Issue 07.11.2018 1 Warking Drawings for BA, By fa} 2 ey Scale 1: 100 Des Jc Check:JC DEVELOPMENT PERMIT FOR BUILDING WORKS APPROVED WITH CONDITIONS Permit No, 8140 Date 11 FEB 2019 This is an approved document. Refer tothe Decision Natioe fr details and conditons applying tothe work ISSUED BY URBAN CERTIFIERS PTY LTD LEGEND 10 WEATHERPROOF DOWNLIGHT PL WATERPROOF POOL LIGHT <Ou — WEATHERPROOF GARDEN UPLIGHT DsM WEATHERPROOF WALL SURFACE MOUNTED LIGHT 300 (FITTING HEIGHT ABOVE FLOOR LEVEL) $ 8@ GPO DOUBLE WEATHERPROOF (FITTING HEIGHT) NOTES 1. ALL LIGHTSWITCHES AT 1200 TO BOTTOM OF COVERPLATE 2. ENERGY EFFICIENT LIGHTING TO COMPLY WITH RELEVANT CODES & REGULATIONS 3. COMBINE ALL SWITCH/POWER PLATES INTO THE SMALLEST POSSIBLE CONFIGURATION 4. ENSURE LIGHTING LAYOUT MAINTAINS SYMMETRIES & ALIGNMENTS AS INDICATED. 5, CONFIRM EXTERNAL GPO'S WITH OWNER 6. PROVIDE SUFFICIENT POWER TO UTILITY AREA FOR POOL EQUIPMENT / POOL CLEANER / PUMPS ETC. Title Date Understorey Lighting Plan 07.11.2018 Project #: Drawing #: Issue 18.128 WD.1.06 1 711112018 10:15:25 PM
Page 20
2150x200 HARDWOOD POSTS TO STRUCTURAL ENGINEER'S SPEC STAIN TO MATCH EXISTING TIMBER HARDWOOD ROOF BEAM TO STRUCTURAL ENGINEER'S SPECIFICATIONS STAIN TO MATCH EXISTING TIMBER \VERGOLA AUTOMATED ADJUSTABLE TIMBER-LOOK POWDERCOATED ALUMINIUM COLOUR: TO MATCH EXISTING TIMBER 4 | Patio Northern Elevation 2150x200 HARDWOOD POSTS TO STRUCTURAL ENGINEER'S SPECIFICATIONS STAIN TO MATCH EXISTING TIMBER FEATURE STONE CLADDING TO 190 CONCRETE BLOCK RETAINING WALL HARDWOOD SEATING TO BUILDER'S DETAIL STAIN TO MATCH EXISTING TIMBER B Patio Western Elevation 14340 & Set aa 7S AN | LOUVRE ROOF PROPOSED PATIO AREA: PROPOSED PATIO AREA. — mM i — Hern f Fi | WJ 3 Ground Level © 0.2) 150 2715 pee 150 2715 200 4990 + wt [— VERGOLA AUTOMATED ADJUSTABLE LOUVRE ROOF TIMBER-LOOK POWDERCOATED ALUMINIUM COLOUR: TO MATCH EXISTING TIMBER INNNNANNAANNANNANNANNAANAAANAAS ANS HARDWOOD ROOF BEAM TO STRUCTURAL ENGINEER'S SPECIFICATIONS STAIN TO MATCH EXISTING TIMBER FEATURE STONE CLADDING TO 190 CONCRETE BLOCK BBQ PLINTH PHASE LEGEND Existing — Demolished New Construction LEGEND. Mark Description BA Balustrading - 1.2m min Frameless Glass (Pool Safe) BBQ Barbeque - Weber Built In BS Bin Storage Area F1.5 1.5m High Hardwood Horizontal Decking Enclosure F418 1.8m High Timber Paling Fence to match existing F2.0 2m High Hardwood Horizontal Decking Fence FB2.0 2m High 190 Concrete Block Wall FW Floor Waste GBP Gas Bottle Position LB Letterbox MB Meterbox (Relocation TBC) PE Pool Equipment POT Large Feature Pot RBL Rendered 190 Concrete Block SHR Outdoor Shower SK Stainless Steel Sink TAP Garden Tap TL1 900x900 Slip Resistant Tile - Grey Flow TL2 900x900 Slip Resistant Tile - Silver Flow TL3 Mosaic Tile - Silver Flow TS Timber Seating WM Water Meter WT Water Tank HARDWOOD BENCHTOP WITH WATERFALL ENDS FOODGRADE STAIN TO MATCH EXISTING TIMBER DOORS & KICK: 2 PACK QUARTER TAPA z 32) GARDEN PROPOSED PATIO AREA Ow Zo aS ae os a — NZ tL I 8 7\AN — | | | [= = " Ground Level > F111 — : = MT 14340 ul WE Pat ul Tene ul i 7 7 Ir SL I=2 1 EET II | ee ee Wl i CONCRETE FOOTINGS, SLAB & SLAB WATERPROOF BOARD CABINETRY THICKENINGS REFER TO STRUCTURAL ENGINEER'S 1035 930 1035 SPECIFICATIONS 990 3000 1000 | Patio Section eS 7 For engin inomalon, gees dang endian shel ake precedence ves achtecha ceings, The BildngDesgnes craving and reormendatons shalt proceence cer acetal ans The uberis bbe rod edly, stolen era, dzepncs oot brome apart andor prooeedng wih be vos. Copy The dein cantntshon on is caning rena he prope of GarandDasg ndispidedrly ferbeuse decibed Tis anng myn be cere, ed have scons orto eraedor changed ery ayia pr wien ep of ater Desi, @ GARLAND 0 Jasmin Chandler | 0408 866 692 [email protected] 450 20 4990 7 Avocet Pde, Peregian Beach Mike and Jan Bolton Ss 2 a oy iS 1 Date: Rev o7t1.2018 Issue Working Drawings for BA By fa} 2 ey DEVELOPMENT PERMIT FOR BUILDING WORKS APPROVED WITH CONDITIONS Permit No. 8140 Date 11 FEB 2019 his isan approved dacument. Refer to the Decision Notice for details and conditions applying to the work ISSUED BY URBAN CERTIFIERS PTY LTD Scale Title 1:50 Elevs & Section Des: JC Project # Check:JC 18.128 Date 07.11.2018 Drawing #: Issue WD.2.01 1 711112018 10:15:26 PM
Page 21
1395 210 1000
100 1350 { 1 1055
PROPOSED
GATEHOUSE
2400 HIGH
GARDEN
2700
POLYCARBONATE ROOF SHEETING
TO MATCH EXISTING
FALL TO SIDE TO PROMOTE DRAINAGE
EXISTING RENDERED CONCRETE BLOCK WALL
PAINT TO MATCH EXISTING HOUSE
RESENE TRIPLE TAPA TO BE CONFIRMED ON SITE
100x100 HARDWOOD POSTS & ROOF BEAM
TO STRUCTURAL ENGINEER'S RO BEA KD
STAIN TO MATCH EXISTING TIMBER
3 PROPOSED SPA
‘SPA WATER LEVEL
113
DEVELOPMENT PERMIT FOR BUILDING WORKS
APPROVED WITH CONDITIONS
Permit No. 8140
‘an approved document, Refer tothe Decision
for details and conditions applying to the work
No
Date 11 FEB 2019
ISSUED BY URBAN CERTIFIERS PTY LTD
TL2-
PROPOSED POOL
12
900x900 TILE TO POOL SURROUND
900x450 COPING TILE TO POOL EDGE
LAMINATED MITRED EDGES
REINFORCED CONCRETE SLAB,
FOOTINGS & SLAB THICKENINGS
TO STRUCTURAL ENGINEER'S DETAIL
490 SERIES CONCRETE BLOCK ——¥{]
BOUNDARY WALL TO STRUCTURAL
ENGINEER'S DETAIL
RL 14.12 m
eL
aL
Ground Level
tt
POOL WATER LEVEL
POOL WATER LEVEL.|
14340
Pool Section 1
Ee Peet Section 1
= Neure y outa Knock: OUTS ARE
LEFT AT BASE OF POSTS IN PEBBLE
| FINSH FOR PLANTING OF VINES.)
LINK EDGE ALUMINIUM GARDEN
EDGING IF REQUIRED
DETERMINE ON SITE
TIMBER HARDWOOD DECKING
FRONT FENCE
LAID HORIZONTALLY
POOL SAFE TO BUILDER'S
DETAIL.
STAIN TO MATCH EXISTING
TIMBER
2000
WH
= i hi H
II
?|—
EXISTING POOL TO BE tre en= 11
APPROXIMATE LOCATION SHOWN
2700
~~~ REINFORCED CONCRETE SPA & POOL JE
yy
=| | — [= TO STRUCTURAL ENGINEER'S DETAIL!
tox)
PROPOSED SPA is
‘SPA WATER LEVEL
au
Pool Section 2
By Pee! Section 2
REINFORCED CONCRETE SPA & POOL
=e —
200x800 TILE TO POOL 5 sirrouNo —| i
| |" 1900x450 COPING TILE TO POOL EDGE | = |
LAMINATED MITRED EDGES |——| |
TO STRUCTURAL ENGINEER'S DETAIL
@
GARLAND
For engetnglinomalon, gees dang endian shel ake precedence ves achtecha ces,
The BildngDesnes craving and reormendatons salt proceence cr acetal aings The
uberis bbe rofed medal, stolen era, dzepnces oot brome apart andro
prooeedng wih be vos.
Copy The dein cantntshon cn his caning rena he prope of GarendDasgn ndispridedrly
7 Avocet Pde, Peregian Beach
Si Ta
MAX|2000mm ay)
Existing
— — Demolished
LEGEND.
