Council archive · source document
7 avocet pde · OPW19/0077
Attached to the e-mail Operational Works Application OPW 19/0077 - DA Form 1 - Plans - 7 Avocet Pde, Peregian Beach.
Very large file (16.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
ATTACHMENT 3 — ADVISORY NOTES These advisory notes do not form part of this approval, however are intended as information and guidance only. (a) | This approval relates to development requiring approval under the Planning Act 2076 only. It is the applicant's responsibility to obtain any other necessary approvals, licences or permits required under State and Commonwealth legislation or Council local law, prior to carrying out the development. For information about Council, State and Commonwealth requirements please consult with these agencies directly (b) | Unless the rights of appeal are exercised, this development approval takes effect from the date the decision notice is given. (c) | The inspections nominated in the condition are mandatory inspections under s24 of the Building Regulation 2006. If the builder for the work is licensed builder, and the builder does not provide a notice of inspection at each required stage of the building work, the building certifier must notify the QBCC of the fact. This may result in a monetary penalty to the builder. (d) | Where work is altered from that shown on the approved plans, and it is not deemed by the building certifier to be ‘generally in accordance’ with the approval, an application to change the development approval (a change application) must be submitted in accordance with s 78 & 79 of the Planning Act 2016. The issuing of a Final Certificate cannot be made until the change application has been approved. A change application must be made in the approved form and accompanied by the required fee. (e) The applicant is requested to ensure all works are completed, inspected and finalised prior to the condition time (refer to condition 3). An extension may be applied for (prior to the condition time), but must be made in the approved form and accompanied by the required fee. (f) No excavation or filling is permitted to occur in any easement without the approval of the holders of the registered interests in the easement. (g) | Any new filling and excavation must be within the limits provided in the local planning scheme. (h) For the duration of the construction period and until all disturbed areas are revegetated or paved, adequate erosion and sediment control devices and site management practices are required to prevent soil erosion and contamination of the stormwater drainage system and waterways. (i) Consent from the Local Authority may be required for the removal of vegetation. (j) The removal of any asbestos must be undertaken in accordance with relevant legislation. (k) Advice regarding the disposal of construction and demolition waste should be sought from the local government. ATTACHMENT 4 — APPEAL RIGHTS The rights of an applicant to appeal to a tribunal or the Planning and Environment Court against a decision about a development application are set out in chapter 6, part 1 of the Planning Act 2016. For particular applications, there may also be a right to make an application for a declaration by a tribunal (see chapter 6, part 2 of the Planning Act 2016). Appeal by an applicant An applicant for a development application may appeal to the Planning and Environment Court against the following: e the refusal of all or part of the development application e aprovision of the development approval e the decision to give a preliminary approval when a development permit was applied for e adeemed refusal of the development application. An applicant may also have a right to appeal to the Development tribunal. For more information, see schedule 1 of the Planning Act 2016. Contact details and further information can be found on the following websites: Development Tribunals: http:/Avww.hpw.gld.gov.au/construction/BuildingPlumbing/DisputeResolution/Pages/DevelopmentTribunals.aspx Planning & Environment Court: http:/Awww.courts.gld.gov.au/courts/planning-and-environment-court Timeframes apply for the lodgement of an appeal. 7 AVOCET PARADE, PEREGIAN BEACH PERMIT NO 8140 PAGE 6 OF 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
7 avocet pde.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.