24647 Seaview Tce Enviro Mgmt Plan

Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).

of 212

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Noosa Council documents




                                                                                                      OPW16/0021


                                       i.    Contact details for the on-site manager.
                                       ii.   Dispute resolution procedures.
                      8.      Traffic management during all aspects of the construct phase including shall be
                              generally in accordance with Sea View Terrace Traffic Management Plan and its
                              attachments (6 diagrams) prepared/compiled by Hutchinson Builders dated March
                              2016. The plan and its MUTCD must be amended prior to the prestart to include
                              this changes:
                              a.       The proposed No Parking 6am-6pm workdays on the west side of Seaview
                                       Terrace shall apply only to the last two parking spaces (ie approximately the
                                       last 15m before the cul-de-sac head).
                              b.       Maintenance of safe pedestrian access along Seaview Terrace at all time.
                              c.       No queuing of trucks is permitted on residential streets, especially prior to
                                       7.00am. Parked trucks must have engines turned off.
                              d.       All reasonable efforts must be made to minimise impact on traffic flow and
                                       the availability of parking spaces for local residents
                      9.      If any additional parking or traffic restrictions are required on Seaview Terrace
                              these restrictions must be approved in writing by Council prior to the
                              implementation of any additional restrictions.
                      10.     Any changes to the details associated with the supervising RPEQ or Principal
                              Contractor during construction, must be notified to council in writing within five
                              business days of the change occurring.
                      11.     Any conflict between the development and an existing or proposed service must be
                              referred to the relevant service authority for determination prior to commencement
                              of works.
                      DURING CONSTRUCTION
                      Engineering
                      12.     The developer must meet any costs to repair damage to any Council asset during
                              construction, where damage is a result of the development works. Damage to
                              assets must be repaired immediately where it creates a hazard to the community.
                              In circumstances where the damage does not create a hazard to the community, it
                              must be repaired immediately on completion of the works associated with the
                              development.
                      13.     All works must be supervised by a Registered Professional Engineer of
                              Queensland (RPEQ) who is independent of the Developer and Principal
                              Contractor, and they must certify that all works conform to the Operational Works
                              permit.
                      14.     All works must be constructed and work procedure undertaken in accordance with:
                              a.       The approved plans and conditions detailed in this Decision Notice.
                              b.       The relevant conditions of the higher order Material Change of Use approval
                                       MCU14/0084 to which this approval relates.
                              c.       All relevant Noosa Council Planning Scheme Policies and standard
                                       specifications and guidelines.




                                                                                                             Page 5 of 15


Document Set ID: 20097969
Version: 1, Version Date: 12/07/2016                                                                   Print Date: 12 July 2016, 2:14 PM
Log in to download the original file

24647 Seaview Tce Enviro Mgmt Plan.pdf · 18.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.