Mark
BA
New Construction
Description
Balustrading - 1.2m min
Frameless Glass (Pool Safe)
2600 MAX ABOVE NEIGHBOURING NGL
0 Jasmin Chandler | 0408 866 692
[email protected]
{or ue daub. This raving may nob oid, ld, ai cons nite ersedor changin any
ey wit he pr wien nna of ater Dain,
Mike and Jan Bolton
Ss
2
a
oy
iS
900 PVT) | FE] J =} | | FE! BBQ —_ Barbeque - Weber Built In
RBL - RENDERED 190 CONCRETE BLOCK WALL es 5 ans Mgt Hardwood
TO STRUCTURAL ENGINEER'S DETAILS . Horizontal Decking Enclosure
PAINT TO MATCH EXISTING HOUSE WHERE VISIBLE -
RESENE TRIPLE TAPA TO BE CONFIRMED ON SITE F1.8 1.8m High Timber Paling
Fence to match existing
<— 1.2m MIN POOL SAFE FRAMELESS GLASS BALUSTRADE F292 High Hardwood Horizontal
TO CLIENT SELECTION Decking Fence
FLOOR FIXED BALUSTERS AS PER CLIENT REQUEST FB2.0 wa al 190 Concrete Block
Ground Level FW Floor Waste
> GBP Gas Bottle Position
14340 LB Letterbox
PROPOSED LAWN MB Meterbox (Relocation TBC)
PE Pool Equipment
__ POT Large Feature Pot
RBL Rendered 190 Concrete Block
jl jl IE SHR Outdoor Shower
REINFORCED CONCRETE STEPS x Gowen Sink
TO STRUCTURAL ENGINEER'S DETAIL
TL1 900x900 Slip Resistant Tile -
WHITE / LIGHT GREY PEBBLECRETE FINISH TO POOL & SPA INTERIOR Grey Flow
PEBBLECRETE TO MEET COPING TILE / MOSAIC TILE TL2 900x900 Slip Resistant Tie -
Silver Flow
TL3 Mosaic Tile - Silver Flow
Date: Rev: Issue Scale Tithe Timber Seating Date
07.11.2018 1 Working Drawings for BA m 1:50 S eld | on Water Meter 07.11.2018
cS WT Water Tank
me Des: JC Project #: Drawing #: Issue
By check:JC 18.128 WD.3.01 1
7/11/2018 10:15:28 PM
Page 22
spe : woojewS@usisepoueHEs! Lb LOVGM = BZL BL Or:yoeuD uoljog uer pue exIW eq ut ps vn. ayrognion 269 998 800 | seIpueUD UIASer enss| :‘#6uimesq :#39ef01d Of ‘seq : ‘ie upebiep opeztepegun snes ey Peep en ouleu Sumer su) peqasep en ay oj _ 3 ‘uopeponidsipue ubseg pure yo yodud ay suewauGue sy uo wnoys yuo sep ou wBukdog Relea Bleck eL0z"bt'Z0 sainpayos wavessfumeio ue + atoe'inu0 , adapter oat stomata ney eco bare a3e0 ants anss] :Aey :a3eg yoeag uelbaiad ‘apd }a00ay L ‘Suva janpamae re euepeoed oes wtew pe Sune s,eeubig vPMqu BuDaLEuE: &) Ne'woo'spiyewuins@uupe AD; PlpawWUys/afuel-eplyne Woo’ spipeuwysy/:sdyy 11 Ald SGN YSWALYS GBUINDSY SV} AVIN MO14 SATIS TSALS SSIINIVLS SIE USTWSONOO ON MSWAIMS - 31H QI YAWAIMS STIL We 8Z:SL:0L @LOZ/L Ld. FILL ANVLSISSY dS TWNYSLXS 0Sb X 006 WOS/ €9$ HSW WAINSTIIN Ne'woo'sa|Ieqwe®suopkyoooew 40 Ne‘woo'auojssde@qeuueveW VISONV TILL ANVLSISSY dS TWNYSLXS 09P X 006 WAOSOYVE YNNVISWA ANVISISSY dlTS SSI USeNVv WDS// €8$ USATIS HO YAddOO 998¥IN STIL INOLS 30v ASSHS 008 MOTI Y3ATIS NIV1S04Od (ZONVY TIVSUSLYM) S3T1L CSISILOSY NVITVLI MOTE BAIS ATL GOH VdS - EL STIL LNVLSISTY dS THNYSLXA 0S% X 006 SHILL LWW DYV] WOS/ €9$ HSV WNINSTIIN YOS STAVLINS STIV4 NSA SNL NIVINIVN OL BYIS Ne'woo'sa|yaque@aiopAysooews 40 ne" wioo'auoyseoe@ qeuUve eu CNNOYD NO 8¥7S 313YONOO GSOYO-NISY Y3A0 div WONV STIL LNVLSISSY dS THNYSLXS OS X 006 WAOSOMVE YNNVIYYN, ANVISISSY dl1S SSL USENW WDS / €8$ Y3ATIS YO YAddOO 998¥IN SITIL® SNOLS 3OW 01 006 * 006 MO1SY3ATIS NIV130YOd (GONVY TIVSUSLYM) S31 CSISILOSY NVIT¥LI MOT BSATIS ATL VANV 100d - él STIL LNVLSISTY dS THNYSLXA 0S% X 006 SHILL LWW DNV] WOS/ €9$ HSV WNINSTIIN YOS FTAVLINS STIV4 NSA SNL NIVINIVN OL BY IS Ne’ [email protected] 0 ne" woo'auoysaoe@ qe uve EU CNNOYD NO 81S S1SYONOO GSOYO-NISY 3A div] WONY STIL LNVLSISSY dS TWNYSLXS OS X 006 WAOSOMVE YNNYIYYN, ANVISISSY dl1S SITLL USeNV WOS / €8$ U3ATIS YO YAddOO 998¥IN SHIL® ANOLS JW OL * 006 * 006 MOT4 ATED NIW1304Od (JONVY TIVSUSLYM) STL C3IsLLOSY NVITWLI MOTS ASUO ATL VANV YOOALNO - LL Ne'woo'ssjwunjooo®suyo [-4oge|e9ywio}-2646u) pem-3u0)s-jesnyey'sjonpo.djne” woo soopynooge mawy/: sy SVNO1ANILSISHO YOOGLNO O03 OIANLS SNOLS ¥ FLL W109 div WOGNYY SNOLSAN8 ONIGOY1D SNOLS CIV] WOGNVY SNOLS3M8 HOLVIN 1S38 ONIGAV1D ANOLS SITLL OVISOW/ F1L ONIGOD OL do SLSYOSTESSd NNY AaaO/ SLHM, SLSY0F1883d NOILVOISIDAdS SHITTING 100d OL UVIINIS HO SLSHOS1883d VdS / 100d - 3L5YOS18dSd S|mog-ainjea|-lajemyabed-jonpoidjne woo uBisapejeiouooused' many/:sdy NOIS3G S1SHONOO NILS¥O | —e0nes-Gutyabue.-epyuew/doysjne woo vepreBKuoojeqayy mamy/sdiy WOOUYHO SULSHONOO 10d SUNLW34 USONVS ONIATS S$LOd AdIS100d - LOd SYNLVAS ne‘woo'uBisapajasouoouyseo MySay NOISSG SLSYONOO NI SVD ‘hlfsjod-sunjeaydoysjne woo uapieBfuooreqauy mawy-sdy WOOUVHO SLFYONOD 10d FUNLW34 JUV Lr CYVALYNOD - LOd SYNLVS4 11 Ald SU3IdLN39 NVEUN AB GaNssI pom ayy Buh Uois90q 644 0 e}ex} qUeLUnD9p panosdde Ut 6102 dad bb ed OPL8 ‘ON Hue SNOILIGNOD HLIM G3A0udd¥ USVI L3NIGVO UVTINIS YO INN1T009 S3HONSE LSYOO HLYON NMOHS S¥ CuvO8 4OOUSYSLYM dV UBLUWNO- NOW 2 SHYOM ONITING Hos LINYSd LNAWdOTIAIO XYLANIEVO WNYSLX3 AAILLYNYSL TV YalTIddNs | (ww) SNOISNAWIG HSINIS ‘TWIYSLVN WLI |3ON3Y43435u FINGSHOS SNOILOA1SS
Page 23
DEVELOPMENT PERMIT FOR BUILDING WORKS
APPROVED WITH CONDITIONS
Permit No. 8140 Date 11 FEB 2019
This is an approved document. Refer tothe Decision
Notice for details and conditions applying tothe work.
ISSUED BY URBAN CERTIFIERS PTY LTD
@ Keegan on dara sade ier 7 Avocet Pde, Peregian Beach Date: Rev: Issue: Scale Title Date:
‘The Balding Dasgne’s cranings and recommendations shal ake prcedenoe over architectural rawngs. The i
ahr tobretteciodly hull an ena, dezopnci or uel boone prt epi a 20.09.2018 1 Design Development Plans. Perspectives 30.09.2018
GARLAND
prong ewok,
Copyright The cence stawnn this avrg anaes opty GafenDesin end is provided
fertheusecesrbed Tis tain my rolbe coped eed hare econ ont ered er chron ary
way witout por wien apo of GatendDesn
0/2018 3:09:08 PM
Des: JC Project #: Drawing #: Issue:
Check:- 18.128 DD.4.01 1
0 Jasmin Chandler | 0408 866 692
© [email protected]
Mike and Jan Bolton
Page 24
Department of Housing and Public Works
Form 15 Compliance certificate
for building design or
specification Version 4 July 2017
NOTE: This is to be used for the purposes of section 10 of the Building Act 1975 and/or section 46 of the
Building Regulation 2006.
RESTRICTION: A building certifier (class B) can only give a compliance certificate about whether building work
complies with the BCA or a provision of the Queensland Development Code (QDC). A building certifier (Class B)
can not give a certificate regarding QDC boundary clearance and site cover provisions.
1. Property description Street address (include no., street, suburb/locality and postcode)
This section need only be
completed if details of street
address and property description Postcode:
are applicable.
E.g. in the case of Lot and plan details (attach list if necessary)
(standard/generic) pool design/shell
manufacture and/or patio and
carport systems this section may In which local government area is the land situated?
not be applicable.
The description must identify all
land the subject of the application.
