24647 Seaview Tce Enviro Mgmt Plan

Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).

of 212

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Noosa Council documents




                                                                                                         OPW16/0021


                              a.       Clearly delineating the Open Space Conservation and Rural Settlement zone
                                       boundary with protective fencing.
                              b.       The protective fencing must have signage installed at regular intervals facing
                                       the development stating the area is a protected area and nom unauthorised
                                       access is permitted.
                              c.       Any dogs on–site during the construction period must be restrained and are
                                       not permitted in the Open Space Conservation zone.
                              d.       Prohibiting entry to the Open Space Conservation zone during construction
                                       unless to undertake approved works.
                              e.       restricting stockpiling, storage and works to Rural Settlement zone
                      25.     Rehabilitation of disturbed areas of the Open Space Conservation zone must:
                              a.       Be undertaken immediately following completion of the works that required
                                       the disturbance.
                              b.       Be undertaken as soon as possible and no later than 7 days after the
                                       disturbance if the disturbance has been unplanned or a result of accident,
                                       mishap or deliberate action by any persons.
                              a.       Result in the area being stable and revegetated.
                              b.       Be established with revegetation works.
                              c.       Be revegetated with a species mix and density reflective of the local variant
                                       of the Regional Ecosystem, site specific conditions and infrastructure
                                       requirements.
                      Green Roof/Walls
                      26.     The plants and support systems to the Green Roof and Walls must be maintained
                              for the life of the development to ensure screening of the walls and rooves from the
                              beach and adjacent public areas. Any plant and support systems failures must be
                              replaced within 28 days of the failure occurring.
                      Landscaping Supervision and Certification
                      27.     Landscape works must be supervised, undertaken and certified by qualified
                              persons*. All works must be completed in accordance with this Decision Notice.
                              (* Refer to Advisory Note)
                      28.     Prior to commencement of use the following (prepared by a qualified person* and
                              certifying compliance with approvals) must be submitted to Council:
                              a.       Landscaping certification confirming all works have been constructed in
                                       accordance with conditions of approval.
                              (* Refer to Advisory Note)
                      Erosion & Sediment Control
                      29.     A construction hold point with a council delegate and supervising RPEQ must be
                              established prior to commencement of the development. The hold point must be
                              held as soon as reasonably practical and prior to the first rain event forecast
                              following initial tree clearing or removal of soil stabilising material. At the hold point
                              inspection, all required sediment controls, drains and bunds to divert waters away
                              from disturbed soil or soils about to become exposed through cut to fill activities




                                                                                                              Page 7 of 15


Document Set ID: 20097969
Version: 1, Version Date: 12/07/2016                                                                      Print Date: 12 July 2016, 2:14 PM
Log in to download the original file

24647 Seaview Tce Enviro Mgmt Plan.pdf · 18.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.