4.0     CONSTRUCTION MANAGEMENT


4.1    Traffic Control & Parking

Detailed Traffic Management and Signage will be in accordance with the Contractor
supplied plan submitted to Council before works commence on site. A preliminary Traffic
Guidance Scheme (TGS) has been prepared to accompany this document as part of the
Operational Works submission to Council (refer appendix A). Parking for construction
workers is indicates for proposed Lot 4 with site sheds being located here also.


Large deliveries and heavy vehicles shall enter site generally via the existing roundabout
stub on Walter Hay Drive as depicted in the figure below.




Preliminary Construction Management Plan                                              9
October 2020

Used in these records

About this file

File size
3.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

1856-Construction Management Plan (Prelim V2) Oct 2020 - Barlow Shelley.pdf · 3.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.