6. Volume 3 - Civil Engineering Services Report
Attached to the e-mail MCU16/0084 & OPW16/0157 Development Application - Landscaping Concept & Civil Engineering report (email 2 of 3).
SPECIFIC OUTCOMES ACCEPTABLE SOLUTIONS RESPONSE
land. areas to suppress dust;
(b) provision of dust stabilised or
sealed internal roads;
(c) protective covering of exposed
areas that are left for more than 2
weeks; and
(d) if there is no valid development
permit for the site, disturbed areas
are revegetated using species
identified in PSP3 - Landscaping
Plants and Guidelines;
AND
S4.2
Earthworks are undertaken only
during the hours of 7am to 6pm,
Monday to Friday and 7am to 6pm on
Saturday. No work is undertaken on
Sunday or public holidays.
Vegetative Waste S5.1 Any clearing of vegetation will comply
with Council’s Guidelines and be
O5 Cleared vegetation is transported off- carried out in an environmentally
site for disposal in an approved green responsible manner.
Vegetation cleared from a waste disposal facility;
development site is disposed of in an
environmentally responsible manner. OR
S5.2
Cleared vegetation is mulched on-
site and reused for landscaping of the
finished development;
OR
S5.3
Cleared vegetation is disposed of for
the purpose of firewood. (Note:
Disposal of vegetative waste by
burning off is not an acceptable
method of disposal).
Managing contamination risk S6.1 Clean fill will be used.
O6 The fill material is solid clean earth,
free of putrescible or refuse material,
Materials used as fill are suitable forvegetation, acid sulfate soils, building
development of the land and filling or or construction material or other
ii
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.