08/0052 - MCU - Detached House [As Published] · 132008.52
INTEGRATED PLANNING ACT 1997 (DAS Assessment Checklist, Version 21.0, 3 September 2007
WATERWAY BARRIER WORKS; WILD RIVER AREA
4.12. |{s any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
ONo DD Yes
If yes, is any of the proposed operational work to be carried out in a wild river area declared under the Wild Rivers Act 2005?
LNo
If no, is all of the operational work for constructing or raising waterway barrier works -
¢ — intended to exist for no more than 28 days; and
© built of raised in freshwater; and
¢ — no more than 20m in length and no more than 3m in height from the lowest point on the stream bed?
Yes (No
If no, is all of the operational work for constructing or raising waterway barrier works -
¢ more than 100km from the coastfine; and
ein the smallest unbranched tributary of a catchment or a stream into which that tributary flows
oO Yes oO No - (Complete Form 1, Part O3) This application requires assessment by the Department of Primary industries and
Fisheries (OPI&F). If DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence
Agency.
(Yes
If yes, is any of the proposed operational work to be carried out in a wild river high preservation area?
No - Uniess the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to receive
it (Complete Form 1, Part Os) This application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). and,
subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. If OPI8F is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
oO Yes - An application for the operational work would be taken to be not property made and the Assessment Manager must refuse to receive it.
IPA sofvy dute 8, part} table 4, nem
1994 secbon 76D (wid ver area) W
Shetty 6. part 2, table 4, tent 2, 1P Keaulahon, schethua 2. tabla 2, tem 23: 1P Reguiston, schede 1, part 3, table 4, tear §, Fisieaas Act
vers Act 2005, section 434,
DECLARED FISH HABITAT AREA; WILD RIVER AREA .
4.13 | Is any of the proposed operational work to be carried out completely or partly within a declared fish habitat area under the Fisheries
Act 1994.
{No C1 Yes
If yes, indicate what the operational work is reasonable necessary for (Tick applicable box/es)
e — The maintenance of existing structures, including for example the following structures, if the structures CI No [3 Yes
were constructed in compliance with ail the requirements, under any Act, relating to a structure of that
type -
« Boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming enclosures & weirs;
+ Existing powerlines or associated powerline infrastructure
¢ Educational or research purposes relating to the fish habitat area Dino 11 Yes
¢ Monitoring the impact of development on the declared fish habitat area [LINo [1 Yes
* — Other purposes Ono (1 Yes
Ifyes to Other purposes’, is that proposed operational work to be carried out in a wild river area declared under the Wild
Rivers Act 2005?
oO No - (Complete Form 1, Part 0,) This application requires assessment by the Dapartment of Primary Industries and Fisheries (DPI8F). If DPI&F is not the
Assessment Manager for the appiication, the agency will have jurisdiction as Concurrence Agency.
OyYes
If yes, is alt of the proposed operational work for specified works under the Wild Rivers Act 2005?
oO Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to receive
it. (Complete Form 1, Part 02) This application requires assessment by the Department of Primary Industries and Fisheries (DPI&F) and
assessment for the purposes of the Wild Rivers Act 2008. If DPI&F is not the Assessment Manager for the appiication, the agency has
jurisdiction as Concurrence Agency.
[LINo
If no, is any of the proposed operational work to be carried out in a wild river high preservation area?
0 No - Unies the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it. (Complete Form 1, Part O2) This application requires assessment by the Department of Primary industries and Fisheries
(OPI&F) and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. If DPI&F
55 not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
oO Yes - An application for the operational work would be taken to be not properly made and the assessment manager must refuse to receive
the application.
7 IPA, senedivke & par? 2. tabve 4, tem 3; iP Reguiation. scnedule 2. latie 2, dem 25: IF Regitaton, schedule 1. peri 3 latte 4, len 7: Ankt Rivers Att
ction TEOG (wad ver area}.
Page 29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0052 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.