Council archive · source document
08/0052 - MCU - Detached House [As Published] · 132008.52
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA
4.11
|s any of the operational work proposed to be carried out within a coastal management district?
DINo
LD Yes
If yes, is the proposed operational work for the following?
interfering with quarry material on State coastal land above high-water mark Lino (1) Yes
Disposing of dredge spoil or other solid waste material in tidal watert CJNo [7] Yes
(PA schectila 8 part 1. table ¢ tem
Act 1998 Act 4995, sochan 124A (wild
Draining or allowing drainage or flow water or other matter across State costal land above high- CJNo (Yes
water mark
Constructing or installing works in a watercourse where the works are not assessable under IPA, [] No (J Yes
schedule 8, part 1, table 4, items 3 or 4
Reclaiming land under tidal waters Ono Des
Constructing an artificial waterway, other than a canal, associated with reconfiguring a lot [no (Yes
Constructing an artificial waterway that is a canal, associated with reconfiguring a lots Ono (Yes
Constructing an artificial waterway not associated with reconfiguring a lot on land, other than State []No (1) Yes
coastal land, above high-water if the maximum surface area of water on the waterway is at least
5,000m?
Constructing a bank or bund wall to establish a ponded pasture on land, other than State coastal LJNo (1) Yes
land, above high-water mark
Removing or interfering with coastal dunes on land, other than State coastal land, that is in an [No LYes
erosion prone area and above high-water mark
If yes to one or more, is any of the proposed work to be cared out in a wild river area under the Wild Rivers Act 2005?
Oo No - (Complete Form 1, Part M) This application requires assessment by the Environmental Protection Agency (EPA). if EPA is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. If yes, above, fo any shown bold and marked
with the symbol! ®, the application also requires assessment by Queensland Transport (Marine Safety Qid) as Concurrence Agency.
OYes
If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
Yes - Unless the application is consistent with eny property development plan applying to the land, the Assessment Manager must refuse fo
receive it (Complete Form 1, Part M) This application requires assessment by the Environmental Protection Agency (EPA). If EPA is not
the Assassment Manager for the application, the agency has jurisdiction as concurrence Agency. If yes, above, to any shown bold and
marked with the symbol ®, the application also requires assessment by Queensland Transport (Marine Safety Qld} as Concurrence
Agency. Subject to the declaration for the relevant wild river area, the application also requires assessment for the purposes of the Witt
Rivers Act 2005.
C] No - An application for the operational work would be taken to be not properly made and the Assessment Manager must refuse (o receive it.
5, IP Re hon schedule 2. sable 2 ctems 12 and 14, (P Regulation .cheduie 1. pat 3 fadie 4, len. 4A and 5 Coastal Protection and Management
Rivers Act 2005. secton 434.
Page 28
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0052 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.