1856-Construction Management Plan (Prelim V2) Oct 2020 - Barlow Shelley · OPW20/0145
Plans and drawings: the text below has words only, no drawings.
4.2 Temporary Fencing & Pedestrian Movement Detailed Temporary Fencing and Pedestrian movements will be in accordance with the Contractor supplied plan prior to commencement of works on site. 4.3 Control of Emissions All air, noise, vibration and light emissions are to be controlled and maintained within acceptable limits in accordance with standard industry guidelines. Refer to Local Authority Policy or the Environmental Protection Act (EPP Noise) for further detail. 4.4 Water Quality All existing drainage lines are to be maintained and protected from sediment runoff from the proposed work areas. Appropriate erosion and sediment control measures are to be implemented to achieve acceptable water quality objectives, including groundwater from excavations. Any water released from the site must meet the water quality objectives found in Table A of the SPP Code: Water Quality, Appendix 3, Qld SPP (DSDIP, 2014). 4.5 Mud and Dust Control Sprinkler or light water spray systems shall be in place during earthworks to control airborne dust and pollutants if/as necessary. Any resultant mud from this process will be managed via the Erosion & Sediment Control systems in place during site construction. The egress of mud from the site should be controlled via the use of shaker grids at the site entry, as necessary. 4.6 Waste Management Sprinkler or light water spray systems shall be in place during earthworks to control airborne dust and pollutants if/as necessary. Any resultant mud from this process will be managed via the Erosion & Sediment Control systems in place during site construction. 4.7 Erosion and Sediment Control It is the responsibility of the Contractor to ensure that all erosion and sediment control measures are implemented prior to commencement and maintained during the construction period. Standard ESC measures must be in utilized generally in accordance with the IECA Guidelines, EPP Water Policy and current best practice methods. A day-to-day working Preliminary Construction Management Plan 10 October 2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
1856-Construction Management Plan (Prelim V2) Oct 2020 - Barlow Shelley.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.