Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

6. Volume 3 - Civil Engineering Services Report

Attached to the e-mail MCU16/0084 & OPW16/0157 Development Application - Landscaping Concept & Civil Engineering report (email 2 of 3).

of 34

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

office



 SPECIFIC OUTCOMES                         ACCEPTABLE SOLUTIONS                      RESPONSE

 excavation works do not result in the     material or contaminants;
 contamination of land.
                                           AND

                                           S6.2

                                           The site is not on the contaminated
                                           land register.

 Haulage activity and amenity              No solution provided.                     To be managed by the contractor
                                                                                     during construction.
 O7

 Haulage of material to and from a site
 ensures—

(a) minimal disturbance to
      neighbouring properties and
      properties along the haulage
      route; and
(b) council’s road infrastructure
      including pavements is not
      adversely affected.
 Extent of earthworks                      S8.1                                      Earthworks will be contained within
                                                                                     the subject site.
 O8                                        All earthworks, including cut and fill
                                           batters, retaining walls etc. are
 Earthworks are contained within the       contained within the subject site.
 subject property.

 Sloping sites                             S9.1                                      The proposed development will
                                                                                     require filling up to 3.25m to facilitate
 O9                                        Cut or fill is less than 2m in depth      the service station carpark.
                                           relative to the natural ground surface.
 On sloping sites, excavation or filling                                             Refer to Engineering Services Report
 are designed to maximise the use of                                                 B16239CR001 prepared by Lambert
 natural slope and minimise the need                                                 & Rehbein.
 for cut and fill.

 Environmental protection                  No solution provided.                     N/A

 O10

 Earthworks minimise any adverse
 impact upon groundwater,
 watercourses, drainage lines,
 wetlands, and native vegetation.

 Dams                                      S11.1                                     N/A

 O11                                       Where the site is in the Rural Zone—

 Dam location and construction does (a) the land has a slope of less than




                                                             iii
Log in to download the original file

6. Volume 3 - Civil Engineering Services Report.pdf · 6.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.