Original source · versioned page text
6. Volume 3 - Civil Engineering Services Report
Attached to the e-mail MCU16/0084 & OPW16/0157 Development Application - Landscaping Concept & Civil Engineering report (email 2 of 3).
SPECIFIC OUTCOMES PROBABLE SOLUTIONS (IF COMMENTS
CODE ASSESSABLE)
the greater of 3m or the width
of the zone of influence;
S12.4 The easement is centred
over the centreline of the
infrastructure.
O13 Alignment of sewerage S13.1 Infrastructure is constructed Maintenance access will be
reticulation infrastructure is to allow on the preferred alignments in provided.
for easy access for the ongoing accordance with PSP6 –
maintenance by Council. Engineering Design Standards —
Water and Sewerage.
O14 Any alterations or repairs to S14.1 Any alterations or repair to The works required for connection
infrastructure as a result of the infrastructure as a result of the will be completed at the developers’
development are made at no cost to development are completed at the expense.
Council. developer’s expense.
iv
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.