Skip to the record
Accept no substitutions.

Original source · versioned page text

6. Volume 3 - Civil Engineering Services Report

Attached to the e-mail MCU16/0084 & OPW16/0157 Development Application - Landscaping Concept & Civil Engineering report (email 2 of 3).

of 34

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

SPECIFIC OUTCOMES                       PROBABLE SOLUTIONS (IF                  COMMENTS
                                            CODE ASSESSABLE)

    made to protect the                     horizontally) from infrastructure
    infrastructure from physical            including sewers, water mains
    damage and to allow ongoing             and stormwater structures;
    maintenance by Council.
                                        S5.2 A registered easement in
                                            favour of Council is created
                                            over all underground
                                            infrastructure located in private
                                            property;

                                        S5.3 The width of the easement is
                                            the greater of 3m or the width
                                            of the zone of influence;

                                        S5.4 The easement is centred over
                                            the centreline of the
                                            infrastructure.

O6 Alignment of water supply            S6.1 Infrastructure is designed and     The proposed water service and
    infrastructure allows for easy          constructed on the preferred        meter will be positioned to be
    access for the ongoing                  alignments in accordance with       accessible.
    maintenance by Council.                 PSP6 Engineering Design
                                            Standards – Water and
                                            Sewerage.

O7 Any alterations or repairs to        S7.1 Any alterations or repair to       The works required for connection
    infrastructure as a result of the       infrastructure as a result of the   will be completed at the developers’
    development are made at no              development are completed at        expense.
    cost to Council.                        the developer’s expense.




14.165 Design and construction (sewer)

O8 Sewerage reticulation                S8.1 Sewerage reticulation               Refer to the Engineering
    infrastructure—                         infrastructure is designed in        Services Report B16239CR001
                                            accordance with PSP6                 prepared by Lambert & Rehbein.
   a) meets the needs of the users;         Engineering Design Standards
                                            – Water and Sewerage.
   b) is designed to be compatible
      with existing infrastructure;
      and

   c) is designed using materials
      that are suitable of the use,
      durable, easy to maintain and
      cost effective, taking into
      account the whole of life cycle
      cost and Council’s



                                                         ii
Log in to download the original file

6. Volume 3 - Civil Engineering Services Report.pdf · 6.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.