3.5 Communication Protocol
The following organizational chart describes the framework with respect to the
communication between relevant parties. Communication flow between parties should be
directed to the personnel/party directly upstream or downstream as indicated on the chart.
Stockwell Development Group
Civil Superintendent
Barlow Shelley Consulting
Engineers (TBC)
Civil Contractor
To be advised
Administering Authority
Noosa Shire Council &
Unitywater
Other Consultants
(Environmental, Geotechnical,
Landscaping, etc)
Preliminary Construction Management Plan 8
October 2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
1856-Construction Management Plan (Prelim V2) Oct 2020 - Barlow Shelley.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.