Skip to the record
Every meeting, every word.

Council archive · source document

Approved Plan - 51995.1645.01 (As Published)

of 8

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                                                                                                                                                                                                                                 TENDER
                                                                                                                                                                                                                                                                                                NOT FOR CONSTRUCTION

                                                                                                                                                                                                                                                                          GENERAL NOTES:
                                                                                                                                                                                                                                                                          (these notes apply to all drawings)

                                                                                                                                                                                                                                                                          •      These designs, drawings and specifications are copyright
                                                                                                                                                                                                                                                                                 and the property of Cayas + Ward and must not be used,
                                                                                                                                                                                                                                                                                 reproduced or copied wholly or in part without the
                                                                                                                                                                                                                                                                                 permission of Cayas + Ward.
                                                                                                                                                                                                                                                                          •      Do not scale - use figured dimensions in preference to
                                                                                                                                                                                                                                                                                 scaled dimensions.
                                                                                                                                                                                                                                                                          •      All dimensions must be checked on site prior to the
                                                                                                                                                                                                                                                                                 commencement of construction and/or manufacture of any
                                                                                                                                                                                                                                                                                 item.
                                                                                                                                                                                                                                                                          •      Where demolition work is included, allow to make good all
                                                                                                                                                                                                                                                                                 affected surfaces.
                                                                                                                                                                                                                                                                          •      Ensure that all conditions of the building certification are
                                                                                                                                                                                                                                                                                 complied with.
                                                                                                                                                                                                                                                                          •      Where ambiguities or discrepancies exist, Cayas + Ward
                                                                                                                                                                                                                                                                                 shall be contacted for clarification, or it will be deemed that
                                                                                                                                                                                                                                                                                 the more expensive option has been allowed.
                                                                                                                                                                                                                                                                          •      All work is to comply with all relevant sections of NCC
                                                                                                                                                                                                                                                                                 and/or Australian Standards.
                                                                                                                                                                                                                                                                          •      These drawings are to be read in conjunction with all other
                                                                                                                                                                                                                                                                                 documentation, schedules & consultant documentation.
                                                                                                                                                                                                                                                                          •      The contractor is to allow for all necessary floor preparation
                                                                                                                                                                                                                                                                                 works.
                                                                                                                                                                                                                                                                          •      Provide all warranties as per the manufacturers & suppliers
                                                                                                                                                                                                                                                                                 standard warranties.
                                                                                                                                                                                                                                                                          •      All materials, equipment, fixtures, fittings, etc. Shall be new
                                                                                                                                                                                                                                                                                 first quality without exception. Supply, delivery, storage,
                                                                                                                                                                                                                                                                                 installation, etc. Is to be as per the manufacturers most
                                                                                                                                                                                                                                                                                 recent written recommendations.
                                                                                                                                           EXISTING AWNINGS TO BE REMOVED                                                             EXISTING SIGNAGE TO BE MODIFIED     •      Supply & install fire extinguishers to comply with Australian
                                                                                                                                           SHOWN DASHED                                                                                                                          Standards to the area of the proposed work.
                                                                                                                                                                                                                                                                          •      Termite protection is to be provided to comply with AS
                                                                                                                                                                                                                                                                                 3660.1-2000 and clarification to be provided on completion.
                                                                                                                                                                                                                                                                          •      The construction and fit out of commercial kitchens and
                                                                                                                                                                                                                                                                                 bars are to comply with AS 4674-2004.
                                                                                                                                                                                                                                                                          •      Builder to inspect existing walls that are proposed to have
                                                                                                                                                                                                                                                                                 new finishes and ensure that a suitable substrate is present
                      Level 1                                                                                                                                                                                                                                                    or is provided to achieve the specified finish. Builder to
                                                                                                                                                                                                                                                                                 inspect existing walls that are proposed to conceal services
                                                                                                                                                                                                                  2               3
                      16.785                                                                                                                                                                                                                                                     and ensure that an adequate cavity is present or provide
                                                                                                                                                                                                                                                                                 furring channels.




                                                                                                                                       1
                      Upper Ground Floor
                      13.410



                                                                                                                                                                                                                LOCATION OF NEW
                                                                                                                                                                                                                OPENING FOR NEW
                                                                                                                                                                                                                WINDOW
                      Lower Ground Floor
                      10.000




                                                                                                                                                                                     Council Annotation:
                         Existing + Demolition - West Elevation
                                                                                                                                                                                     These       plans     refer to  approval
                1         1 : 100
                                                                                                                                                                                     51995.1645.01 and approve the new works
                                                                                                                                                                                     in red linework only.

                                                                                           EXISTING AWNING TO BE REMOVED                                                    EXISTING AWNING TO BE REMOVED




                                                                                                                                                               2                                                   3


                                                                          1                             2
         EXISTING AWNING TO BE REMOVED




                                                                                                                                                                                                                                                                           D               General Updates                  RH        16.05.25
                                                                                                                                                                                                                                                                           C               General updates                  DV        29.04.25
                                                                                                                                                                                                                                                                           B               Consultant Issue                 RH        12.02.25
                                                                                                                                                                                                                                                                           A               Consultant Issue                 RH        24.01.25
                                                                                                                                                                                                                                                                         issue                   revision                  initials     date


                                                                                                                                                                                                                                                                                        Cayas
                                                                                                                                                                                                                                                                                          + Ward
                                                                                                                                                                                                                                                                         Suite 2, 19-25 Musk Avenue, Kelvin Grove. PO Box 360, Wilston Q 4051
                                                                                                                                                                                                                                                                                     p 07 3356 6100 e [email protected]
                                                                                                                                                                                                                                                                                NSW Nominated Architect: Kimberley James Garton 8891

                                                                                                                                                                                                                                                                        client                     ALH Group


                                                            EXISTING GAMING ENTRY AWNING                             EXISTING AWNING                                                    EXISTING ENTRY AWNING                                                           project                    Noosa Reef Hotel
                                                                                                                                                                                                                                                                                                   19 Noosa Dr, Noosa Heads
                                                                                                                                                                                                                                                                                                   QLD 4567
                                                                                                                                                                                                                                                                        drawing title              Existing West Elevation



                                                                                                                                                                                               NOOSA COUNCIL                                                                                     drawn         RH

                                                                                                                                                                                               APPROVED PLAN                                                                                     date

                                                                                                                                                                                                                                                                                                 scale
                                                                                                                                                                                                                                                                                                               MAY 2025
                                                                                                                                                                                                                                                                                                               1 : 100@A1

                                                                                                                                                                                           51995.1645.01 1 AUG 2025                                                     project no.

                                                                                                                                                                                                                                                                        2395
                                                                                                                                                                                                                                                                                                  drawing number

                                                                                                                                                                                                                                                                                                  A100.04
                                                                                                                                                                                                                                                                                                                                         issue

                                                                                                                                                                                                                                                                                                                                           D
Document Set ID: 23750179
Version: 1, Version Date: 20/05/2025

Used in these records

About this file

File size
5.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Approved Plan - 51995.1645.01 (As Published).pdf · 5.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.