The lot and plan details (e.g.
SP/RP) are shown on title
documents or a rates notice.
If the plan is not registered by title,
provide previous lot and plan
details.
2. Description of
component/s certified
Clearly describe the extent of work
covered by this certificate, e.g. all
structural aspects of the steel roof
beams.
3. Basis of certification
Detail the basis for giving the
certificate and the extent to which
tests, specifications, rules,
standards, codes of practice and other
publications, were relied upon.
4. Reference documentation
Clearly identify any relevant
documentation, e.g. numbered
structural engineering plans.
LOCAL GOVERNMENT USE ONLY
Date received Reference Number/s
Page 25
5. Building certifier reference Building certifier reference number
number
6. Competent person details Name (in full)
A competent person for building work,
means a person who is assessed by JASON LINDSAY
the building certifier for the work as Company name (if applicable) Contact person
competent to practice in an aspect of
the building and specification design, LINDSAY CONSULTING P/L JASON LINDSAY
of the building work because of the
Phone no. (business hours) Mobile no. Fax no.
qualifications in the aspect. The 0754792118 0754510118
competent person must also be
registered or licensed under a law Email address
applying in the State to practice the [email protected]
aspect.
If no relevant law requires the
Postal address
individual to be licensed or registered UNIT 2C/82 PARKER STREET
to be able to give the help, the certifier
must assess the individual as having MAROOCHYDORE Postcode: 4558
appropriate experience, qualifications
or skills to be able to give the help. Licence or registration number (if applicable)
If the chief executive issues any RPEQ 4928
guidelines for assessing a competent
person, the building certifier must use
the guidelines when assessing the
person.
7. Signature of competent Signature Date
person 31/01/2019
This certificate must be signed by the
individual assessed by the building
certifier as competent.
The Building Act 1975 is administered by the Department of Housing and Public Works
Page 26
ACN 079 744 808 ABN 61 478 386 385 GST REGISTERED
AS TRUSTEE FOR THE LINDSAY FAMILY TRUST
SITE CLASSIFICATION REPORT
JOB NUMBER 181811
CLIENT MIKE BOLTON
SITE LOCATION 7 AVOCET PARADE, PEREGIAN BEACH
REPORT DATE JANUARY 2019
1. INTRODUCTION
The purpose of this report is to classify the subject allotment in accordance with Australian
Standard 2870-2011 'Residential Slabs and Footings. From this classification a footing
system has been recommended for the structure so as to allow adequate performance of the
footings under the soil conditions determined at the site.
This report relates exclusively to the proposed extension to the existing residence at
subject allotment, as detailed on the architectural drawings supplied by the client. This
document has been prepared for the express purpose stated above. This document does
not cover any other elements related to construction on the site.
2. SITE DESCRIPTION
The subject allotment is a residential lot fronting a sealed road, there is an existing
residence on the site and the proposed extension is located towards the front. The proposed
site has a light coverage of grass, with scattered undergrowth and scattered trees present.
The site falls towards the rear of the block at an approximate slope of 5%.
3. SOIL PROFILE
The borelogs carried out at the site, refer attached Site Plan for localities, indicate that the
soil profile consists of silty sand overlying sand.
Whilst every effort has been made to ensure that the borelogs carried out at the subject
allotment are indicative of the soil profile over the site any discrepancy between the profile
detailed in the borelogs and that observed during construction shall be referred to the
Consulting engineer for immediate attention.
4. MATERIALS LABORATORY TEST RESULTS
Determination of the classification for the site in this situation is based upon test results
from Dynamic Cone Penetrometer testing performed over the site and shrink/swell test
results.
Off. 2C/82 Parker St, Maroochydore 4558
OFFICE: (07) 54 792 118 MOBILE: 0412 313 645 FAX: (07) 54 510 118
E-MAIL: [email protected]
Page 27
5. SITE CLASSIFICATION AND TARGET STRATA
Based on the findings of the site investigation and the footing system design proposed on
the client supplied information, the classification of the site is considered to conform to: -
CLASS " P "
This classification is due to poor bearing capacity of the existing soil.
However, if this was not the case the soil type and reactivity would
be comparable to that of a CLASS " S ".
in accordance with Australian Standard 2870-2011, 'Residential Slabs and Footings,
Construction'.
The target stratum where 100kpa of allowable bearing capacity is attained by the medium
dense SAND which occurs at a depth of 1100mm from the existing ground level at
location BH1 and at a depth of 1400mm at location BH2. Any fill placed over the
existing ground shall be piered through the fill into the existing material. Further note that
6. FOOTING SYSTEM DESIGN
The footing system shall be designed to conform to the performance limits stated in AS
2870 2011 and reprinted in the C.S.I.R.O.'s Publication 10/91, 'Guide to Home Owners
on Foundation Maintenance and Footing Performance', a copy of which attached to this
report. It should be noted that footings designed in accordance with AS2870-2011 does
not guarantee no movement of footings, shrinkage cracking or other damage to the
building.
Foundation preparation and footing construction shall be in accordance AS 2870 -2011
and AS 3798-1990 'Guidelines on Earthworks for Commercial and Residential
Developments'.
Where necessary, subsoil drainage shall be incorporated in the construction of the building
to ensure that subsurface water is properly drained away from the footings.
Potential seepage or subsoil drainage problems cannot always be recognised from the
results of a site investigation. Problems with respect to subsurface water flow or seepage
may not be evident until after the site has been subject to the first significant wet period.
After construction of the footing system the ground surface around the residence shall be
sloped away from the footings at a fall of 1 in 20 minimum for a distance of 2000 mm.
7. ARTICULATION
It is recommended that masonry walls on Class M, H, E and P sites be articulated at all or
some openings. Articulation joints shall be constructed in accordance with the Cement and
Concrete Association's Publication 'TN61 - Articulated Walling'.
Page 28
8. SERVICES
Expansive or collapsing soils require special considerations at service connections to
ensure flexibility to prevent damage or breakage. In areas where known expansive or
collapsing soils are present flexible connections and impervious plugs shall be provided to
all services including all drainage, stormwater and septic system.
On and Behalf of
LINDSAY CONSULTING PTY LTD
Jason Lindsay
RPEQ 4928
Page 29
LIMITATIONS Recommendations given in this report are based on the information supplied by the client regarding the proposed building construction in conjunction with the findings of the investigation. Any change in construction type, building location or omission in the client supplied information, may require additional testing and/or make the recommendations invalid. The recommendations herein identify a target soil stratum into which the footings are to be founded. The target stratum has been located by the depth in mm of the target stratum's upper horizon boundary below the existing ground surface level at the time of the site investigation. Any cutting or filling works and any surface erosion or deposits subsequent to the site investigation, will alter the measured location of the stratum relative to the surface. Where required, the author should be notified in such cases to confirm the location of the target stratum. The description of the soil given in the Soil Profile section of this report is intended as a brief overview of the soil's primary constituents. For a detailed classification of the soil, the reader should refer to the Soil Profile Reports and/or Borehole Reports attached to this report. Every reasonable effort has been made to locate the test sites so that the borehole profiles are representative of the soil conditions within the area investigated. The client should be made aware however, that exploration is limited by time available and economic restraints. In some cases soil conditions can change dramatically over short distances, therefore, even careful exploration programs may not locate all the variations. If soil conditions different from those shown in this report are encountered or are inferred from other sources, then the author must be notified immediately. This report may not be reproduced except in full. The information and drawings provided with this report shall only be used and will only be applicable for the development shown on the client supplied information provided for this site. Any dimensions, contours, slope directions and magnitudes shown on the Test Locality Plan shall not be used for any building construction or costing calculations. The purpose of the plan is to show approximate location of field tests only. Any changes made to these recommendations by persons unauthorised by the author will legally be interpreted as that person assuming the responsibility for the long-term performance of the footing system. The recommendations contained in this report have not taken into consideration the long term effects of any previous, current or potential subsurface work by mining companies or potential slope instability problems. At the time of writing this report neither our client (nor his agent) nor the local authority had made the author aware that these problems may be affecting this allotment. If a mining subsidence or slope stability assessment is required for this allotment, the recommendations of a suitably qualified geotechnical engineer should be sought.
