Council archive · source document
10/0406 - Operational Works - Jetty [As Published] · 142010.406
LILO 3. Confirm.the following mandatory supporting information accompanies this application Confirmation of lodgement Method of lodgement All applications for operational works site plans drawn to scale which show the following: e the location and site area of the land to which the application relates (relevant land) e the north point e the boundaries of the relevant land the allotment layout showing existing lots, any proposed lots (including the dimensions of those lots), existing or proposed road reserves, [x]confirmed over the counter building envelopes and existing or proposed open space (note: numbering is required for allt lots) * any existing or proposed easements on the relevant land and their function e any access limitation strips © alt existing and proposed roads and access points on the relevant land ‘a statement about how the proposed development addresses the local government's planning schemes and any other planning documents L confirmed relevant to the application Applications for operational works involving earthworks (filling and excavating) drawings showing: e existing and proposed contours ® areas to be cut and filled ¢ the location and level of any permanent survey marks or reference stations used as datum for the works (C]confirmed e the location of any proposed retaining walls on the relevant land and their height the defined flood level (if applicable) the defined fill level (if applicable) Applications for operational works involving roadworks drawings showing: e existing and proposed contours e the centreline or construction line showing chainages, bearings, offsets if the construction line is not the centreline of the road and all intersection points ¢ information for each curve including tangent point chainages and offsets, curve radii, arc length, tangent length, superelevation (if applicable) and curve widening (if applicable) e kerb lines including kerb radii (where not parallel to centreline) and tangent point changes (where not paraliel to centreline) edge of pavement where kerb is not constructed (confirmed position and extent of channelisation location and details of ail traffic signs, guideposts, guardrail and other street furniture pavement markings including details on raised pavement markers catchpit, manhole and pipeline locations drainage details (if applicable) cross road drainage culverts (if applicable) ‘concrete footpaths and cycle paths location and details for access points, ramps and invert crossings changes in surfacing material Building and operational work assessable against a planning scheme - IDAS form 6 Version 1.0 18 December 2009
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0406 - Operational Works - Jetty [As Published]Related documentApplication case desk ↗
About this file
- File size
- 800 KB (small file)
- File type
No other editions are linked here.