Skip to the record
Every meeting, every word.

Council archive · source document

Approved Plan - 51995.1645.01 (As Published)

of 8

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                                                                                                                                                                                                                                                                                                                                                      TENDER
              NOOSA COUNCIL                                                                                                                                                                                                                                                                                                                                                                    GENERAL NOTES:
                                                                                                                                                                                                                                                                                                                                                                                                                     NOT FOR CONSTRUCTION




              APPROVED PLAN
                                                                                                                                                                                                                                                                                                                                                                                               (these notes apply to all drawings)

                                                                                                                                                                                                                                                                                                                                                                                               •      These designs, drawings and specifications are copyright
                                                                                                                                                                                                                                                                                                                                                                                                      and the property of Cayas + Ward and must not be used,
                                                                                                                                                                                                                                                                                                                                                                                                      reproduced or copied wholly or in part without the

          51995.1645.01 1 AUG 2025                                                                                                                                                                                                                                                                                                                                                             •

                                                                                                                                                                                                                                                                                                                                                                                               •
                                                                                                                                                                                                                                                                                                                                                                                                      permission of Cayas + Ward.
                                                                                                                                                                                                                                                                                                                                                                                                      Do not scale - use figured dimensions in preference to
                                                                                                                                                                                                                                                                                                                                                                                                      scaled dimensions.
                                                                                                                                                                                                                                                                                                                                                                                                      All dimensions must be checked on site prior to the
                                                                                                                                                                                                                                                                                                                                                                                                      commencement of construction and/or manufacture of any
                                                                                                                                                                                                                                                                                                                                                                                                      item.
                                                                                                                                                                                                                                                                                                                                                                                               •      Where demolition work is included, allow to make good all
                                                                                                                                                                                                                                                                                                                                                                                                      affected surfaces.
                                                                                                                                                                                                                                                                                                                                                                                               •      Ensure that all conditions of the building certification are
                                                                                                                                                                                                                                                                                                                                                                                                      complied with.
                                                                                                                                                                                                                                                                                                                                                                                               •      Where ambiguities or discrepancies exist, Cayas + Ward
                                                                                                                                                                                                                                                                                                                                                                                                      shall be contacted for clarification, or it will be deemed that
                                                                                                                                                                                                                                                                                                                                                                                                      the more expensive option has been allowed.
                                                                                                                                                                                                                                                                                                                                                                                               •      All work is to comply with all relevant sections of NCC
                                                                                                                                                                                                                                                                                                                                                                                                      and/or Australian Standards.
                                                                                                                                                                                                                                                                                                                                                                                               •      These drawings are to be read in conjunction with all other
                                                                                                                                                                                                                                                                                                                                                                                                      documentation, schedules & consultant documentation.
                                                                                                                                                                                                                                                                                                                                                                                               •      The contractor is to allow for all necessary floor preparation
                                                                                                                                                                                                                                                                                                                                                                                                      works.
                                                                                                                                                                                                                                                                                                                                                                                               •      Provide all warranties as per the manufacturers & suppliers
                                                                                                                                                                                                                                                                 FC1                                                      FC2                                                                         standard warranties.
                                                                                                                                                                                                                                                                                                                                                                                               •      All materials, equipment, fixtures, fittings, etc. Shall be new
                                                                                                                                                                                                                                                                 ALUMINIUM SCREEN                                         FIBRE CEMENT CLADDING                                                       first quality without exception. Supply, delivery, storage,
                                                                                                                                                                                                                                                                                                                                                                                                      installation, etc. Is to be as per the manufacturers most
                                                                                                                                                                                                                                                                                                                                                                                                      recent written recommendations.
                                                                                                                                                                                                                                                                                                                                                                                               •      Supply & install fire extinguishers to comply with Australian
                                                                                                                                                                                                                                                                                                                                                                                                      Standards to the area of the proposed work.
                                                                                                                                                                                                                                                                                                                                                                                               •      Termite protection is to be provided to comply with AS
                                                                                                                                                                                                                                                                                                                                                                                                      3660.1-2000 and clarification to be provided on completion.
                                                                                                                                                                                                                                                                                                                                                                                               •      The construction and fit out of commercial kitchens and
                                                                                                                                                                                                                                                                                                                                                                                                      bars are to comply with AS 4674-2004.
                                                                                                                                    NO WORK TO LEVEL 1                                                                                                                                                                                                                                         •      Builder to inspect existing walls that are proposed to have
                                                                                                                                                                                                                                                                                                                                                                                                      new finishes and ensure that a suitable substrate is present
                                                                                                                                                                                                                                                                                                                                                                                                      or is provided to achieve the specified finish. Builder to
                                                                                                                                                                                                                                                                                                                               4                                                                      inspect existing walls that are proposed to conceal services
                                                                                                                                                                                                         2                                                             3                                                                                                                              and ensure that an adequate cavity is present or provide
                                                                                                                                                                                                                                                                                                                             A100.05
                                                                                                                                                                                                       A100.05                                                   A100.05                                                                                                                              furring channels.
                                                                                                                                                                                                                                                                                     NEW WINDOW AWNING
                                                                                                                                                                                                                                                                                                                                                                    EXISTING SIGNAGE PYLON
                                                                                                                                                                                                                                                                                                                                                                    TO REMAIN, SHOWN
                                                                                                                                                                                                                                                                                     NEW GLAZING TO EXISTING WALL                                                   DASHED FOR CLARITY

