Log in to see the plans as drawn7. Sediment Control
A Type 1 control (i.e. a sediment basin) is not triggered by IECA (2008) due to the fact that the disturbed
area is less than 2,500m². However, due to the potential soil loss and the proximity to conservation area, a
sediment basin is proposed. Item 33 of the Noosa Council Decision Notice requires that all discharges from
the site up to and including the 85th percentile 5 day rainfall event must not exceed 50mg/L of Total
Suspended Solids (TSS). To achieve this objective, calculations have been undertaken to determine the
sediment basin volume required to capture the 85th percentile 5 day rainfall event (i.e. 46mm).
A summary of sediment basin design specifications is provided in Table 6. A weighted average runoff
coefficient has been determined, assuming 90% of the site is compacted (Cv = 1.0), while the remaining
10% of the site is uncompacted, Class A material (Cv = 0.22). Therefore, the runoff coefficient applied to
the sediment basin calculation, Cv = 0.92.
Table 6 – Sediment Basin Design Summary
Catchment Area Design Rainfall Settling Zone Sediment Storage Volume Total Volume at Spillway
(ha) Event (mm) Volume (m3) (RUSLE) (m3)* (m3)
0.23 46.0 97.3 40.6 137.9
* Assumes a 3 month maintenance period
The required storage volume will be provided within the excavations to be undertaken for the proposed
pool. It is expected that due to the sandy nature of the site, settling of sediments will occur quite rapidly.
Testing of runoff captured in the basin must be undertaken prior to discharge from the site to ensure it
complies with the discharge criteria of 50mg/L of TSS. If required, flocculation will be undertaken to assist
in the settling of sediment particles.
*Note: a correlation may be established between site TSS and NTU by sampling and analysis of captured
surface water and the relative NTU limit may be adopted in place of TSS*
7.1. Emergency Spillway
An Emergency Spillway has been included as part of the design for the proposed site sediment basin. The
spillway has been sized for a 1 in 50 year event. A summary of design parameters is included in Table 7.
Table 7 – Spillway Design Summary
Time of Rainfall Peak Flow Channel Minimum Horizontal Side Proposed Lining
Concentration Intensity (m3/s) Base Width Depth (m) Slope of Weir
(min) (mm/hr) (m)
5 292 0.19(1) 5.0 0.40(2) 1:2 Geotextile
NOTE: (1) 1 in 50 year ARI event
(2) Depth includes freeboard
71 Seaview Terrace, Sunshine Beach - Erosion and Sediment Control Plan Page 8
Hutchinson Builders
17SUN-0024/1600102
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.