Original source · versioned page text
24647 Seaview Tce Enviro Mgmt Plan
Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).
The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn2. Site Description and Scope
The 9,942m2 site is currently vegetated with no structures or buildings. The site is located within the Noosa
Shire Council area and is bounded by Noosa National Park to the north, Sunshine Beach to the east and
residential properties to the west and south. Access to the site is via an easement between the south
western corner of the site and the end of Seaview Terrace, along the western boundaries of Lots
2/RP189884, 3/RP189884 and 4/RP189884.
The proposed residence is located on the upper slopes of the allotment, close to the western boundary. It
comprises multiple living levels with an outdoor pool located east of the living areas. The development will
be benched into the natural slope by cutting with some minor filling.
Key elements relevant to soil and water management include:
Earthworks to achieve design levels
Construction works
Construction of permanent stormwater drainage
3. Objectives
This ESCP has been developed by an experienced CPESC in accordance with:
Best Practice Erosion and Sediment Control (IECA 2008)
The following targets, if achieved are expected to meet the abovementioned objectives.
Coarse Sediment (>0.02mm) Retain all coarse sediment on site, where practical.
Fine sediment (<0.02mm) Drain all disturbed areas on the site to a suitably designed and installed
sediment control device, as defined by a site specific erosion risk
assessment
71 Seaview Terrace, Sunshine Beach - Erosion and Sediment Control Plan Page 2
Hutchinson Builders
17SUN-0024/1600102
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.