                                                                                                                                                                                                                       NEW SCREEN                                                    NEW ENTRY AWNING AND FEATURE WALL


                                                                                                                                                                                                                       NEW ENTRY AWNING TO GAMING ROOM




                     Level 1                                                                                                                                                                                                                                                                                                       FC1




                                                                                                                                                                                                                                                                                                                                                  1425
                     16.785                                                                                                                                                                  FC1
                                                                                                                                                                                                                                                                                                       FC1                         FC2




                                                                                                                                                                                                                                                         440
                                                                                                                                                                                                                                                         1150

                                                                                                                                                                                                                                                                1150




                                                                                                                                                                                                                                                                                                                                                  2625
                                                                                                                                                                                                             FC1




                                                                                                                                                                                                                       1095
                     Upper Ground Floor                                                                                                                                                                      FC2

                     13.410




                                                                                                                                                                                                                       2415
                                                                                                                                                                                                                                                                                                                                                                    NEW PICKET FENCE

                                                                                                                                                                                                                                                                                                                                                                    WIDENED OPENING BEYOND


                            Lower Ground Floor
                           10.000




                                                                                                                                                                                                                                                                Council Annotation:
                                                                                                                                                                                                                                                                These      plans     refer   to application
                               Proposed - West Elevation
                      1         1 : 100                                                                                                                                                                                                                         51995.1645.01 and approve the works
                                                                                                                                                                                                                                                                within the blue linework only.                                                           EXISTING SIGNAGE PYLON
                                                                                                                                                                                                                                                                                                                                                         TO REMAIN, SHOWN
                                                                                                                                                                                                                                                                                                                                                         DASHED FOR CLARITY


                                                                                                  NEW SCREEN
                                                                                                                                                                        NEW WINDOW AWNING
                                                                                                  NEW ENTRY AWNING TO GAMING ROOM


                                                                                                                                                                        NEW GLAZING TO EXISTING WALL


                                                                                                                                                                                                                                                                                                                    FC1
                                       Level 1




                                                                                                                                                                                                                                                                                                                                                  1425
                                       16.785                        FC1
                                                                                                                                                                                                                 FC1                                                                                                FC2
                                                                                                                                            440
                                                                                                                                            1150

                                                                                                                                                   1150




                                                                                                                                                                                                                                                                                                                                                  2625
                                                                                                                                                                                                                                                                                                                                                                                                A               General Updates                  RH        16.05.25
                                                                                                                                                                                                                                                                                                                                                                                              issue                   revision                  initials     date
                                                                                  FC1
                                                                                                                                                                                                                                                                                                                                                                                                             Cayas
                                                                                                    1095




                                       Upper Ground Floor
                                                                                  FC2
                                                                                                                                                                                                                                                                                                                                                                                                               + Ward
                                                                                                                                                                                                                                                                                                                                                                                              Suite 2, 19-25 Musk Avenue, Kelvin Grove. PO Box 360, Wilston Q 4051
                                       13.410                                                                                                                                                                                                                                                                                                                                                             p 07 3356 6100 e [email protected]
                                                                                                                                                                                                                                                                                                                                                                                                     NSW Nominated Architect: Kimberley James Garton 8891

                                                                                                                                                                                                                                                                                                                                                                                             client                     ALH Group
                                                                                                    2415




                                                                                                                                                                                                                                                                                                                                                         NEW PICKET FENCE                    project                    Noosa Reef Hotel
                                                                                                                                                                                                                                                                                                                                                                                                                        19 Noosa Dr, Noosa Heads
                                                                                                                                                                                                                                                                                                                                                                                                                        QLD 4567
                                                                                                                                                                                                                                                                                                                                                         WIDENED OPENING BEYOND
                                                                                                                                                                                                                                                                                                                                                                                             drawing title              Proposed West Elevation




                                       Lower Ground Floor                                                                                                                                                                                                                                                                                                                                                             drawn        RH
                                       10.000                                                                                                                                                                                                                                                                                                                                                                         date         MAY 2025
                                                            Elevation - Proposed Gaming Entry Awning                                      Elevation - Proposed Window                                                                                                      Elevation - Proposed Entry Awning                                                                                                          scale        As indicated@A1
                                                    2       1 : 50
                                                                                                                                    3       1 : 50
                                                                                                                                                                                                                                                                       4   1 : 50                                                                                                            project no.               drawing number                         issue

                                                                                                                                                                                                                                                                                                                                                                                             2395                      A100.05                                  A
Document Set ID: 23750179
Version: 1, Version Date: 20/05/2025

Used in these records

About this file

File size
5.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Approved Plan - 51995.1645.01 (As Published).pdf · 5.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.