6. Volume 3 - Civil Engineering Services Report
Attached to the e-mail MCU16/0084 & OPW16/0157 Development Application - Landscaping Concept & Civil Engineering report (email 2 of 3).
WATER SUPPLY AND SEWERAGE RETICULATION CODE
SPECIFIC OUTCOMES PROBABLE SOLUTIONS (IF COMMENTS
CODE ASSESSABLE)
14.164 Design and construction (water)
O1 Water supply infrastructure— S1.1 Water supply infrastructure is A water service and meter will be
designed in accordance with provided for the proposed
a) meets the needs of the users; PSP6 – Engineering Design development.
Standards — Water and
b) is designed to be compatible Refer to Engineering Services
Sewerage and As Constructed
with existing infrastructure; Report B16239CR001 prepared
data submitted in accordance
and by Lambert & Rehbein.
with PSP6 – Engineering
c) is designed using materials Design Standards — Water
that are suitable for the use, and Sewerage.
durable, easy to maintain and
cost effective, taking into
account the whole of life cycle
cost and Council’s
maintenance inventory.
O2 Water supply infrastructure is S2.1 Water supply infrastructure is Construction is to be in
constructed— constructed in accordance with accordance with the SEQ Code.
PSP6 – Engineering Design
a) in accordance with Standards — Water and
appropriate engineering Sewerage;
standards; and
S2.2 Erosion and sediment control
b) to minimise adverse measures are designed and
environmental impacts. implemented in accordance
with the Institution of Engineers
Australia (Queensland Division)
Soil Erosion and Sediment
Control - Guidelines for
Queensland Construction
Sites.
O3 Water supply infrastructure is No solution provided. Connection approval will be
proven to be suitable for its use sought from Unity Water.
prior to Council accepting the
dedicated asset.
O4 Water supply infrastructure is No solution provided. N/A
provided with all supporting
technical documentation.
O5 Where buildings or other S5.1 The footing of any building or N/A
structures are in proximity to structure is located clear of the
State or Council’s water supply zone of influence but no closer
infrastructure, provision is than 1.5m (measured
i
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.