Skip to the record
Accept no substitutions.

Original source · versioned page text

Attachment C SDAP Module 10

Attached to the e-mail MCU14/0084 Attachment B (4) Green Roof Plan & Att C - SDAP Module 10 Email 4 of 4.

of 16

Page text shows just the words. Original shows the document exactly as it was published.

Performance outcomes                         Acceptable outcomes                                                Response      Comment
                                             (2) water discharged from the artificial waterway protects
                                                 the environmental values and water quality objectives
                                                 of the receiving waters
                                             (3) dredged material is not disposed of to tidal water
                                                 beyond the artificial waterway unless there is a
                                                 beneficial reuse, e.g. beach nourishment.

                                             Editor’s note: For more information on environmental values and
                                             water quality objectives see Schedule 1 of the Environment
                                             Protection (Water) Policy 2009.


                                             AND
                                             AO12.4 The location of the artificial waterways avoids             N/A
                                             matters of state environmental significance, or does not
                                             result in any significant adverse impact on matters of state
                                             environmental significance.

PO13 Development does not involve            No acceptable outcome is prescribed.                               N/A
reclamation of land below tidal water,
other than for the purposes of:
(1) coastal-dependent development,
     public marine development or
     community infrastructure
(2) strategic ports, boat harbours or
     strategic airports and aviation
     facilities, in accordance with a
     statutory land use plan, where there
     is a demonstrated net benefit for the
     state or region and no feasible
     alternative exists
(3) coastal protection work or work
     necessary to protect coastal
     resources or physical coastal
     processes.



Table 10.1.2: Operational work
Performance outcomes                         Acceptable outcomes                                                Response      Comment
PO1 Tidal works that is private marine       AO1.1 The location and design of tidal works that is               N/A
development does not result in adverse       private marine development:


State development assessment provisions                                        Module 10 — Coastal protection              10.1 Tidal works, or development in a coastal management district state code
10 October 2014 V1.5                                                                                                                                                                 Page 11 of 16
Log in to download the original file

Attachment C SDAP Module 10.pdf · 89 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.