Attachment C SDAP Module 10

Attached to the e-mail MCU14/0084 Attachment B (4) Green Roof Plan & Att C - SDAP Module 10 Email 4 of 4.

of 16

Page text shows just the words. Original shows the document exactly as it was published.

Performance outcomes                        Acceptable outcomes                                               Response      Comment
                                            Department of Environment, Water, Heritage and the Arts, 2009

Within a strategic environmental area: riparian and wildlife corridor functions
PO5 Where clearing of native marine         AO5.1 Clearing of marine plants is minimised and an               N/A
plants cannot be avoided and the extent     environmental offset is for any significant residual impact
of clearing has been minimised, an          from the clearing
environmental offsets is provided for any
significant residual impact from the        AND
clearing.
                                            AO5.2 Any clearing of marine plants is limited to the             N/A
                                            minimum area required for the works and to allow for
                                            maintenance.

PO6 Natural regeneration of any cleared     AO6.1 There is no impediments to the natural                      N/A
or work areas is facilitated                regeneration of native plant species in the area of clearing
                                            and works following completion of works.

PO7 Development avoids or minimises         AO 7.1 Development avoids, or minimises adverse                   N/A
adverse impacts on fish passage.            impacts on fish passage during works and the carrying out
                                            of the activity.

PO8 Development avoids or minimises         AO8.1 Works are located, designed, and constructed to             N/A
impacts on fish habitat values.             minimise impacts on fish habitat values and function.

Within a strategic environmental area: hydrological processes
PO9 Development avoids or minimises       No acceptable outcome is prescribed.                                N/A
impacts on natural drainage lines or flow
paths, during both construction and
operation.
Within a strategic environmental area: water quality
PO10 Development avoids or minimises        AO10.1 Development demonstrates best practice                     N/A
any adverse impacts on environmental        environmental management to meet relevant
values and water quality objectives for     environmental values and water quality objectives of the
receiving waters (surface and               Environmental Protection (Water) Policy or relevant to the
groundwater) from pollutants on site or     ERA to be carried out on the site.
leaving a site located in a strategic
environmental area.                         OR

                                            AO10.2 All stormwater, wastewater, discharges and                 N/A
                                            overflows leaving the site are:



State development assessment provisions                                      Module 10 — Coastal protection              10.1 Tidal works, or development in a coastal management district state code
10 October 2014 V1.5                                                                                                                                                               Page 14 of 16
Log in to download the original file

Attachment C SDAP Module 10.pdf · 89 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.