Original source · versioned page text
Traffic Impact Statement
51 Elanda Street TIS 2024-11-25 • After required clearance times the signal at ground level will turn green again. It must be noted that exact system specifications of the traffic signal system will be finalised during detail design and Building Approval once a contractor has been appointed to design and install such a traffic signal control system. The system will be similar to those which have been installed on numerous other residential developments and may include the following, but not limited to, specifications as illustrated in Figure 3.1. 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.