1856-Construction Management Plan (Prelim V2) Oct 2020 - Barlow Shelley · OPW20/0145
Plans and drawings: the text below has words only, no drawings.
2.0 PROJECT DETAILS 2.1 Description The development site is located at 28 Eenie Creek Road, Noosaville and is described as Lot 3 on SP246584. This CMP covers traffic management, safe pedestrian access, water quality management and erosion and sediment control, works programme and protection of existing infrastructure in and around the Noosa Civic centre. 2.2 Extent of Works Works are to be constructed in accordance with the following documents and specifications: · Reconfiguration of Lot Application Noosa Council reference (RAL18/0023). · Engineering Plans 1856-R30–R63, SW01-SW30, EW01-EW10 by Barlow Shelley Consulting Engineers · IECA Guidelines 2.3 Construction Timeline and Work Hours The approved working hours are 6.30am to 6.30pm Monday to Saturday. Notification is to be given to Development Assessment of any work that is to be undertaken outside of normal business hours noted above, Strict approval must be sought from Council prior to site/operational/building work commencing. No work is to occur on Public Holidays. A likely exception to this will be spotter catcher clearing which is sometimes required to occur at sunrise. During the summer months, this is before 6.30pm. As above, written consent will be requested from Council by the Fauna Management contractor for permission to carry out spotter catcher works before 6.30am. A detailed program of works will be the responsibility of the Contractor and shall be distributed to all consultants and other parties involved in the construction phase of the project. The program will need to incorporate the following: · Site establishment and ESC measures · Earthworks · Drainage works · Driveway access · Landscaping Preliminary Construction Management Plan 5 October 2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
1856-Construction Management Plan (Prelim V2) Oct 2020 - Barlow Shelley.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.