Council archive · source document
10/0406 - Operational Works - Jetty [As Published] · 142010.406
aa 2. What is the dollar value of the proposed building work? (inc GST, materials and labour)| $ 14,640 Building and operational work assessable against a planning scheme - IDAS form 6 Version 1.0 18 December 2009
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0406 - Operational Works - Jetty [As Published]Related documentApplication case desk ↗
About this file
- File size
- 800 KB (small file)
- File type
No other editions are linked here.