Construction Issues
53. A Construction Management Plan addressing all construction phases, including traffic
management, shall be prepared and submitted to Council for approval prior to obtaining
a Development Permit for Operational Works.
The report should aim to address every foreseeable problem that could occur during the
construction process and include recommendations on how these can be overcome or
minimised. The report shall be to the reasonable satisfaction of the Manager Land
Development.
Community Management Statement Requirements
54. The Applicant and all future owners of the site shall comply with the Environmental
Management Plan (EMP) for Settlers Cove Development 23118 DA and compliance with
the EMP shall be referenced in any community management statement over the site.
55. The Fire Management Plan is to be implemented by the Developer and future owners of
the site and is to be referenced in any community management statement.
General
56. A Registered Professional Engineer of Queensland shall certify engineering drawings
and specifications for all engineering works, which shall be submitted in conjunction with
an application for a Development Permit for Operational Works.
57. Any damage caused to any public utility during the course of construction shall be
repaired to Council’s standards and at no cost to Council.
58. Any alteration of any public utility or other facilities necessitated by the development of
the land or associated construction works external to the site shall be at no cost to
Council.
59. The transportation of all materials to and from the site shall be undertaken in a manner
such that no particle matter escapes onto a public road. All vehicles carrying materials
either to or from the site shall be covered to prevent materials including dust being
windblown from the vehicle.
BUILDING SERVICES
60. The following shall be complied with the development of the site:
60.1. There is to be no uncontrolled discharge of water onto the slope;
60.2. Stripping of vegetation for construction purposes should be minimised. If
vegetation is destroyed it should be reinstated immediately after construction is
completed;
60.3. Additional load due to fill, construction equipment or stockpiled materials should not
be located on the dune slope;
60.4. Vibration monitoring shall be carried out by the geotechnical engineer and
appropriate action taken should vibration effects be a concern;
60.5. A condition survey is to be carried out of adjoining buildings, structures and
services prior to any demolition works or construction works taking place on site. If
distress already exists, a photographic survey shall be undertaken, the distress
measured and a plan to monitor changes to distress shall be implemented. A copy
of this report is to be submitted to Council within 5 business days of survey and
prior to construction work proceeding;
60.6. A RPEQ is to be engaged by the client to oversee the piling works;
Page 9 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Compiled Decision Notice 132002.220611.4 14 Serenity Cl Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 70 KB (small file)
- File type
No other editions are linked here.