Original source · versioned page text
Attachment 7- Site Based Stormwater Management Plan
Attached to the e-mail Response to Information Request - RAL18/0023.
Plans and drawings: the text below has words only, no drawings.
Part 2: Construction phase — stormwater management design objectives for temporary drainage works Ue AACE Eton eed eta ice eee Cem oe LiLe| PU Tees pee wi eliidird Phe smelt) pee Muar Drainage structure 1in 2 year 1in5 year 1in 10 year ARI/39% AEP AR1/18% AEP ARI/10% AEP Where located immediately up-slope of an occupied 1in 10 year ARI/10% AEP property that would be adversely affected by the failure or overtopping of the structure Culvert crossing 1in1year ARI/63% AEP Part 3: Construction phase — stormwater management design objectives for emergency spillways on temporary sediment basins Drainage structure Anticipated operation design life and PES Reus Beaudry PEM Cy rd Emergency spillways on temporary sediment basins 1in 10 year 1in 20 year 1in 50 year ARI/10% AEP ARI/5% AEP ARI/2% AEP Note: Refer to IECA 2008 Best Practice Erosion and Sediment Control (as amended) for details on the application of the Construction Phase requirements. Advice should be obtained from a suitably qualified person e.g. Certified Practitioner in Erosion and Sediment Control, or Registered Professional Engineer Queensland, with appropriate knowledge and experience in erosion and sediment control design and implementation. State Planning Policy page 81
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.