CIV02756 - Information Response Cover Letter
Attached to the e-mail RAL21/0016 - Response to Council's Information Request.
Issue – Sewer Connection
The Concept Engineering Services Plan details a proposed sewer main connection to Lot 1
that crosses Goodwin Street but does not show any further detail on the proposed alignment
to connect into the existing sewer network.
Information Required
2. Provide an additional plan that details the alignment of the proposed sewer main to the
connection point with the existing sewer network and indicate the proposed installation
method (trenching or boring) across Goodwin St and for the remainder of the alignment in
Council’s road reserve. In addition, please provide any supporting documentation that would
indicate the service authorities’ support for the proposed connection/extension to their existing
network.
Response:
Enclosed in the Information Response is the proposed sewer main extension drawing (2756-500)
prepared for Unitywater.
Contour notes that subject site is contained within Unitywater Connection area, therefore Unitywater is
required to allow connections to the site. The proposed extension is required due to the depth of the
existing infrastructure not being adequate to command the allotments. Attached below is mapping
supporting the site being locate in the connection area.
CIV02756 – 108 Goodwin Road – RFI Response (Full)
MF/SC 2