Original source · versioned page text
24647 Seaview Tce Enviro Mgmt Plan
Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).
The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnEnvironmental Management Plan 24647 – 71 SEAVIEW TCE SUNSHINE BEACH will be available in the site office. All emergency contacts will be recoded on the Emergency Contacts for site template (WHSMP – Appendix 8 – Appendix A) and be displayed on the site notice board. The general procedure for managing environmental emergencies is provided in Appendix F. Members of the Emergency Control Structure (ECS) will receive the relevant training to enable them to respond to identified environmental emergency situations in accordance with EMSM Section 6.3.2 Included in the site specific induction all workers will receive appropriate training in Emergency Response Procedures. The ERP must be regularly tested and information revised regularly to ensure all details are current, including: The names of key response personnel Personnel responsibilities and contact details, including after-hours contact Contact details of emergency services The location of on-site information on hazardous materials, including SDSs and spill kits Information about minimising / controlling the emergency Procedures for notifying project management, regulators and public, if necessary. 6. Training, Awareness & Competency (EMSM Section 6.3.2) 6.1 Induction Prior to working onsite all personnel and subcontractors will complete an environmental induction informing them of: Hutchinson Builders Environmental Policy; Legal requirements, including their duty of care under the State Environmental Protection Act; The purpose, objectives and key elements of the EMP ; Environmental responsibilities; Significant environmental issues relevant to the site; Key environmental control measures; Incident avoidance, management, emergency plans, and response; Reporting process for environmental harm/incidents; and Protection and maintenance of environmental controls. A copy of the EMP and related documents will be maintained on-site by the Site Manager/HSE Advisor and made accessible to personnel and subcontractors on the site. All subcontractors are responsible for ensuring personnel are aware of site environmental management measures and adequate materials are available to implement these. 6.2 Environmental training Staff working onsite shall be provided with environmental training to achieve a level of awareness and competence appropriate to their assigned activities where required. Targeted environmental training will be provided to individuals or groups of workers with a specific authority or responsibility for environmental management or those undertaking an activity with a high risk of environmental impact. This training will be prepared and delivered by the HSE Advisor or Corporate Environmental Advisor in alignment with the specific Site Training Register HB-HSEQ-F-031. The HSE Advisor will maintain an up to date register (Refer WHSMP - Appendix 7 Site Training Register) for the site. Subcontractors should also maintain training details of any additional environmental awareness or competence training provided to personnel, and make records available to site management upon request. HUTCHINSON BUILDERS 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.