Attachment C SDAP Module 10
Attached to the e-mail MCU14/0084 Attachment B (4) Green Roof Plan & Att C - SDAP Module 10 Email 4 of 4.
Performance outcomes Acceptable outcomes Response Comment
(1) treated to the quality of the receiving waters prior
to discharge, OR;
(1) reclaimed or re-used such that there is no export
of pollutants to receiving waters.No acceptable outcome is
prescribed.
Table 10.1.3: Reconfiguring a lot
Performance outcomes Acceptable outcomes Response Comment
PO1 Erosion prone areas in a coastal AO1.1 Where reconfiguring a lot is proposed within the N/A
management district are maintained as coastal management district, the erosion prone area
development free buffers, or where within the lot, or land within 40 metres of the foreshore
permanent buildings or structures exist, (whichever is greater), is surrendered to the State for
coastal erosion risks are avoided or public use unless:
mitigated. (1) the development is in a port or is for coastal-
dependent development, or
(2) the surrender of the land will not enhance coastal
management outcomes, for example, because there
is already substantial development seaward of the lot.
Editor’s note: Land surrendered to the State for public use under
AO1.1 is to be:
(1) placed in a State land reserve for beach protection and
coastal management purposes under the Land Act 1994,
with local government as trustee, or
(2) managed for beach protection and coastal management
purposes under another management regime to the
satisfaction of the chief executive administering the
Sustainable Planning Act 2009 and Land Act 1994, if it is
demonstrated that AO1.1(1) cannot be reasonably
achieved.
(3) The Land Act 1994 also includes provisions for voluntary
land surrender for freehold land to the satisfaction of the
chief executive administering the Land Act.
PO2 Development maintains or AO2.1 Reconfiguring a lot that abuts the foreshore or tidal N/A
enhances general public access to or waters is designed to enhance public access if it involves
along the foreshore, unless this is the creation of 10 or more lots or the opening of a new
contrary to the protection of coastal road, unless it is for coastal-dependent development.
resources or public safety.
PO3 Development in connection with a AO3.1 The canal avoids intersecting with land or tidal land N/A
canal enhances public access to coastal where the passage, use or movement of vessels in water
waters. could be restricted by the registered proprietor of the land.
State development assessment provisions Module 10 — Coastal protection 10.1 Tidal works, or development in a coastal management district state code
10 October 2014 V1.5 Page 15 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.