Council archive · source document
1856-Construction Management Plan (Prelim V2) Oct 2020 - Barlow Shelley · OPW20/0145
Plans and drawings: the text below has words only, no drawings.
DOCUMENT INFORMATION
Document Title: Construction Management Plan (Prelim)
Document Reference No. 1856_CMP_01 Version 2
Commissioned By: Stockwell Development Group Pty Ltd
Prepared By: Barlow Shelley Consulting Engineers (Aust) Pty Ltd
Author: Cameron Landreth (BEng, NER, RPEQ)
DOCUMENT CONTROL
Version Date Author Reviewer
1.0 31 August 2020 Cameron Landreth Cameron Landreth
2.0 16 October 2020 Cameron Landreth Cameron Landreth
“©2020 Barlow Shelley Consulting Engineers (Aust) Pty Ltd All Rights Reserved. Copyright in the
whole and every part of this document belongs to Barlow Shelley Consulting Engineers (Aust)
Pty Ltd and may not be used, sold, transferred, copied or reproduced in whole or in part in any
manner or form or in or on any media to any person without the prior written consent of Barlow
Shelley Consulting Engineers Pty Ltd”
Preliminary Construction Management Plan 2
October 2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
1856-Construction Management Plan (Prelim V2) Oct 2020 - Barlow Shelley.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.