24647 Seaview Tce Enviro Mgmt Plan

Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).

of 212

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Noosa Council documents




                                                                                                    OPW16/0021


                              d.       The latest version of the Healthy Waterways document “Water Sensitive
                                       Urban Design Technical Design Guidelines for South East Queensland” for
                                       all water quality devices to be constructed on site
                      Works within Road Reserve – Reinstatement Works
                      15.     Safe pedestrian access on all streets in the vicinity of the development must be
                              maintained at all times. Should footpath or road closures be necessary to carry out
                              construction works, Council’s Engineering Officer must be notified prior to the
                              proposed closure and all requirements complied with.
                      16.     Any road reinstalment works required due to the development works must match
                              neatly with existing road and verge/footpath features to the reasonable satisfaction
                              of Council. The grassed verge should generally have a maximum crossfall of 5%,
                              except in the location of a pathway where the maximum crossfall is to be 2.5%.
                      Earthworks and Retaining Walls
                      17.     All earthworks, stabilisation works, piling works and earth retention works must be
                              undertaken generally in accordance with the approved plans and must be carried
                              out in compliance with the provisions of AS 3798 Guidelines on Earthworks for
                              Commercial and Residential Development, with geotechnical testing undertaken in
                              accordance with Section 8 of the Standard, and to a minimum of ‘Level 1’ as
                              defined in Appendix B. Test results as required by AS 3798, and a certificate of
                              quality, uniformity and stability of the earthworks must be provided by a RPEQ and
                              submitted to Council at the completion each stage of Earthworks or as otherwise
                              agreed on in the prestart meeting.
                      18.     All earthworks, batters and stabilisation and earth retention works must be
                              contained wholly within the property boundaries unless written consent from the
                              owners of the affected properties is submitted to and accepted by Council prior to
                              the works being undertaken.
                      Stormwater Drainage - General
                      19.     Appropriate scour protection must be provided at the outlet of all stormwater pipes
                              including temporary outlets.
                      20.     Works associated with this permit must not adversely impact on the existing
                              drainage conditions on other properties (eg by concentrating, blocking or
                              interfering with natural overland flows).
                      21.     Construction of all internal stormwater drainage works must comply with the
                              relevant section/s of Australian Standard AS/NZS 3500.3.
                      LANSCAPING AND CONSERVATION AREA

                      Open Space Conservation Area

                      22.     Existing trees on site must be retained, except where required to be removed to
                              accommodate the approved dwelling. In this regard, the removal of vegetation
                              must not extend beyond 3m of the building footprint.
                      23.     No clearing is permitted within the Open Space Conservation zone, unless
                              authorised by conditions of this permit or further operational works permit.
                      24.     All vegetation in the Open Space Conservation zone must be protected from
                              clearing or construction activities by:




                                                                                                         Page 6 of 15


Document Set ID: 20097969
Version: 1, Version Date: 12/07/2016                                                                 Print Date: 12 July 2016, 2:14 PM
Log in to download the original file

24647 Seaview Tce Enviro Mgmt Plan.pdf · 18.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.