Performance specification
Description                                                                        Lower platform comprising:

Multiparking system for independent parking of 1 vehicle (single platform             Platform profiles
- SP), one on top of the other. Vehicles may only be parked on the upper              Adjustable positioning aid
platform if the platform has the appropriate positioning aid for the vehicle.         Chamfered ramps
Dimensions in accordance with the underlying pit, width and height dimen-             Side beams
sions.                                                                                Crossbeams
Access to the parking spaces horizontally (installation tolerance ± 1%).              Screws, nuts, washers, spacers, etc.
Special configuration of the lift and support structure prevents hindrance to
door opening.                                                                      Hydraulic system comprising:
Vehicle positioning in any parking space by positioning aid mounted on one
side (to be adjusted in accordance with the operating instructions).                  Hydraulic cylinders
Control via an operating element with key blocking by means of simultane-             Magnetic valves
ous key.                                                                              Hydraulic lines
Concise instructions at each operating point.                                         Bolted connections
                                                                                      High-pressure hoses
Multiparking system comprising:                                                       Attachments

   2 telescopic lifting columns at the rear with hydraulic cylinder (secured       Electrical system comprising:
   to the floor)
   2 telescopic lifting columns at the front (secured to the floor)                   Operating element (emergency-stop, key, 1 simultaneous key per parking
   1 upper platform/cover (for floor covering provided by the customer,               space)
   e.g. sand bed/stone covering). Maximum weight of on-site covering                  Switch cabinet with lockable master switch
   250 kg/m².
   1 lower platforms                                                               Hydraulic unit comprising:
   1 mechanical synchronisation system (for synchronised operation of the
   hydraulic cylinders when lifting and lowering)                                     Hydraulic unit (low-noise, fitted to bracket and bearing mounted on rub-
   2 hydraulic cylinders                                                              ber-metal block)
   Dowels, screws, connectors, bolts, etc.                                            Hydraulic oil tank
   The platforms are continuously accessible.                                         Oil filling
                                                                                      Internal gear pump
                                                                                      Pump holder
Upper platform comprising:
                                                                                      Coupling
   Trough for covering to be provided by the customer                                 Three-phase motor
   Cover sheets                                                                       Noise protection, motor protection switch and control fuse
   Side beams                                                                         Test pressure gauge
   Crossbeams                                                                         Pressure relief valve
   Screws, nuts, washers, etc.                                                        Hydraulic hoses (to attenuate noise transmission to the hydraulic pipes)


Services to be provided by the customer
Barriers                                                                           Drainage

Barriers that may be required in accordance with DIN EN ISO 13857 to secure        Functional drainage of the pit must be provided by means of a floor drain in
the pits where there are roadways immediately in front of, adjacent to or be-      the centre area that is connected to the sewer system or a pump sump. The
hind the systems. This also applies during the construction stage. Protective      water must be drained away by a pump provided by the customer. A slope
grilles on the systems, where required, are available for a surcharge.             from the corners of the pit/supporting surface of the lifting columns to the
                                                                                   floor drain/pump sump is required. In the interests of environmental protec-
Parking space numbering                                                            tion, we recommend coating the pit floor. Oil and/or fuel separators should
                                                                                   be installed in accordance with local regulations. To drain large quantities of
Parking space numbering, if required.                                              water from the yard area, the customer must install a water collection chan-
                                                                                   nel around the outside of the pit.
Building services systems
                                                                                   Warning marking
Any lighting, ventilation, fire-extinguishing and fire-alarm systems that may
be required, plus clarification and compliance with corresponding official         In accordance with DIN EN 14010, the customer must provide 10 cm wide,
documentation.                                                                     yellow/black marking in accordance with DIN ISO 3864 in the access area
                                                                                   along the edge of the pit to identify the hazard area.
Lighting
                                                                                   Wall openings
The customer must observe local regulations pertaining to the illumination
of parking spaces and roadways. In accordance with DIN EN 12464-1 ‘Light           Any wall openings that may be required should be in accordance with the
and lighting - Lighting of work places’, an illumination level of min. 200 lx is   sectional drawings (see "Width dimensions", page 5).
recommended for the parking spaces and operating area of the system or of
min. 50 lx for the maintenance shaft.




Product data      MultiBase U10 EB         588.52.620-005        04/2023       English                                                                      13
Log in to download the original file

Traffic Impact Statement.pdf · 8.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.