Page 30
Foundation Maintenance and Footing Performance: A Homeowner’s Guide Gy) CSIRO BIF 18 replaces Information Sheet 10/91 Buildings can and often do move. This movement can be up, down, lateral or rotational. The fundamental cause of movement in buildings can usually be related to one or more problems in the foundation soil. It is important for the homeowner to identi the soil type in order to ascertain the measures that should be put in place in order to ensure that problems in the foundation soil can be prevented, thus protecting against building movement. This Building Technology File is designed to identify causes of soil-related building movement, and to suggest methods of prevention of resultant cracking in buildings. Soil Types ‘The types of soils usually present under the topsoil in land zoned for residential buildings can be split into two approximate groups — granular and clay. Quite often, foundation soil is a mixture of both types. The general problems associated with soils having granular content are usually caused by erosion. Clay soils are subject to saturation and swell/shrink problems. Classifications for a given area can generally be obtained by application to the local authority, but these are sometimes unreliable and if there is doubt, a geotechnical report should be commissioned As most buildings suffering movement problems are founded on clay soils, there is an emphasis on classification of soils according to the amount of sweil and shrinkage they experience with variations of water content. The table below is Table 2.1 from AS 2870, the Residential Slab and Footing Code. Causes of Movement Settlement due to construction There are two types of settlement that occur as a result of construction: * Immediate settlement occurs when a building is first placed on its foundation soil, as a result of compaction of the soil under the weight of the structure. The cohesive quality of clay soil mitigates against this, but granular (particularly sandy) soil is susceptible. * Consolidation settlement is a feature of clay soil and may take place because of the expulsion of moisture from the soil or because of the soil’s lack of resistance to local compressive or shear stresses. This will usually take place during the first few months after construction, but has been known to take many years in exceptional cases. These problems are the province of the builder and should be taken into consideration as part of the preparation of the site for construc- tion. Building Technology File 19 (BTF 19) deals with these problems. Erosion All soils are prone to erosion, but sandy soil is particularly susceptible to being washed away. Even clay with a sand component of say 10% or more can suffer from erosion. Saturation This is particularly a problem in clay soils. Saturation creates a bog- like suspension of the soil that causes it to lose virtually all of its bearing capacity. To a lesser degree, sand is affected by saturation because saturated sand may undergo a reduction in volume — particularly imported sand fill fee bedding and blinding layers. However, this usually occurs as immediate settlement and should normally be the province of the builder. Seasonal swelling and shrinkage of soil All clays react to the presence of water by slowly absorbing it, making the soil increase in volume (see table below). The degree of increase varies considerably between different clays, as does the degree of decrease during the subsequent drying out caused by fair weather periods. Because of the low absorption and expulsion rate, this phenomenon will not usually be noticeable unless there are prolonged rainy or dry periods, usually of weeks or months, depending on the land and soil characteristics. The swelling of soil creates an upward force on the footings of the building, and shrinkage creates subsidence that takes away the support needed by the footing to retain equilibrium. Shear failure This phenomenon occurs when the foundation soil does not have sufficient strength to support the weight of the footing. There are two major post-construction causes: + Significant load increase. * Reduction of lateral support of the soil under the footing due to erosion or excavation. * In clay soil, shear failure can be caused by saturation of the soil adjacent to or under the footing. GENERAL DEFINITIONS OF SITE CLASSES Class Foundation A Most sand and rock sites with little or no ground movement from moisture changes s Slightly reactive clay sites with only slight ground movement from moisture changes M Moderately reactive clay or silt sites, which can experience moderate ground movement from moisture changes H Highly reactive clay sites, which can experience high ground movement from moisture changes E Extremely reactive sites, which can experience extreme ground movement from moisture changes AtoP Filled sites P Sites which include soft soils, such as soft clay or silt or loose sands; landslip; mine subsidence; collapsing soils; soils subject to erosion; reactive sites subject to abnormal moisture conditions or sites which cannot be classified otherwise
Page 31
Tree root growth Trees and shrubs that are allowed to grow in the vicinity of footings can cause foundation soil movement in two ways: * Roots that grow under footings may increase in cross-sectional size, exerting upward pressure on footings. + Roots in the vicinity of footings will absorb much of the moisture in the foundation soil, causing shrinkage or subsidence. Unevenness of Movement The types of ground movement described above usually occur unevenly throughout the building’s foundation soil. Settlement due to construction tends to be uneven because of: * Differing compaction of foundation soil prior to construction. * Differing moisture content of foundation soil prior to construction. Movement due to non-construction causes is usually more uneven still. Erosion can undermine a footing that traverses the flow or can create the conditions for shear failure by eroding soil adjacent to a footing that runs in the same direction as the flow. Saturation of clay foundation soil may occur where subfloor walls create a dam that makes water pond. It can also occur wherever there is a source of water near footings in clay soil. This leads to a severe reduction in the strength of the soil which may create local shear failure. Seasonal swelling and shrinkage of clay soil affects the perimeter of the building first, then gradually spreads to the interior. The swelling process will usually begin at the uphill extreme of the building, or on the weather side where the land is flat. Swelling gradually reaches the interior soil as absorption continues. Shrinkage usually begins where the sun's heat is greatest. Effects of Uneven Soil Movement on Structures Erosion and saturation Erosion removes the support from under footings, tending to create subsidence of the part of the structure under which it occurs. Brickwork walls will resist the stress created by this removal of support by bridging the gap or cantilevering until the bricks or the mortar bedding fail. Older masonry has little resistance. Evidence of failure varies according to circumstances and symptoms may include: * Step cracking in the mortar beds in the body of the wall or above/below openings such as doors or windows. * Vertical cracking in the bricks (usually but not necessarily in line with the vertical beds or perpends). Isolated piers affected by erosion or saturation of foundations will eventually lose contact with the bearers they support and may tilt or fall over. The floors that have lost this support will become bouncy, sometimes rattling ornaments etc. Seasonal swelling/shrinkage in clay Swelling foundation soil due to rainy periods first lifts the most exposed extremities of the footing system, then the remainder of the perimeter footings while gradually permeating inside the building footprint to lift internal footings. This swelling first tends to create a dish effect, because the external footings are pushed higher than the internal ones. ‘The first noticeable symptom may be that the floor appears slightly dished. This is often accompanied by some doors binding on the floor or the door head, together with some cracking of cornice mitres. In buildings with timber flooring supported by bearers and joists, the floor can be bouncy. Rael there may be visible dishing of the hip or ridge lines. As the moisture absorption process completes its journey to the innermost areas of the building, the internal footings will rise. If the spread of moisture is roughly even, it may be that the symptoms will temporarily disappear, but it is more likely that swelling will be uneven, creating a difference rather than a disappearance in symptoms. In buildings with timber flooring supported by bearers and joists, the isolated piers will rise more easily than the strip footings or piers under walls, creating noticeable doming of flooring. age and damage iW wW eR LL Wall cracking due to uneven footing settlement As the weather pattern changes and the soil begins to dry out, the external footings will be first affected, beginning with the locations where the sun's effect is strongest. This has the effect of lowering the external footings. The doming is accentuated and cracking reduces or disappears where it occurred because of dishing, but other cracks open up. The roof lines may become convex Doming and dishing are also affected by weather in other ways. In areas where warm, wet summers and cooler dry winters prevail, water migration tends to be toward the interior and doming will be accentuated, whereas where summers are dry and winters are cold and wet, migration tends to be toward the exterior and the underlying propensity is toward dishing. Movement caused by tree roots In general, growing roots will exert an upward pressure on footings, whereas soil subject to drying because of tree or shrub roots will tend to remove support from under footings by inducing shrinkage. Complications caused by the structure itself Most forces that the soil causes to be exerted on structures are vertical — i.e. either up or down. However, hecause these forces are seldom spread evenly around the footings, and because the building resists uneven movement because of its rigidity, forces are exerted from one part of the building to another. The net result of all these forces is usually rotational. ‘This resultant force often complicates the diagnosis because the visible symptoms do not simply reflect the original cause. A common symptom is binding of doors on the vertical member of the frame. Effects on full masonry structures Brickwork will resist cracking where it can. It will attempt to span areas that lose support because of subsided foundations or raised points. Iv is therefore usual to see cracking at weak points, such as openings for windows or doors. In the event of construction settlement, cracking will usually remain unchanged after the process of settlement has ceased. With local shear or erosion, cracking will usually continue to develop until the original cause has been remedied, or until the subsidence has completely neutralised the affected portion of footing and the structure has stabilised on other footings that remain effective In the case of swell/shrink effects, the brickwork will in some cases return to its original position after completion of a cycle, however it is more likely that the rotational effect will not be exactly reversed, and it is also usual that brickwork will settle in its new position and will resist the forces trying to return ir to its original position. This means that in a case where swelling takes place after construction and cracking occurs, the cracking is likely to at least partly remain after the shrink segment of the cycle is complete. Thus, each time the cycle is repeated, the likelihood is that the cracking will become wider until the sections of brickwork become virtually independent. With repeated cycles, once the cracking is established, if there is no other complication, it is normal for the incidence of cracking to stabilise, as the building has the articulation it needs to cope with the problem. This is by no means always the case, however, and monitoring of cracks in walls and floors should always be treated seaously: Upheaval caused by growth of tree roots under footings is not a simple vertical shear stress. There is a tendency for the root to also exert lareral forces that attempt to separate sections of brickwork after initial cracking has occurred.
