Original source · versioned page text
24647 Seaview Tce Enviro Mgmt Plan
Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).
The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnNoosa Council documents
OPW16/0021
c. Ficinia nodosa
d. Juncus usitatis
e. Lomandra longifolia
f. Ghania sieberiana
46. Landscape plans for the areas surrounding the bioretention basin filter media
footprint must be arranged to minimise shading to the filter media footprint are.
Suitable plants include the following:
a. Carex appressa
b. Carex fascicularis
c. Ficinia nodosa
d. Juncus usitatis
e. Lomandra longifolia
f. Ghania sieberiana
g. Banksia robur
h. Dianella brevipendunculata
i. Themada triandra
j. Cymbopogan refractus
k. Melaleuca thymifolia
47. Where landscaping/garden beds are proposed adjacent to the bioretention basin, a
900mm deep root barrier must be installed to the interface between the
landscape/garden/forest area and the bioretention basin to prevent root intrusion to
the biobasin infrastructure.
Bioretention Devices - Education
48. Each bioretention basin shall be provided with approved permanent signage to
educate the property owner on the function of the bioretention basin. The wording
for the signage for each bioretention basin is to include: “BIORETENTION BASIN -
This bioretention reduces the amount of heavy metals, suspended solids, and
nutrients discharged from hardstand areas of this site to the receiving water course
within Noosa National Park”.
FOLLOWING CONSTRUCTION
Certification
49. Upon completion of the work a certificate must be issued by the supervising RPEQ
certifying that all stormwater works and earthworks have been constructed in
accordance with the Operational Works permit.
As Constructed Plans
50. Upon the completion of the operational works the lodgement of satisfactory “As
Constructed” plans must be submitted to Council for records purposes. The “As
Constructed” information must include:
a. Drawings and data certified by a qualified experienced Civil Engineer
(RPEQ) for design intent, and certified by a Licensed Surveyor in regard to
the cadastre and the location, level and type of all services and structures.
Page 10 of 15
Document Set ID: 20097969
Version: 1, Version Date: 12/07/2016 Print Date: 12 July 2016, 2:14 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.