1856-Construction Management Plan (Prelim V2) Oct 2020 - Barlow Shelley · OPW20/0145
Plans and drawings: the text below has words only, no drawings.
1.0 INTRODUCTION This Preliminary Construction Management Plan (CMP) has been commissioned by Stockwell Development Group Pty Ltd and compiled to generally satisfy Advisory Note 4 of the Reconfiguration of Lots Application (RAL18/0023). The CMP addresses traffic management, safe pedestrian access, fencing, water quality management and erosion and sediment control, works program and protection of existing infrastructure for the proposed development at Eenie Creek Road, Noosaville. This Preliminary CMP has been developed in accordance with the New Noosa Plan 2020, Planning Scheme Policy 06 Engineering Design Standards. The CMP addresses the construction phase procedures that are to be implemented by the principal construction Contractor and his subordinate contractors, to ensure that working areas are maintained to suitable standards generally in accordance with best management practices and regulatory requirements. Preliminary Construction Management Plan 4 October 2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
1856-Construction Management Plan (Prelim V2) Oct 2020 - Barlow Shelley.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.