Page 32
The normal structural arrangement is that the inner leaf of brick- work in the external walls and at least some of the internal walls (depending on the roof type) comprise the load-bearing structure on which any upper floors, ceilings and the roof are supported. In these cases, it is internally visible cracking that should be the main focus of attention, however there are a few examples of dwellings whose external leaf of masonry plays some supporting role, so this should be checked if there is any doubt. In any case, externally visible cracking is important as a guide to stresses on the structure generally, and it should also be remembered that the external walls must be capable of supporting themselves. Effects on framed structures Timber or steel framed buildings are less likely to exhibit cracking due to swell/shrink than masonry buildings because of their flexibility. Also, the doming/dishing effects tend to be lower because of the lighter weight of walls. The main risks to framed buildings are encountered because of the isolated pier footings used under walls. Where erosion or saturation cause a footing to fall away, this can double the span which a wall must bridge. This additional stress can create cracking in wall linings, particularly where there is a weak point in the structure caused by a door or window opening. It is, however, unlikely that framed structures will be so stressed as to suffer serious damage without first exhibiting some or all of the above symptoms for a considerable period. The same warning period should apply in the case of upheaval. It should be noted, however, that where framed buildings are supported by strip footings there is only one leaf of brickwork and therefore the externally visible walls are the supporting structure for the building. In this case, the subfloor masonry walls can be expected to behave as full brickwork walls. Effects on brick veneer structures Because the load-bearing structure of a brick veneer building is the frame that makes up the interior leaf of the external walls plus perhaps the internal walls, depending on the type of roof, the building can be expected to behave as a framed structure, except that che dxtersial ussoniey- ll Befeave ii a’ siinilar Way, eo sé Grvernal lea? of a full masonry structure. Water Service and D: Where a water service pipe, a sewer or stormwater drainage pipe is in the vicinity of a building, a water leak can cause erosion, swelling or saturation of susceptible soil. Even a minuscule leak can be enough to saturate a clay foundation. A leaking tap near a building can have the same effect. In addition, trenches containing pipes can become watercourses even though backfilled, particularly where broken rubble is used as fill. Water that runs along these trenches can be responsible for serious erosion, interstrata seepage into subfloor areas and saturation. Pipe leakage and trench water flows also encourage tree and shrub roots to the source of water, complicating and exacerbating the problem. Poor roof plumbing can result in large volumes of rainwater being concentrated in a small area of soil: Incorrect falls in roof guttering may result in overflows, as may gutters blocked with leaves etc. * Corroded guttering or downpipes can spill water to ground. * Downpipes not positively connected to a proper stormwater collection system will direct a concentration of water to soil that is directly adjacent to footings, sometimes causing large-scale problems such as crosion, saturation and migration of water under the building. Seriousness of Cracl In general, most cracking found in masonry walls is a cosmetic nuisance only and can be kept in repair or even ignored. The table below is a reproduction of Table C1 of AS 2870. AS 2870 also publishes figures relating to cracking in concrete floors, however because wall cracking will usually reach the critical point significantly earlier than cracking in slabs, this table is not reproduced here. | _Prevention/Cure Plumbing Where building movement is caused by water service, roof plumbing, sewer or stormwater failure, the remedy is to repair the problem. It is prudent, however, to consider also rerouting pipes away from the building where possible, and relocating taps to positions where any leakage will not direct water to the building vicinity. Even where gully traps are present, there is sometimes sufficient spill to create erosion or saturation, particularly in modern installations using smaller diameter PVC fixtures. Indeed, some gully traps are not situated directly under the taps that are installed to charge them, with the result that water from the tap may enter the backfilled trench that houses the sewer piping. If the trench has been poorly backfilled, the water will either pond or flow along the bottom of the trench. As these trenches usually run alongside the footings and can be at a similar depth, it is not hard to see how any water that is thus directed into a trench can easily affect the foundation's ability to support footings or even gain entry to the subfloor area. Ground drainage In all soils there is the capacity for water to travel on the surface and below it. Surface water flows can be established by inspection during and after heavy or prolonged rain. If necessary, a grated drain system connected to the stormwater collection system is usually an easy solution. Ic is, however, sometimes necessary when attempting to prevent water migration that testing be carried out to establish watertable height and subsoil water flows. This subject is referred to in BTF 19 and may properly be regarded as an area for an expert consultant. Protection of the building perimeter It is essential to remember that the soil that affects footings extends well beyond the actual building line, Watering of garden plants, shrubs and trees causes some of the most serious water problems. For this reason, particularly where problems exist or are likely to ‘occur, it is recommended that an apron of paving be installed around as much of the building perimeter as necessary. This paving CLASSIFICATION OF DAMAGE WITH REFERENCE TO WALLS Description of typical damage and required repair Approximate crack width Damage limit (see Note 3) category Hairline cracks <0.1 mm 0 Fine Geacks whichido oe need tepaie etn 1 Cracks noticeable but easily filled. Doors and windows stick slightly <5 mm 2 Cracks can be repaired and possibly a small amount of wall will need 5-15 mm (or a number of cracks 3 to be replaced. Doors and windows stick. Service pipes can fracture. 3 mm or more in one group) Weathertightness often impaired Extensive repair work involving breaking-out and replacing sections of walls, 15-25 mm but also depend 4 especially over doors and windows. Window and door frames distort. Walls lean on number of cracks or bulge noticeably, some loss of bearing in beams. Service pipes disrupted
Page 33
Shrubs
rs Clump of trees;
fener height selected
enmneo for distance
a from house
rain teste
BAW Re mero
ied uid cin acta ea IS
f { tn ap
TTT
io
WILL
Drained
Carport pathway
Path—
on ons
2 pen mulch
fp amen ae
ium
Sea
should extend outwards a minimum of 900 mm (more in highly
reactive soil) and should have a minimum fall away from the
building of 1:60. The finished paving should be no less than 100
mm below brick vent bases.
Ic is prudent to relocate drainage pipes away from this paving, if
possible, to avoid complications from future leakage. If this is not
practical, earthenware pipes should be replaced by PVC and
backfilling should be of the same soil type as the surrounding soil
and compacsedto'thettame density.
Except in areas where freezing of water is an issue, it is wise to
remove taps in the building area and relocate them well away from
the building — preferably not uphill from it (see BTF 19).
Ir may be desirable to install a grated drain at the outside edge of the
paving on the uphill side of the building. If subsoil drainage is
needed this can be installed under the surface drain.
Condensation
In buildings with a subfloor void such as where bearers and joists
support flooring, insufficient ventilation creates ideal conditions for
condensation, particularly where there is little clearance between the
floor and the ground. Condensation adds to the moisture already
present in the subfloor and significantly slows the process of drying
out. Installation of an adequate subfloor ventilation system, either
natural or mechanical, is desirable.
Warning: Although this Building Technology File deals with
cracking in buildings, it should be said that subfloor moisture can
result in the development of other problems, notably:
* Water that is transmitted into masonry, metal or timber building
elements causes damage and/or decay to those elements.
High subfloor humidity and moisture content create an ideal
environment for various pests, including termites and spiders.
+ Where high moisture levels are transmitted to the flooring and
walls, an increase in the dust mite count can ensue within the
living areas. Dust mites, as well as dampness in general, can be a
health hazard to inhabitants, particularly those who are
abnormally susceptible to respiratory ailments.
The garden
The ideal vegetation layout is to have lawn or plants that require
only light watering immediately adjacent to the drainage or paving
edge, then more demanding plants, shrubs and trees spread out in
that order.
Overwatering due to misuse of automatic watering systems is a
common cause of saturation and water migration under footings. If
it is necessary to use these systems, it is important to remove garden
beds to a completely safe distance from buildings.
Fxisting trees
Where a tree is causing a problem of soil drying or there is the
existence or threat of upheaval of footings, if the offending roots are
subsidiary and their removal will not significantly damage the tree,
they should be severed and a concrete or metal barrier placed
vertically in, the soil to, preyeut fucure root growth in the direction of
the building. If it is not possible to remove the relevant roots
without damage to the tree, an application to remove the tree should
be made to the local authority. A prudent plan is to transplant likely
offenders before they become a problem.
Information on trees, plants and shrubs
State departments overseeing agriculture can give information
regarding root patterns, volume of water needed and safe distance
from buildings of most species. Botanic gardens are also sources of
information, For information on plant roots and drains, see Building
Technology File 17.
Excavation
Excavation around footings must be properly engineered. Soil
supporting footings can only be safely excavated at an angle that
allows the soil under the footing to remain stable. This angle is
called the angle of repose (or friction) and varies significantly
between soil types and conditions. Removal of soil within the angle
of repose will cause subsidence.
| Remediation
eee
Where erosion has occurred that has washed away soil adjacent to
footings, soil of the same classification should be introduced and
compacted to the same density. Where footings have been
undermined, augmentation or other specialist work may be required.
Remediation of footings and foundations is generally the realm of a
specialist consultant.
Where isolated footings rise and fall because of swell/shrink effect,
the homeowner may be tempted to alleviate floor bounce by filling
the gap that has appeared between the bearer and the pier with
blocking. The danger here is that when the next swell segment of the
cycle occurs, the extra blocking will push the floor up into an
accentuated dome and may also cause local shear failure in the soil.
If it is necessary to use blocking, it should be by a pair of fine
wedges and monitoring should be carried out fortnightly.
This BTF was prepared by John Lewer FAIB, MIAMA, Partner,
Construction Diagnosis.
The information in this and other issues in the series was derived from various sources and was believed to be correct when published.
The information is advisory. It is provided in good faith and not claimed to be an exhaustive treatment of the relevant subject.
Further professional advice needs to be obtained before taking any action based on the information provided.
Distributed by
CSIRO PUBLISHING PO Box 1139, Collingwood 3066, Australia
Freecall 1800 645 051
Tel (03) 9662 7666
Fax (03) 9662 7555 www.publish.csiro.au
Email: [email protected]
© CSIRO 2003. Unauthorised copying of this Building Technology file is prohibited
Page 34
SITE PHOTOGRAPHS
Photo 1
Photo 2
[OCR of page images]
SITE PHOTOGRAPHS
Page 35
Lindsay Consulting Pty Ltd
Off. 2C/82 Parker street, Maroochydore
7 AVOCET PARADE,
CLIENT MIKE BOLTON SITE LOCATION REFERENCE 181811
PEREGIAN BEACH
BORELOG 1 BORELOG 2 PENETROMETERS
Depth Depth
below below
Group Group
ground Soil Description ground Soil Description PN1 PN2 PN3 PN4 PN5
Symbol Symbol
level level
(mm) (mm)
0 SM Silty SAND, fine grained, grey brown, 0 SM Silty SAND, fine grained, grey brown,
low plasticity fines, dry, loose low plasticity fines, dry, loose
100 100 1 1 1 1
200 200 1 2 1 2
300 300 2 2 1 1
400 SP SAND, fine grained, grey, moist, loose 400 3 1 2 2
500 500 SP SAND, fine grained, grey, moist, loose 2 2 1 1
600 600 1 1 2 2
700 700 2 1 2 2
800 800 2 1 2 2
900 900 2 1 2 2
1000 1000 2 1 3 2
1100 SP SAND, fine grained, grey, moist, medium 1100 2 2 2 3
dense
1200 1200 3 2 2 4
1300 1300 4 2 3 3
SAND, fine grained, grey, moist, medium
1400 1400 SP 3 3 3 4
dense
1500 1500 4 3 3 3
Hole Terminated Hole Terminated
COMMENTS
AUTHORISED SIGNATORY
Page 36
LINDSAY CONSULTING PTY
LTD
[OCR of page images]
M
P
N
Pp
LINDSAY CONSULTING (7,
CLIENT AND PROJECT DESCRIPTION SCALES
IKE BOLTON
ROPOSED RENOVATIONS
REVISION LIST.
0.7 AVOCET PARADE
EREGIAN BEACH SURVEY DATUM
qvjt Engineers)
LTA area 4928
aFF. 2782 PaRKERgrReeT, MAROgAYooRE PH 54 792% | DRAWING TITLE
THIS DRAWING REMAINSA HE PROPERTY OF
LINDSAY CONSULTING PTY LTD AND IS FOR
THE SOLE USE OF THE CLIENT. NO PART
MAY BE USED IN PART OR WHOLE WITHOUT
PRIOR EXPRESS WRITTEN CONSENT OF
LINDSAY CONSULTING PTY LTD
ASSOCIATED CONSULTANTS
SITE PLAN
A [ORIGINAL ISSUE 29/01/19
[computer File
181811SP.0WG
DRAWING NUMBER SHEET] REV.
