24647 Seaview Tce Enviro Mgmt Plan

Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).

of 212

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
6.1.           ‘Clean’ Water
A clean water catchment has been identified in the Stormwater Management Plan (SMP) prepared by
Aquaintel (dated May 2016). This catchment includes the existing properties to the west of the site.
Upslope clean water will be diverted by a Clean Water Drain (CWD) around the work area, discharging via a
level spreader into the nature reserve. Sizing of the CWD has been undertaken, as detailed in Table 3. The
exact location of the drain is to be determined on site prior to the commencement of works, once the
discharge location of the external catchment into the site can be identified.
In accordance with Item 32 of the Noosa Council Decision Notice, temporary drainage has been designed
for the 1 in 5 year ARI event, assuming a 12 to 24 month construction period. The peak flow rate for the
0.286ha external catchment has been taken from Table 8 of the Aquaintel SMP
Table 3 – Clean Water Diversion Drain Design Summary


 Drain       Peak Flow          Slope         Design.          Base Width   Minimum      Horizontal Side        Proposed
  ID           (m3/s)            (%)       Velocity (m/s)         (m)       Depth (m)    Slope of Bund         Lining/Max
                                                                                                              Velocity (m/s)

CWD 1         0.153(1)           2.9                  1.5          0.6       0.27(2)          1:2             Geofabric / 1.5

NOTE:      (1) Refer Table 8 of Aquaintel SMP
           (2) Depth includes freeboard

6.2.           ‘Dirty’ Water
Runoff generated from internal disturbed areas will be conveyed primarily within dirty water diversion
bunds. These will direct runoff from those areas to the installed sediment control measures (sediment
basin). In accordance with Item 32 of the Noosa Council Decision Notice, the dirty water diversion bunds
have been designed for a 1 in 5 year event. A summary of design specifications can be seen in Table 4.

Table 4 – Dirty Water Diversion Bund Design Summary


  Diversion         Peak Flow           Design Flow           Allowable      Minimum        Horizontal Side       Proposed
  Bund ID             (m3/s)             Velocity           Flow Velocity   Depth (m)*      Slope of Bund           Lining
                                           (m/s)                (m/s)

    DB 1                 0.01                   0.3              1.5           0.23                 1:2          Geotextile

    DB 2                 0.01                   0.9              1.5           0.23                 1:2          Geotextile

    DB 3                 0.03                   0.6              1.5           0.20                 1:2          Geotextile

    DB 4                 0.01                   0.7              1.5           0.21                 1:2          Geotextile

* Depth includes freeboard

A standardised diversion bund is proposed across the site, details of which are illustrated in Figure 2.




71 Seaview Terrace, Sunshine Beach - Erosion and Sediment Control Plan                                                   Page 6

Hutchinson Builders
17SUN-0024/1600102
Log in to download the original file

24647 Seaview Tce Enviro Mgmt Plan.pdf · 18.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.