Skip to the record
Accept no imitations.

Original source · versioned page text

Traffic Impact Statement

of 52

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Detail of building configuration - pit floor

Drainage




                                                                                                            1-2%




                                                                                                                                 30
                                                                                             1-2%                         1-2%




                                                                                                                     50
                                       Floor drain                                                           50




                                                                                                                                 30
                                                2                                                           1-2%


                  70                                     70
                                                                                           70       Foundation              70



Detail of building configuration - pit edge

                  Maximum weight of on-site covering 250 kg/m².


Covering to be provided by the customer - asphalt or concrete

                                                                                     y
                                                     C                           y
                                            .                                        D




Covering to be provided by the customer - paving stones

       Paving stones                                 Angle steel to be provided by the customer after installation
              Separating layer                       Covering to be provided by the customer
                                        1 - 1.5                                  Drainage channel around the outside
                        1
                                  10




                                                                                           Height level, platform




 1   Sealing of the pit (see "Detail of building configuration - pit sealing", page 8)




Product data       MultiBase U10 EB          588.52.620-005       04/2023       English                                               7
Log in to download the original file

Traffic Impact Statement.pdf · 8.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.