18-1811-S1 1]A
L
EXISTING
RESIDENCE
PN1
EXISTING GARAGE oa
DRIVEWAY
CONCRETE BLOCK WALL
AVOCET PARADE
DEVELOPMENT PERMIT FOR BUILDING WORKS
APPROVED WITH CONDITIONS
Permit No. 8140 Date 11 FEB 2019
This is an approved document. Refer to the Decision
Notice for details and conditions applying to the work,
ISSUED BY URBAN CERTIFIERS PTY LTD
PN3
PN2
BH2
Page 37
LINDSAY CONSULTING PTY
LTD
[OCR of page images]
FOUNDATION & STRUCTURAL PLANS
Permit No. 8140
DEVELOPMENT PERMIT FOR BUILDING WORKS
APPROVED WITH CONDITIONS
Date 11 FEB 2019
his is an approved document.
Notice for details and conditions appying to th
ISSUED BY URBAN CERTIFIERS PTY LTD
SITE CLASSIFICATION - P
PATIO,POOL & BLOCK WALL
EXISTING SITE CONDITIONS Y|N
TREES PRESENT ee
FILL PRESENT id
SITE CONTOURS PROVIDED oe
AS-CONST SERVICES PROVIDED oe
SOIL CLASSIFICATION AS PER LINDSAY CONSULTING P/L
REPORT 181811.
FOUNDATION REQUIREMENTS FOR MODERATELY, HIGHLY & EXTREMELY REACTIVE SITES.
For stiffened rafts, waffle rafts and strip footings on moderately, highly and extremely reactive sites, the following requirements
apply to the building services and footing system in addition to requirements of clause 6.4 & 65:
A. Penetrations of the edge beam and footing by drain pipes shall be sleeved using closed cell polyethylene lagging or similar.
B. During construction, water run-off shall be collected and chanelled away from the building.
C. Excavations near the edge of the footing system shall e backfilled in such a way as to prevent access of water to the
foundations as described in clause 5.6.3b.
Notes.
1, For example, excavations should be backfilled above or adjacent to the footing with moist clay compacted by hand rodding
or tamping.
2. Porous material such as sand, gravel or building rubble should not be used
D. Water shall not be allowed to pond in the trenches.
E. Concrete in beams shall be mechanically vibrated.
AS2870-2011 Appendix B2.3
(A) Drainage o the site: The site should be graded or drained so that water cannot pond against or near the building. The ground
immediately adjacent to the building should be graded to a uniform Fall of S0mm min away from building over the first metre, The
sub-floor space for buildings with suspended floors should be graded or drained to prevent ponding where this may affect the
performance of the footing system. The site drainage recommendations should be maintained for the economic life of the building.
(B} Limitations on gardens: The development of the gardens should not interfere with the drainage requirements or the sub floor
ventilation and weephole drainage systems. Garden beds adjacent to the building should be avoided. Care should be taken to avoid
overwatering of gardens close to the buildings footings.
(C) Restrictions on trees and shrubs: Planting of trees should be avoided bear the foundation of the building or neighbouring building
on reactive sites as the can cause damage due to the drying of the clay at substantial distances. To reduce, but not eliminate, the
the possibility of damage, tree planting should be restricted to a distance from the house as follows.
(i) 1 and a half times the mature height for class E sites.
(ii) 1 times the mature height for class H1 and H2 sites.
(ii) 0.75 times the mature height for class M sites.
Where rows or groups of trees are involved, the distance from the building should be increased. Removal of trees from the site can
also cause similar problems. Alternatively, root barrier shall be installed as per manufacturers specifications.
BUILDERS NOTES
1
These drawings shall be read in conjunction with the architectural & any other consultant drawings.
Any variations/descrepancies shall be referred immediately to the engineer.
The builder shall verify all set-out dimensions and levels prior to construction.
The builder shall be responsible for the maintainance of safe working conditions.
All workmanship and materials shall be in accordance with the relevant standards and the BLA.
Subterranean termite protection shall be in accodance with AS3660-Part and the BCA.
Nonstructural items such as damp proof coursing, flashing and weep holes are not shown for clarity.
Refer to the architectural details as required.
CONSTRUCTION NOTES
1. All workmanship and materials shall be in accordance with the requirements of the relevant current
Australian Standard Codes, Building By-Laws and the ordinances of the relevant Local Authority.
= Minimum 20 MPa at 28 days
~ 20 nominal maximum aggregate size
= 100 maximum slump +/-10mm
2. il Concrete Class
Slab on ground
ii) Concrete Class
Suspended slab
Minimum 32 MPa at 26 days for internal slabs
Minimum 40 MPa at 28 days for external slabs
= 20 nominal maximum aggregate size
= 100 maximum slump +/-10mm
3. Minimum Cover
fo Reinforcement
25 to upper face of internal slabs -0 +5mm
45 for external exposure
30 fo a membrane in contact with the ground
40 to unprotected ground
4. Minimum Laps and Splices for Reinforcement
{a} Slab Fabric ~ 225 nininum overlap of transverse bars at all edges
{b} Trench Mesh 500 splices in all footing beams
Laps at intersections as per the Design Drawings
500 splices in all footing beams
Provide “L” bars at all beam intersections with 500 laps to each leg
{c)_ Reinforcing Bars
5. Fireplaces shall be supported on slab thickening extending 300 past the edges of the masonry, and
reinforced with SL72 mesh top and bottom. Slab thickening shall be 150 thick for single storey construction
and 200 thick for two storey construction
Shrinkage Control
6. Reinforcing mesh shall be no less than SL82 for slabs over 18m no steps) in length.
7. Where the floor slab is to be tiled, the following recommendations are made, in order to
minimise the effect of shrinkage:
~ SL92 slab mesh (or equivalent) should be provided
~ Placement of files should be delayed for as long as possible (preferably for at least 3 months}
EARTHWORKS NOTES:
Where any filling is carried out on the site after the completion of the site investigation, the
following recommendation shall be followed:-
8. The site shall be stripped of all vegetation prior to the placement of any filling material
9. Compaction Standards for filling Material
A. Controlled Filling
(a) Sand filling up to 600 deep, placed in maxinum 300 thick layers and compacted with a vibrating
roller to achieve a minimum Dynamic Cone Penetrameter reading of 7 blows per 300 penetration
Irefer AS 1289.F3.3). Sand fill may be flooded if necessary to achieve this compaction standard,
provided the water can subsequently be drained from the site.
(b)Non-sand filling up to 400 deep, placed in maximum 150 thick layers and compacted with
mechanical roller. Clay fill shall be moist during compaction.
(a1 Controlled filling shall continue for at least 1 metre past the edge of the footing beam and shall
be battered back to the original surface with a slope of no more than 12 (Vert : Horl.
(d) Where the depth of filling material exceeds that specified above, the filling material shall be
compacted as follows:
Sand fill to 65% Density Index in accordance with AS1289.E6.1
Non-sand fill fo 95% Maximum Dry Density (Standard Compaction) in accordance with 5.4.1
Compaction tests shall be carried out on each layer as the filling is placed. If the compaction standard
specified is not achieved, then @ “Pier and Slab" and “Pier and Beam” footing design shall be adopted with
all piers founded on the underlying natural material.
B. Rolled Filling
(a) Sand Filling up to 600 deep, placed in maximum 300 thick layers and conpacted by repeated
rolling with an excavator.
(b) Non-sand filing up to 300 deep, placed in maximum 150 thick layers and compacted by repeated
rolling with an excavator.
{1 Where the depth of filling material exceeds that specified above, the filling material shall be
compacted as fallows:-
Sand fill to 65% Density Index in accordance with AS1289.66.1
Non-sand fill to 95% Maximum Dry Density (Standard Compaction) in accordance with 5.4.1
Compaction tests shall be carried out on each layer as the filling is placed. IF the compaction standard
spetified is not achieved, then a “Pier and Slab" and “Pier and Beam” footing design shall be adopted with
all piers founded on the natural underlying material.
LINDSAY CONSULTING £7;
THIS DRAWING REMAINS/THE PROPERTY OF
LINDSAY CONSULTING PTY LTD AND IS FOR
THE SOLE USE OF THE CLIENT. NO PART
MAY BE USED IN PART OR WHOLE WITHOUT
PRIOR EXPRESS WRITTEN CONSENT OF
LINDSAY CONSULTING PTY LTD
CLIENT AND PROJECT DESCRIPTION
MIKE BOLTON
PROPOSED PATIO & POOL
NO.7 AVOCET PARADE
PEREGIAN BEACH
DRAWING TITLE
COVER PAGE
SCALES
SURVEY DATUM
ASSOCIATED CONSULTANTS
REVESION LST
‘A [ORFGNAL ISSUE BAT
snFO.DWG
aS HORE SHEET RE,
18-1811-F1 TIA
Page 38
LINDSAY CONSULTING PTY
LTD
1.2m DEEP
EXISTING RESIDENCE
2.2m DEEP
[OCR of page images]
viz 74-L181-81
vagy | 133Hs WAN ONIN G11 Ald SU31dIL439 NVEYN Ag G3Nss!
