OPW16/0021
3. Copies of the approved plans, duly signed by the supervising consultant
Registered Professional Engineer of Queensland (RPEQ) must be provided to
Council’s Engineering Officer Construction at the “pre start” meeting.
4. A detailed condition report of the following must be completed and submitted to
Council at the prestart meeting and prior to any works commencing. The report
must include but not be limited to:
a. photographs of the access easement and the adjoining fencing/walls
b. photographs of the frontage of the site,
c. photographs of the lead in roads (Solway Drive, Bryan Street and Seaview
Terrace),
d. photographs of the existing landscaping along lead in roads and the access
easement,
e. any private properties that could potentially be impacted on by the works
(particularly directly adjoining properties and other properties adjacent to the
access easement).
5. Certificates demonstrating currency of public liability insurance and works
insurance covering the works must be submitted to Council at the prestart meeting.
6. Council must be contacted at least 5 working days prior to any works commencing
to organise a prestart. The contact number to arrange a pre-start meeting is
53296244*. The pre-start meeting must include the relevant parties for the
following aspects of the works:
a. Civil engineering and stormwater drainage works;
b. Landscaping;
c. Erosion and sediment control works;
d. Other relevant parties.
(*) refer to advisory notes
7. A Construction Management Plan must be submitted to Council for approval prior
to the pre-start meeting. The CMP must be generally in accordance with the
requirements of Condition 17 of the higher order approval (MCU14/0084) and must
include but not be limited to:
a. Maintenance and protection of water quality and existing drainage lines
through the construction site through the implementation of appropriate
erosion and sediment control measures.
b. Works programme identifying key components of the works and their
respective durations.
c. Establishment of a communication protocol with the general public, adjoining
owners, emergency services and local businesses to advise construction
times, impacts on traffic, on-street parking, delivery of services and other
relevant issues.
d. The works must not impede the legal use of the access handle by the
benefited parties without their prior agreement. An effective notification
procedure must be in place in this regard to advise the affected parties.
e. identification of complaint management procedures including:
Page 4 of 15
Document Set ID: 20097969
Version: 1, Version Date: 12/07/2016 Print Date: 12 July 2016, 2:14 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.