Skip to the record
Accept no imitations.

Original source · versioned page text

6. Volume 3 - Civil Engineering Services Report

Attached to the e-mail MCU16/0084 & OPW16/0157 Development Application - Landscaping Concept & Civil Engineering report (email 2 of 3).

of 34

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

SPECIFIC OUTCOMES                     PROBABLE SOLUTIONS (IF                  COMMENTS
                                          CODE ASSESSABLE)

     maintenance inventory.

O9 Sewerage reticulation              S9.1 Sewerage reticulation              The proposed sewer property
    infrastructure is constructed—        infrastructure is constructed in    connection will be constructed in
                                          accordance with PSP6 –              accordance with the SEQ Code.
  a) in accordance with                   Engineering Design Standards
       appropriate engineering            — Water and Sewerage and
       standards; and                     As Constructed data submitted
                                          in accordance with PSP6 –
  b) to minimise adverse
                                          Engineering Design Standards
       environmental impacts
                                          — Water and Sewerage;

                                      S9.2 Erosion and sediment control
                                          measures are designed and
                                          implemented in accordance
                                          with the Institution of Engineers
                                          Australia (Queensland Division)
                                          Soil Erosion and Sediment
                                          Control - Guidelines for
                                          Queensland Construction
                                          Sites.

O10 Sewerage reticulation             No solution provided.                   Connection approval will be sought
    infrastructure is proven to be                                            with Unity Water.
    suitable for its use prior to
    Council accepting the
    dedicated asset.

O11 Sewerage reticulation             No solution provided.                   N/A
    infrastructure is provided with
    all supporting technical
    documentation.

O12 Where buildings or other          S12.1 The footing of any structure      N/A
    structures are developed              or building is located clear of
    adjacent to Council’s sewerage        the zone of influence but no
    reticulation infrastructure,          closer than 1.5m (measured
    satisfactory provision is made        horizontally) from infrastructure
    to protect the infrastructure         including sewers, water mains
    from physical damage and to           and stormwater structures;
    allow ongoing maintenance by
    Council.                          S12.2 A registered easement in
                                          favour of Council is created
                                          over all underground
                                          infrastructure located in private
                                          property;

                                      S12.3 The width of the easement is



                                                       iii
Log in to download the original file

6. Volume 3 - Civil Engineering Services Report.pdf · 6.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.