au anon Usage eu uauioop panrdde ue et
6102 834 Fb eed Ov18 ON Wed
SNOILIGNOD HLIM G3A0Udd¥ dork FWv9s
SMYOM ONIOTING YO LINYAd LNIWdOTSAIG NV 1 d J] S
21s
ool’. 31v3S s ae 1 Ze 1
Ty GNVS 44ILS
sa ae NV1d NOILVONNOS vento Ss
SUAid SLFYONOO SSVI
dQ WIN WWOD6 x OSe'vIG
SLNVLINSNO3 3LVID0SSV
WALVG AIAUNS
“Wo € € | 0
00), B10
NS
salv3s
NW1d NOILVONNOS
FILL ONIMVIC
HIVId NVIOINId
JaVeVd LIIGAV LON
100d % OllVd Gisddddd
NOL108 3yIW
NGILdldIS3G 139°0Xd ONY INAITD
L7 Ald SNILINSNOI AVSONIT
40 LN3SNGI NALLIYM SS3UdX3 YO
LMOHLIM 31HM YO LUvd NI G3SN 34 AVH
Luvd ON “1N3I19 3HL 40 3M 3710S 3HL
¥Od SI ONY G11 Ald SNILINSNOD AWSONIT
4G ALUadOUd IHIYSNIVHRY ONIMVEG SIL
GizeurBug Taps F 1esnsA7s)
DNILTASNOD AVSCNIT
SONAGISSY ONILSIXA
@)
®
lid
bad
bad
ose
350 Wz
330 Ww")
‘TWM 10078 313YONOO ONILSIXS
® ©
bad bad
us
us
Page 39
LINDSAY CONSULTING PTY
LTD
EXISTING RESIDENCE
[OCR of page images]
v
€
Hs
€4-LL8l-8b
SnooRNNR
uosoaq ay 0 2}9y Ueno penoidde Ue Si siyL
6102 d34 4) ed OPL8 “ON WWed
SNOILIGNOD HLIM G3A0udd¥
‘SHYOM ONIGTING NOS LINYAd LNSNdOTSAIG
GAIT SST WER
TST NOISARE
SLNVLINSNO3 3LVID0SSV
WALVG AIAUNS
$4 fi9
en
wy £ ¢ | 0
salw3s
NWid TWanlIndls
FILL ONIMVIC
HIVId NVIOINId
JaVeVd LIIGAV LON
100d % OllVd Gisddddd
NOL108 3yIW
NGILdldIS3G 139°0Xd ONY INAITD
L7 Ald SNILINSNOI AVSONIT
40 LN3SNGI NALLIYM SS3UdX3 YO
LMOHLIM 31HM YO LUvd NI G3SN 34 AVH
Luvd ON “1N3I19 3HL 40 3M 3710S 3HL
¥Od SI ONY G11 Ald SNILINSNOD AWSONIT
4G ALUadOUd IHIYSNIVHRY ONIMVEG SIL
GizeurBug Taps F 1esnsA7s)
DNILTASNOD AVSANIT
SONACISSY ONILSIXS
rancid
bd MH OSXSZ/z
‘O1e goxgiz.
NV 1d
OOK 31WIS
ONIWVd4 4004 OlLVd
Page 40
LINDSAY CONSULTING PTY
LTD
EXISTING GARAGE
[OCR of page images]
LINDSAY CONSULTING 173
LINDSAY CONSULTING PTY LTD AND IS FOR
THE SOLE USE OF THE CLIENT. NO PART
MAY BE USED IN PART OR WHOLE WITHOUT
PRIOR EXPRESS WRITTEN CONSENT OF
LINDSAY CONSULTING PTY LTD
CLIENT AND PROJECT DESCRIPTION
MIKE BOLTON
PROPOSED PATIO & POOL
NO.7 AVOCET PARADE
PEREGIAN BEACH
EXISTING GARAGE
DRAWING TITLE
THE GATEHOUSE MUST BE SETBACK STRUCTURAL PLAN
6m FROM THE ROAD BOUNDARY
UNLESS APPROVAL IS OBTAINED FROM
THE NOOSA COUNCIL.
SCALES
90x90 HWD F14
* 425x50 HWD 14 0 1 2m
———E—EEE
Orig. 1100
"po HWD F14 NO
KN uplift Capacity 125x50 HD 14 SURVEY DATUM
fixed with 1-M12 Bolt @ 500 CRS
EXISTING CONCRETE BLOCK WALL po
=
14 Cont. ASSOCIATED CONSULTANTS
POSTS SHALL BE BOLTED TO BLOCK
WALL WITH 2-M12 BOLTS ALL FIXINGS SHALL BE NOMINALLY IN ACCORDANCE WITH AS1684.2.
GATEHOUSE ROOF FRAMING PLAN
1:50
SCALE
REVBSION LST
A [ORGRAL ISSUE wave
DEVELOPMENT PERMIT FOR BUILDING WORKS
APPROVED WITH CONDITIONS
Permit No. 8140 Date 11 FEB 2019
A This is an approved document. Refer to the Decision
Notice for details and conditions applying to the work. mone FED WG
ISSUED BY URBAN CERTIFIERS PTY LTD aR aE
18-1811-F4 4A
Page 41
LINDSAY CONSULTING PTY
LTD
[OCR of page images]
v]s Gd-L81-8 aa
a is wom auy 0} Bi
ono tooaa
610¢ €34 1) eed
SNOILIGNOD HLIM G3A0uddV¥
SMYOM ONIGTING YO4 LINYAd LNSNdO13A30
SAME ASST NTU | VI 3709S OF JON
TSTHOBATE
SLNVLINSNO3 3LVID0SSV
WALVG AIAUNS
salv3s
S1¥140 NOILVGNNO4
FILL ONIMVIC
HIVId NVIOINId
JaVeVd LIIGAV LON
100d % OllVd Gisddddd
NOL108 3yIW
NGILdldIS3G 139°0Xd ONY INAITD
L7 Ald SNILINSNOI AVSONIT
40 LN3SNGI NALLIYM SS3UdX3 YO
LMOHLIM 31HM YO LUvd NI G3SN 34 AVH
Luvd ON “1N3I19 3HL 40 3M 3710S 3HL
¥Od SI ONY G11 Ald SNILINSNOD AWSONIT
4G ALUadOUd IHIYSNIVHRY ONIMVEG SIL
GizeurBug Taps F 1esnsA7s)
DNILTASNOD AVSCNIT
MLS - W130 TIVM TW3IdAL
DIP OSE
eB
Ss
=
poday 039 19/94, 5
GNVS 341LS WYNLYN
L-
810 wz @ susid aya:0u00 ssew —~|
; ose |
uwogy
+
—
"si3 007 ® SPH OLY YIM o
wo}jeq puo doy ZIN-€ 8
3
RA '
1s
NI
do) wwoas
b
$81jU8) WU 0009 Je
sjulof Joujuo3 payiis AlIng
ye 4JomM490]g, tL
4uaua2Jojujas }DM
64 “ulw ooy doy parvid
Ayppsyuaa 909 42 JOq 9,N ———_5
E
“XB\N WWUD09Z,
asunod doy ul 9{yN——I
GANIVLEO SI TIONNOD VSOON WOU TWAOYdd¥ SSFINN GNNOYD:
WYNLWN SAO8Y LHOISH Ni “40°C GS39X3 LON LSAW TIVM SHL ALON
31038 0} JON
bdd - W130 ONLOOJ OVd 1S0d HVONVYIA WIdAL
Nb
ww sy
NIW YH OOF
SN
JaiS T14-NON
4sod yppuBuan
9 dnauiys *ayob
yBnoiyy s4}oq UW/?—
NIW
00€
ONVS 44ILS TWYNLVN
dais V4
Page 42
LINDSAY CONSULTING PTY
LTD
[OCR of page images]
N16 bar in top course only — 4 LINDSAY CONSULTING
BACKFILL AND DRAINAGE
Be Gtructursl £ Civil Engineers)
1. Backfill should not be placed behind the wall until at least
ten days after grouting. THS DRAWING REMAINS/THE PROPERTY OF
2. Backfill should be placed and compacted in layers not more than LINDSAY CONSULTING PTY LTD AND IS FOR
200mm deep. The degree and method of compaction depends on MAG BE USED IN PART OR WHOLE WITHOUT
the proposed use of the backfill area PRIOR EXPRESS WRITTEN CONSENT DF
LINDSAY CONSULTING PTY LTD
3. The drainage system should be installed progressively as the
backfill rises CLIENT AND PROJECT DESCRIPTION
> 4. The drainage system behind the wall should be connected to the MIKE BOLTON
z
z ~ He Ni6 bars at 600 centres main drainage system. PROPOSED PATIO & POOL
ey = 5. When using soil backfill, it is advisable to seal off the top NO.7 AVOCET PARADE
ae 3 surface of the backfill with a semi-impermeable layer of soil PEREGIAN BEACH
gs ~ or earth. Compact and grade to a gutter to provide surface
Sa drainage.
ES
GZ DRAWING TITLE
ro
Zo FOUNDATION DETAILS
2 x
&3S =
nao €
az —
as s
as 3 SCALES
as 2.5 kPa Surcharge
25 eee ee ele eee
oo zs
2
= on
28 Longitudinal reinforcement
52 2/N12 at 400 except on top of
Zo . 7, cleanout blocks
HS 2 SURVEY DATUM
25 = + ee} — Granular backfill
= ht 2-N16 at 400 CRS with 55 cover
Lap bars MIN 600 ASSOCIATED CONSULTANTS
:
Pier - clean-ouf block + +100 Agg. drain with Granular backfill
\ Concrete
55 cover
55 cover lL i yet 25 MPa
h 250
= . . a
& S
~ N16 @ $00 CRS Each
et | N16 oF 300 each Woy Wo ath 55 over
300 N16 at 300
1200mm Min
| |_— Mass conerete piers @ 2m ors SE SSO
NATURAL STIFF_SAND_
e Refer Geo Report
=
s
38
DEVELOPMENT PERMIT FOR BUILDING WORKS
350 dio APPROVED WITH CONDITIONS
Permit No. 8140 Date 11 FEB 2019
This is an approved
FD.DWG
RETAINING WALL WITH BLOCKWALL DETAIL - ST2 A
NOT TO SCALE
ae WER EET] Re
18-1811-F6 6/A
Page 43
LINDSAY CONSULTING PTY
LTD
[OCR of page images]
NOTES
1. STRUCTURAL
a) Concrete
Fic = 25MPa at 28 days. 32MPa if within km of coastline
Concrete shall comply with AS2783.
