Original source · versioned page text
Attachment 7- Site Based Stormwater Management Plan
Attached to the e-mail Response to Information Request - RAL18/0023.
Plans and drawings: the text below has words only, no drawings.
6.0 LIMITATIONS OF THIS REPORT This Site Based Stormwater Management Plan (SBSMP) has been tailored to report on issues in the areas of interest, as detailed above. The information in this report is not to be used outside of the subject area. We consider that this SBSMP accurately considers conditions at the area of interest at the time the SBSMP was developed and based on information supplied to us by second and third parties. This SBSMP is to be reviewed, if site conditions change in the future. This SBSMP has been undertaken for the specific purposes of the Stockwell Pty Ltd, as detailed in our correspondence to them, and is solely for their use. This SBSMP should only be used in full and may not be used to support objectives other than those set out herein, except where written approval, with comments, are provided by Barlow Shelley Consulting Engineers. Barlow Shelley Consulting Engineers accept no liability with respect to the accuracy of information supplied by second and third parties. Site Based Stormwater Management Plan Page 18 of 20 1856-SBSMP-01_Version 2.0 (April 2019)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.