OPW16/0021
b. The final dimensions of the rock dissipaters form each bioretention basin.
These must be the minimum size necessary to effectively dissipate flows
from the bioretention basin in accordance with QDUM calculations.
The final location and design of the dissipaters shall be determined at a time
agreed between Council Officers and the applicant’s representatives during the
pre-start meeting. The final location of drain outfalls must be to the mutual
agreement of Council Officers and the Geotechnical Engineer. The Geotechnical
engineer must certify that the location and design of drain outfalls will not affect
slope stability.
38. Screening vegetation must be provided around and throughout the rock dissipaters
to ensure they are not visible from any point on the designated National Park
walking trails.
Water Sensitive Design
39. Stormwater drainage works on the site must be generally in accordance with the
approved plans and as amended by theses conditions and/or by annotation by
Council.
40. Stormwater management on the site must be generally in accordance with the
Stormwater Management Plan - 71 Seaview Terrace, Sunshine Beach Markus
Hasler by Aqua Intel Date 6 May 2016 Doc No.2014022-RPT-003.
41. During construction and establishment of the bioretention devices, the supervising
RPEQ must certify forms contained in section 3.15 of the Construction and
Establishment Guidelines: Swales, Bioretention Systems and Wetlands (Water by
Design, 2009). These forms and certification must be submitted to council prior to
commencement of use.
42. The bio retention basins must be installed with an impervious liner. The impervious
liner must replace the filter cloth as referenced on Drawing 14517-OP32 Rev C
dated 4 may 2016 by Tod Consulting.
43. A construction hold point with a council delegate must be established once the
impervious liner is installed in the excavation for each bioretention basin. At the
time of inspection, the underdrainage pipes along with a sample of the drainage
layer, transition layer, and filtration media materials must be stockpiled onsite
accompanied by laboratory results that demonstrate that the media complies with
the specifications contained in the latest version of the Guidelines for Soil Filter
Media in Bioretention Systems (Facility for Advancing Water Biofiltration) and that
the minimum hydraulic conductivity of 180mm/hr or as specified on the approved
engineering plans will be achieved. The drainage layer, transition layer, and
filtration media materials shall not be installed until the catchment draining to the
bioretention device has 80% groundcover as determined by council’s delegate.
44. 80% of the catchment flowing to the bioretention basins must be effectively
stabilised prior to the construction holdpoint for the Bioretention device.
Bioretention Devices - Landscaping
45. The boiretention basins must be vegetated with at least five of the following
species, at a minimum density of 8 plants/m2:
a. Carex appressa
b. Carex fascicularis
Page 9 of 15
Document Set ID: 20097969
Version: 1, Version Date: 12/07/2016 Print Date: 12 July 2016, 2:14 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.