Skip to the record
Accept no imitations.

Council archive · source document

1856-Construction Management Plan (Prelim V2) Oct 2020 - Barlow Shelley · OPW20/0145

of 27

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
1.0     INTRODUCTION

This Preliminary Construction Management Plan (CMP) has been commissioned by
Stockwell Development Group Pty Ltd and compiled to generally satisfy Advisory Note 4
of the Reconfiguration of Lots Application (RAL18/0023). The CMP addresses traffic
management, safe pedestrian access, fencing, water quality management and erosion and
sediment control, works program and protection of existing infrastructure for the proposed
development at Eenie Creek Road, Noosaville.


This Preliminary CMP has been developed in accordance with the New Noosa Plan 2020,
Planning Scheme Policy 06 Engineering Design Standards. The CMP addresses the
construction phase procedures that are to be implemented by the principal construction
Contractor and his subordinate contractors, to ensure that working areas are maintained to
suitable standards generally in accordance with best management practices and regulatory
requirements.




Preliminary Construction Management Plan                                              4
October 2020

Used in these records

About this file

File size
3.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

1856-Construction Management Plan (Prelim V2) Oct 2020 - Barlow Shelley.pdf · 3.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.