Original source · versioned page text
Attachment C SDAP Module 10
Attached to the e-mail MCU14/0084 Attachment B (4) Green Roof Plan & Att C - SDAP Module 10 Email 4 of 4.
Performance outcomes Acceptable outcomes Response Comment
roads or tracks.
AND
AO10.2 Development adjacent to state coastal land,
including land under tidal water:
(1) is located and designed to:
(a) allow safe and unimpeded access to, over,
under or around built structures located on, over
or along the foreshore
(b) ensure emergency vehicles can access the
area near the development, or
(2) minimises and offsets any loss of access to and
along the foreshore within two kilometres of the
existing access points, and the access is located and
designed to be consistent with (1)(a) and (b).
AND
AO10.3 Any parts of private development that extend over N/A
tidal water are to be designed, constructed and used for
marine access purposes only.
PO11 Private marine development AO11.1 Private marine development and other structures N/A
avoids structures attaching to, or such as decks or boardwalks for private use do not attach
extending across, non-tidal state coastal to, or extend across state coastal land that is situated
land abutting tidal waters. above the high water mark.
Editor’s note: For occupation permits or allocations of State land,
refer to the Land Act 1994.
PO12 Further development of artificial AO12.1 The design, construction and operation of artificial N/A
waterways avoids or minimises adverse tidal waterways maintains the tidal prism volume of the
impacts on coastal resources and their natural waterway to which it is connected.
values, and does not contribute to: AND
(1) an increase in the risk of flooding or
erosion AO12.2 The design, construction and operation of artificial N/A
tidal waterways does not increase risk from flooding.
(2) degradation of water quality
(3) degradation and loss of matters of
AND
state environmental significance AO12.3 The design, construction and operation of an N/A
(including, but not limited to, coastal artificial waterway in connection with the reconfiguration of
wetlands, fish habitat areas and a lot ensures:
migratory species habitat). (1) water inlet and outlets structures are of sufficient
capacity to maintain the water quality within the
waterway
State development assessment provisions Module 10 — Coastal protection 10.1 Tidal works, or development in a coastal management district state code
10 October 2014 V1.5 Page 10 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.