Skip to the record
Accept no imitations.

Original source · versioned page text

Attachment 7- Site Based Stormwater Management Plan

Attached to the e-mail Response to Information Request - RAL18/0023.

of 46

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
5.0 CONCLUSION

This site-based stormwater management plan has reviewed the stormwater quality
management at the proposed development at Noosaville, Queensland.


Based on this assessment the following conclusions have been made:


 The proposed development includes Stormwater Quality Improvement Devices being
   bioretention basins and vegetated swales treating post-developed flows from the
   proposed road reserve only, in accordance with the Qld SPP (2017). The total amount
   of treatment devices are as follows:
         o   Vegetated swale (total length) = 20m
         o   Bioretention basin (total area) = 125m2


   In the event the individual lots created by this subdivision are developed, they will require
   SQIDs to satisfy stormwater runoff pollutant removal targets for each specific lot.

In summary, stormwater leaving the site will satisfy the pollutant removal criteria in Council’s
Planning Scheme and the Qld SPP.




Site Based Stormwater Management Plan                                               Page 17 of 20
1856-SBSMP-01_Version 2.0 (April 2019)
Log in to download the original file

Attachment 7- Site Based Stormwater Management Plan.pdf · 5.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.