Skip to the record
Accept no substitutions.

Original source · versioned page text

Traffic Impact Statement

of 52

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Supply cable to master switch - foundation earth                                  Maintenance shaft

The customer must lay the supply cable to the master switch during assem-         A separated maintenance shaft (with shaft cover, shaft ladder and access
bly. Functional capability can be checked by our engineers on site, in con-       to the pit) must be provided by the customer. A common maintenance shaft
junction with the electronics engineer. If this is not possible during assembly   may be sufficient for series systems, depending on the project.
for reasons attributable to the customer, the customer must commission an
electronics engineer.                                                             Ventilation
The customer must earth the steel structure with a foundation earth connec-
tion (earthing distance max. 10 m) and equipotential bonding in accordance        To ensure a continuous exchange of air, to reduce air humidity, prevent con-
with DIN EN 60204.                                                                densation and reduce vehicle moisture (from rain, snow, ice, etc.), we recom-
                                                                                  mend that the customer provide a ventilation system in conjunction with a
Operating element                                                                 HVAC engineer. This will help to minimise the risk of corrosion and resulting
                                                                                  faults.
The customer must provide an empty pipe (see "Electrical installation",
page 11) from the pit floor to the operating element. The position of the op-     Covering on the upper platform
erating element should be determined on a project-by-project basis (operat-
ing stands, house wall, etc.).                                                    Covering on the upper platform (maximum weight of covering to be provided
                                                                                  by the customer 250 kg/m²) in accordance with the sectional drawing (see
Installation                                                                      "Detail of building configuration - pit floor", page 7). This includes the correct
                                                                                  sealing of the pit (typical structure see "Detail of building configuration - pit
In general, the customer must provide a crane to aid installation of the tele-    sealing", page 8).
scopic lifting columns. Hook height min. 400 cm above entrance level, crane
load approx. 700 kg.


Subject to technical changes
In the course of technical progress, KLAUS Multiparking shall be entitled to use newer or different technologies, systems, processes or standards to pro-
vide the services than initially offered, provided that this does not disadvantage the customer in any way.




                   KLAUS Multiparking GmbH
                   Hermann-Krum-Straße 2
                   88319 Aitrach / Germany
                       +49 (0) 7565 508-0
                   [email protected]
                   www.multiparking.com




                   Product data       MultiBase U10 EB        588.52.620-005        04/2023       English                      www.multiparking.com
Log in to download the original file

Traffic Impact Statement.pdf · 8.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.