Original source · versioned page text
Attachment 7- Site Based Stormwater Management Plan
Attached to the e-mail Response to Information Request - RAL18/0023.
Plans and drawings: the text below has words only, no drawings.
Table B: Post construction phase — stormwater management design objectives Application: (a) A material change of use for an urban purpose that involves premises 2500 metres? or greater in size and: (a) will result in six or more dwellings; or (b) an impervious area greater than 25 per cent of the net developable area. (2) Reconfiguring a lot for urban purposes that involves premises 2500 metres? or greater in size and will result in six or more lots. fete teressatei) Design objectives Reductions in mean annual load from unmitigated development (%) Total Total Total foro) Waterway stability STs eT (| phosphorus aces 4) POU CMU CLE lil’ solids (TSS) (TP) (TN) PT South East Queensland 80 60 45 90 Limit the peak 1-year ARI event discharge within the receiving Central Queensland (north) 75 60 4o%s 90 waterway to the pre-development peak Central Queensland (south) 85 60 45 90 Cape YANKS, wet tropics and 80 60% 40 90 1-year ARI discharge dry tropics Western Queensland’ 85 60 45 go Notes: * Mapping of climatic regions is available on the State Planning Policy Interactive Mapping System. ¢ In lieu of modelling, the default bio-retention treatment area to comply with load reduction targets for all Queensland regions in 1.5 per cent of the contributing catchment area. * Water stability objective applies if development drains to an unlined waterway within or downstream of the site where a risk of increased erosion exists due to changes in hydrology. Local government may also require application of the waterway stability objective where there are planned future rehabilitation works to return a lined channel to a natural channel design. * The SPP Water quality guidance material provides advice on the measures that demonstrate compliance with table B. ™ Note: Applies to population centres greater than 25,000 persons. Note: Mackay Regional Council has adopted a 35 per cent reduction for TN. Note: Townsville City Council has adopted a 65 per cent reduction for TP. page 82
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.