Concreting shall be carried out in one continuous operation by pneumatic spraying process,
Shade concrete and keep moist for 7 days
Exposure Classification (AS2783) - B2
b) Reinforcement Fy = 250MPa. S12 bars throughout, lap 400 where required
- Bars shall be tied securely in position.
- Cover shall be 65mm to vertical reinforcement to the inside face
©) Foundations - Excavation shall follow contours of pool shape, Where over excavation occurs fill with concrete
- Foundation material shall be uniform over entire pool base, if not refer to Engineer
~ In clay or rocky ground use 75mm thick layer of 20mm nominal gravel under base
- Minimium safe bearing capacity - 100kPa
~ Pool walls shall be poured against undisturbed natural ground, if not refer fo Structural Engineer.
1
300 Total length 16700 MAX
@ Design
Design suitable for sites up to and including Class H (AS2870-2011)
If pool is located in fill or aboveground refer to Structural Engineer,
Drawing not to be used for pools in Exposure Classification £ (AS2783)
Walls have not been designed for cantilever walkways.
2. CONSTRUCTION
a) Construction shall comply with AS2783.
3. GENERAL
a) Ground water pressure shall be relieved by Hydrostatic valve as shown
b) Surface water shall be prevented from penetrating down beside pool wall by
grading surrounding areas away from the pool
c) Security fencing shall be as required by the Local Authority
d) Finishes to pool surface shall be as detailed by Pool Contractor
e) All hydraulic equipment (eg. pump, filter, hydrostatic relief valve, skimmer box etc.)
shall be as specified by the Pool Contractor
900 wide x 75 thick slab all round with F52
fabric CP or pavers with cement stabilized
filling sand. Refer Note 3{b).
300
Maximium surface area - 100m? Finish to Clients or
Contractors requirements NO
200] 50) Tew Water Level —————
~
3/St2
in bond beam = _ g
8 100
PS °
DIA 200 Anti vortex Unreinforced cutoff wall
REQUIRED FOR
$12-300 EW CP. Washed gravel to underside (CLASS H2 & E SITES)
of pool, refer Note ic)
300
y—Earth wire to reinforcement T Dia 40 suction line 300
Connect to dwelling earth system Hydrostatic relief valve oo to fitter
300 Varies e 0
Sump containing 3 = =
crushed rock we) [— o| 2
nominal size 50 mm S ™ y 8
= Water Level T 600 $0
NOTE =
a Where pool wall height (H) exceeds 3 B
= 1200 but less than 1500
provide intermediate vertical S12 bars -
as shown dotted LONGITUDINAL SECTION COPING VARIATION WET EDGE DETAIL
lie. $12 bars in this area at 150 c/c)
©
DEVELOPMENT PERMIT FOR BUILDING WORKS
APPROVED WITH CONDITIONS
Permit No. 8140 Date 11 FEB 2019 SECTION B-B
fo the Dec
his is an approved document.
Notice for details and conditions app a
ISSUED BY URBAN CERTIFIERS PTY LTD
300 Varies
SECTION A-A
LINDSAY CONSULTING £7,
THS DRAWING REMAINS/THE PROPERTY OF
LINDSAY CONSULTING PTY LTD AND IS FOR
THE SOLE USE OF THE CLIENT. NO PART
MAY BE USED IN PART OR WHOLE WITHOUT
PRIOR EXPRESS WRITTEN CONSENT OF
LINDSAY CONSULTING PTY LTD
CLIENT AND PROJECT DESCRIPTION
MIKE BOLTON
PROPOSED PATIO & POOL
NO.7 AVOCET PARADE
PEREGIAN BEACH
DRAWING TITLE
TYPICAL REINFORCEMENT
DETAILS
SCALES
SURVEY DATUM
ASSOCIATED CONSULTANTS
REVBSION LST
‘A [ORIGINAL ISSUE BA
seUnFD.DWG.
ae WER EET] Re
18-1811-F7 T\A
Page 44
LINDSAY CONSULTING PTY
LTD
[OCR of page images]
Filter and Spa
pumping unit
(optional)
=
Outlet to stormwater
drainage or sewer as
required by council
SCHEMATIC FOR WATER CIRC
All pipework shall be Dia 40 uPVC Class 9 and all fittings shall
POOL
be uPVC Class 18 all to AS1475- 1994 (R2014)
3 treads at 300
12-300 EW CP
STEP DETAILS
4 equal risers
ULATION | 300
Skimmer box
NS
Varies 150
1.200
500
150
$12-300 EW CP.
SPA DETAIL
Extra $12 1500 long
spaced 300 vertically
75 cover to inside face
PLAN
WALL CORNER
FOR RECTANGULAR POOLS
S12 - 300 EW CP
BENCH DETAIL
{__$12-300 EW CP
DETAIL
Si2-200EWoP =
Pool reinforcement
{I
1000
400
TYP
PLAN
SKIMMER BOX DETAIL
Profile of recess
to suit skimmer box.
Line of
excavation $12 - 200 EW CP
MIN 150 Ty Fest :
‘/~ Position outside horizontal A feinforcemen
reinforcing with 60 MIN cover
t fed fi
0 excavated face vn 150 z
PLAN —
SECTION C-C
SKIMMER BOX DETAIL
BOND BEAM CORNER DETAIL
FOR RECTANGULAR POOLS
‘THIS TABLE ONLY APPLIED
FOR POOL BASE/WALL TO
Oe een ABOVE GROUND CONCRETE POOL
INTO NATURAL MATER AL
VERTICAL REINFORCEMENT
‘THICKNESS (mm)
Height Above Maximum Overall Depth
Ground(m) {Coping to Inside bese face) a a i 728 ioe
os 12am S12@ 200 S12 @300 Si2@ 300 Si2@ 200EF S12 @300E"
os 12m $12@ 300 $12 @3C0 S12@ 300 Si2.@ 300EF S12 @300E*
10 12m $12@ 300 512 @ 300 S12 @ 300 S12@ 200EF S12 @300E*
12 135m $12.@ 150 $12 @ 300 $12@ 300 S12.@ 300EF S12@300E*
14 1.6m $12@ 130 512@ 10 S12 @ 150 $12@ 300EF S12 @300E*
16 185m $12 @ 100 312 @100 $12 @ 150 S12 @ 150EF $12 @150E*
12 195m S12 @100 S12 @ 100 Si2.@ 150EF S12 @150E*
20 2am Si2@ 10EF si2@1006"
ua 23m $12.@100€:
EF= EACH =ACE
HORIZONTAL REINFORCEMENT.
THICKNESS (mm)
Height Above Maximum Overall Depth
Ground(m) {Coping to Inside bese face) 150 us 200 235 350
06 12m $12 @ 300 H1Z@2WO| siz @ 225 si2@ s00EF S12 @300E*
08 12m $12 @ 300 $12 @ 250 $12 @ 225 $12 @ 300EF $12 @300E*
10 12m $12 @ 150 312 @ 140 S12 @ 100 S12 @ 1S0EF S12 @150E-
42 135m 512@ 150 512@140 S12 @ 100 Si2@ 150EF si2@150E*
14 1.6m $12 @ 150 312 @ 140 $12 @ 100 $12 @ 150EF $12 @150E*
16 185m S12@ 150 512@ 140 S12@ 100 S12@ 1SOEF S12 @150E°
1a 195m 512 @ 140 S12@ 100 S12.@ 150EF S12 @ 150°
20 32m S12@ 150EF S12 @150E*
aa 23m $12. @1508°
EF= EACH =ACE
BELOW GROUND HORIZONTAL REINFORCEMENT
THICKNESS (mm)
Maximum Overall Depth
{Coping to Inside bese face) a0 a8 aoa a2 Bo
12m si2@ 200 12@260)si2.@ 225 Si2@ 200EF s12@300E"
12m 512@ 300 512@240 S12@ 225 S12 @ 300EF S12 @300E*
12m $12@ 300 $iz@250 S12 @ 225 Si2@ 300EF S12 @300E*
135m $12 @ 300 $12 @ 250 $12 @ 225 S12 @ 300EF S12 @300E*
1.6m S12 @ 300 312 @ 280 S12 @ 225 S12 @ 300EF S12 @300E-
185m $12 @ 300 312 @ 280 $12 @ 225 S12 @ 300EF S12 @300E*
195m 512 @ 260 S12.@ 225 S12@ 200K S12 @ 206°
2am Si2@ 200EF siz @300E*
23m 512 @300
EF= EACH =ACE
REINFORCEMENT SPECI-ICATIONS HAVE BEEN DERIVED FROM AS-2783-1992 USE OF REINFORCED CONCRETE FOR SMALL
SW MMING POOLS,
DEVELOPMENT PERMIT FOR BUILDING WORKS
APPROVED WITH CONDITIONS
Permit No. 8140 Date 11 FEB 2019
This is an approved document, Refer tothe Decision
Notice for deals and conaitions applying tothe work
ISSUED BY URBAN CERTIFIERS PTY LTD
300
Finish to Clients or
Contractors requirements —~
$12 intermediates
at 300 CRS-
500
500 MAX
CANTILEVERED EDGE BEAM DETAIL
LINDSAY CONSULTING £7,
THS DRAWING REMAINS/THE PROPERTY OF
LINDSAY CONSULTING PTY LTD AND IS FOR
THE SOLE USE OF THE CLIENT. NO PART
MAY BE USED IN PART OR WHOLE WITHOUT
PRIOR EXPRESS WRITTEN CONSENT OF
LINDSAY CONSULTING PTY LTD
CLIENT AND PROJECT DESCRIPTION
MIKE BOLTON
PROPOSED PATIO & POOL
NO.7 AVOCET PARADE
PEREGIAN BEACH
DRAWING TITLE
TYPICAL REINFORCEMENT
DETAILS
SCALES
SURVEY DATUM
ASSOCIATED CONSULTANTS
REVBSION LST
‘A [ORIGINAL ISSUE BA
seUnFD.DWG.
ae WER EET] Re
18-1811-F8 8A
Used in these records
About this file
- File size
- 16.8 MB (very large file)
- File type
No other editions are linked here.
Original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.