Original source · versioned page text
24647 Seaview Tce Enviro Mgmt Plan
Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).
The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnNoosa Council documents
OPW16/0021
b. Landscape/planting plans.
5. REFERRAL AGENCIES
Not Applicable for the Operational Works Application
6. REFERENCED DOCUMENTS
The following documents are referenced in the assessment of the application:
1. Stormwater Management Plan - 71 Seaview Terrace, Sunshine Beach Markus
Hasler by Aqua Intel Date 6 May 2016 Doc No.2014022-RPT-003.
7. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not
form part of the assessment manager conditions:
General Advisory Notes
1. Council has undertaken an audit check of the Operational Works drawings in
relations to the proposed works. A detailed check of the calculations and drawings
has not been undertaken, as they have been certified by a RPEQ. The RPEQ
bears full responsibility for all aspects of the engineering design. Council reserves
the right to require further amendments and/or additions at a later date should
design errors become apparent.
2. Council reserves the right to call up any performance bond held or levy charges
against the property, should emergency works be required to be undertaken by
Council to make the site safe due to inactivity on the development site for
extended periods of time.
3. Should any changes or modifications to the approved plans be required as a result
of construction constraints, a “Request to change an existing approval” under the
Sustainable Planning Act 2009 must be made. Amended plans clearly indicating
the changes must be lodged with this application along with the appropriate fees.
Arranging Prestart Meeting
4. Contact Council on 5329 6244 to arrange a prestart or an inspection giving a
minimum of 5 business days notice of preferred inspection time.
It should be noted prior to arranging a pre-start meeting the Right of Appeal Period
of 20 business days should have been passed or the applicant has have confirmed
by a letter or an email that he/she has accepted the conditions of Decision Notice
and waived his/her appeal right.
Qualified Person - Landscaping
5. Supervising landscape works and preparing a landscape certification, is
considered to be a landscape architect, landscape designer or horticulturist with a
minimum of three years current experience in the field of landscape design.
Environmental Advisory Note
6. The Environmental Protection Act 1994 states that a person must not carry out any
activity that causes, or is likely to cause, environmental harm unless the person
takes all reasonable and practicable measures to prevent or minimise the harm.
Environmental harm includes environmental nuisance. In this regard persons and
Page 11 of 15
Document Set ID: 20097969
Version: 1, Version Date: 12/07/2016 Print Date: 12 July 2016, 2:14 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.