Skip to the record
Accept no substitutions.

Council archive · source document

7 avocet pde · OPW19/0077

Attached to the e-mail Operational Works Application OPW 19/0077 - DA Form 1 - Plans - 7 Avocet Pde, Peregian Beach.

of 44

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

 

ATTACHMENT 2 — CERTIFICATES FOR PERMIT No. 8140

 

The following tables provide a list of the certificates that are likely to be required before a Final Inspection Certificate
(Form 21) can be issued for the building work. This list is subject to confirmation by Urban Certifiers after carrying
out a final inspection, and additional certificates may be required. Certificates must be from an approved competent

person or a QBCC licensee.

Certificates are required to be in the approved form (Form 15 or 16 as appropriate). In some cases it will be
necessary for these certificates to be supported by evidence of suitability.

 

STAGE CERTIFICATES

 

No! Stage

Notes

 

a) | Pool Barrier

This certificate can only be issued by a building certifier.

 

b) | Final Stage

 

 

This certificate can only be issued by a building certifier.

 

 

ASPECT CERTIFICATES

 

No! Type

Description

 

a) | Structural aspects

Form 16 from the builder confirming the structural aspects have been
constructed in accordance with the approved plans and AS1684.2 and
AS2870.1.

Altematively, the structural aspects can be inspected and certified by a
registered engineer (RPEQ) or a building certifier.

 

b) | Vergola Roof

Form 15 from the manufacturer of the vergola roof system confirming
compliance with relevant Australian Standards (must be certified by a
registered engineer RPEQ). A copy of the relevant plans should also be
provided.

 

c) | Termite management (if
applicable)

Form 16 from a QBCC licensed termite protection contractor, confirming
the building has been provided with a termite management system in
accordance with BCA Part 3.1.3 and AS3660.1-2014. A copy of the
treatment plan/diagram should also be provided.

 

d) | Pool Fence

 

 

 

Where an aluminium or glass pool fencing is used, a certificate from the
manufacturer (or pool fence contractor) confirming the fencing panels
comply with AS1926.1-2007 and/or AS1288-2006 and/or AS2208-1996.

 

 

 

 

7 AVOCET PARADE, PEREGIAN BEACH
PERMIT NO 8140

PAGE 5 OF 6

 

 

Used in these records

About this file

File size
16.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

7 avocet pde.pdf · 16.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.